4947173 BALL JOINT Caterpillar parts
Rating:
Alternative (cross code) number:
CA4947173
494-7173
4947173
CA4947173
494-7173
4947173
Weight: 0.11 pounds 0 kg.
Information:
Pump Compartment (Typical 320B and 322B)
(H) Tap (upper pump delivery pressure). (J) Tap (power shift pressure).
Pump Compartment (Typical 325B)
(H) Tap (upper pump delivery pressure). (J) Tap (power shift pressure).
Pump Compartment (Typical 330B)
(H) Tap (upper pump delivery pressure). (J) Tap (power shift pressure).3. Connect a 60 000 kPa (8600 psi) pressure gauge to the main pump tap (H).4. Connect a 4000 kPa (580 psi) pressure gauge to tap (J).5. Start the engine and move the stick IN and OUT to its full travel position. Do this operation several times until the hydraulic oil temperature reaches 55 5°C (131 9°F).6. Place the power mode selector switch (E) in Power Mode position (Indicator ON).7. Place the engine speed dial (F) at position "10" on display (G). Check that engine speed under no load is at 2050 50 rpm with AEC switch (1a) in the OFF position. (Read rpm 3 seconds after the speed dial switch has been placed in position "10".) See the section, "Operational Test Preparations" in the "Testing and Adjusting Manual" for the specified engine rpm for dial position "10". Normal operations (see characteristic curve) of the engine and pumps are necessary for the pressure adjustment. If the results of the pressure adjustment are not correct, then the engine and pump characteristic curve needs to be checked. If the pump flow is lower than the specification make sure there is no air in the hydraulic system. Refer to the section in this module "Removal Of Air From The Hydraulic System".Temporary Setting Of The Main Relief Valve Pressure
The purpose for "Temporary Setting Of The Main Relief Pressure" is done so implement line relief valves and travel relief valves can be adjusted while adequate pressure is supplied.
Top Of Main Control Valves (typical)
(22) Main relief valve. (23) Adjuster. (24) Locknut.1. Slowly move the attachment control lever to fully retract the tool (bucket) cylinder rod.2. Check to be sure the main relief valve pressure setting is 34 350 500 kPa (4975 72 psi). Always make final pressure adjustments on pressure rise.3. Loosen locknut (24) and turn adjuster (23) clockwise one half turn. Tighten locknut (24).Adjustment Of Two Way Circuit Line Relief Valve Pressure
Preparation
1. Start the service program "Service Mode" and keep the power shift pressure constant at 2350 kPa (340 psi). Read the pressure gauge attached at tap (H) to monitor the power shift pressure.2. Select high mode two way operation. Place combined circuit ball valve lever (6) in CLOSED position and hydraulic attachment control switch (5) in the "rabbit" position. For further information of "Service Mode", reference "Engine And Pump Electronic Control System Service Manual" SENR9291.Adjustment
Main Control Valve Compartment (Typical)
(13) Line relief valves (attachment circuit). (14) Flow check Valve assembly.
Line Relief Valve (If equipped)
(23) Locknut. (24) Adjuster (Screw).
Line Relief Valve (If Equipped)
(26) Locknut. (27) Adjuster (Cap). During line relief adjustment, do not turn the engine OFF. This helps to prevent a change in power shift pressure. Always make final pressure adjustment when gauge indicates a pressure rise.
To
Caterpillar parts catalog:
Parts ball Caterpillar catalog:
4894847
BALL JOINT GP-TIE ROD
Caterpillar
Caterpillar
3994222
BALL JOINT
Caterpillar
Caterpillar
3796556
BALL BEARING
Caterpillar
Caterpillar
3228098
BALL BEARING
Caterpillar
Caterpillar
2994986
BALL BEARING
Caterpillar
Caterpillar
4846589
BALL BEARING
Caterpillar
Caterpillar
4419588
BALL BEARING
Caterpillar
Caterpillar
4419586
BALL BEARING
Caterpillar
Caterpillar
3956764
BALL BEARING
Caterpillar
Caterpillar
3888544
BALL
Caterpillar
Caterpillar
3888543
BALL
Caterpillar
Caterpillar