ALTERNATOR GP-CHARGING 1358401 - Caterpillar



1358401 ALTERNATOR GP-CHARGING Caterpillar parts 313B
Rating:
54
Alternative (cross code) number:
CA1358401
135-8401
1358401
Caterpillar 1358401 ALTERNATOR GP-CHARGING

Buy ALTERNATOR GP-CHARGING 1358401 Caterpillar genuine, new aftermarket tractor parts with delivery
EXCAVATOR,

Compatible equipment models: 1358401:

EXCAVATOR  313B   Caterpillar
Number on catalog scheme:
  For full view, you need register

Caterpillar parts catalog:

Caterpillar parts catalog
313B CR EXCAVATOR BAS00001-UP (MACHINE)


Information:

During combined operations of BOOM RAISE and STICK IN, the pilot oil pressure from the pilot control valve for the boom (30) activates the pressure reducing valve for boom priority (23) . The pressure reducing valve for boom priority (23) causes oil flow priority to the head end of the boom cylinders (25) during this combined hydraulic operation.When the joystick for the stick is moved to the STICK IN position, a portion of the pilot oil from the pilot control valve for the stick (41) flows through the pressure reducing valve for the boom priority (23) to the stick II control valve (40) . As the joystick for the boom is moved farther from the NEUTRAL position during a BOOM RAISE operation, pilot oil pressure from the pilot control valve for the boom (30) increases. This gradual increase in pilot oil pressure causes the spool in the pressure reducing valve for the boom priority (23) to gradually shift.A portion of the pilot oil that flows to stick II control valve (40) from the pilot control valve for the stick (41) is routed to the hydraulic tank. The pilot oil pressure that acts on stick II control valve (40) decreases. Stick II control valve (40) shifts toward the NEUTRAL position. The amount of oil flow from the main pumps to the stick hydraulic circuit decreases. This causes a greater portion of the oil flow from the main pumps to flow to the head end of the boom cylinders (25) .Since the pilot oil pressure from the pilot control valve for the boom (30) directly corresponds to the amount of movement or position of the joystick a gradual change to boom priority occurs. Thus, boom priority is controlled by the position of the joystick for the boom and boom priority automatically activates when the joystick reaches a certain position during a BOOM RAISE operation.The above information describes the condition of BOOM RAISE and STICK IN. During the combined function of BOOM RAISE and STICK IN, the pressure reducing valve for boom priority allows priority flow to the head end of the boom cylinders by reducing pilot pressure to the stick I and stick II control valves.ReferenceFor more information concerning boom priority, refer to Systems Operation, "Pilot Hydraulic System".Boom Lower
Illustration 6 g01262850
Hydraulic schematic for BOOM LOWER (5) Valve (6) Boom drift reduction valve (11) Boom I control valve (12) Spring (13) Passage (14) Load check valve (15) Boom II control valve (17) Parallel feeder passage (18) Return passage (24) Boom cylinders (25) Line (boom cylinder rod end) (26) Line (boom cylinder head end) (27) Drive pump (28) Idler pump (29) Pilot pump (30) Pilot control valve (boom and heel) (40) Orifice (41) Boom regeneration valve (42) Port (43) Orifice (44) Negative flow control line (45) Center bypass passage (46) Port (47) Passage (48) Valve (50) Drain line (51) Passage (52) Pilot line (53) Pilot lineDuring a BOOM LOWER operation, the oil delivery from only drive pump (27) is supplied to boom cylinders

Parts alternator Caterpillar catalog: