9B5009 BODY A. Caterpillar parts
Rating:
Alternative (cross code) number:
CA9B5009
9B-5009
9B5009
CA9B5009
9B-5009
9B5009
Weight: 4 pounds 1 kg.
Information:
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A - Loctite 5900 -
B - Loctite 243 -
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Do not turn the crankshaft or the camshaft while the camshaft gear is removed. If the front gear group is not correctly timed during installation, interference can occur between the pistons and the valves, resulting in damage to the engine.
Illustration 1 g01047263
Apply Tooling (B) to the serrations of studs (18). Install the studs in plate (16).
Install the integral seal on the dowel pins on the cylinder block. Note: Apply Tooling (A) to the bottom of the integral seal in order to fill the space at the cylinder block, the front housing, and the engine oil pan.
Install plate (16) on the dowel pins on the cylinder block. Install new locking bolts (17) (Marked "X") in order to fasten the front plate to the cylinder block. Tighten the locking bolts to a torque of 55 N m (41 lb ft). Note: Apply Tooling (B) to the bolts.
Illustration 2 g01056102
Install stub shaft (15). Apply Tooling (B) to the studs and the bolt for stub shaft (15). Tighten nuts (14) and the bolt to a torque of 55 10 N m (41 7 lb ft).
Install shaft assembly (13). Do not tighten nuts (12) and the bolt for the shaft assembly at this time. The nuts and the bolt for shaft assembly (13) will need to be tightened when the backlash is adjusted.
Adjust the backlash between the camshaft gear and the adjustable idler gear assembly. The backlash should be 0.356 0.254 mm (0.014 0.010 inch). Refer to Testing and Adjusting, "Gear Group (Front) - Time" for the backlash adjustment procedure. Tighten nuts (12) and the bolt to a torque of 55 10 N m (41 7 lb ft).
Install stub shaft (10). Apply Tooling (B) to bolts (11). Install bolts (11) and tighten to a torque of 55 10 N m (41 7 lb ft) in sequence. (1, 3, 4, 5, 2, 1, 2, 3, 4, 5, 1). Note: Mark bolts (11) in clockwise order from one to five. These will be the numbers for the torque sequence in step 6.
Illustration 3 g01047231
Position cluster gear assembly (1) on the stub shaft. Ensure that the timing marks are aligned on the cluster gear assembly and the crankshaft gear.
Apply Tooling (B) to bolts (3). Position plate (2) with the
Table 1
Required Tools
Tool Part Number Part Description Qty
A - Loctite 5900 -
B - Loctite 243 -
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Do not turn the crankshaft or the camshaft while the camshaft gear is removed. If the front gear group is not correctly timed during installation, interference can occur between the pistons and the valves, resulting in damage to the engine.
Illustration 1 g01047263
Apply Tooling (B) to the serrations of studs (18). Install the studs in plate (16).
Install the integral seal on the dowel pins on the cylinder block. Note: Apply Tooling (A) to the bottom of the integral seal in order to fill the space at the cylinder block, the front housing, and the engine oil pan.
Install plate (16) on the dowel pins on the cylinder block. Install new locking bolts (17) (Marked "X") in order to fasten the front plate to the cylinder block. Tighten the locking bolts to a torque of 55 N m (41 lb ft). Note: Apply Tooling (B) to the bolts.
Illustration 2 g01056102
Install stub shaft (15). Apply Tooling (B) to the studs and the bolt for stub shaft (15). Tighten nuts (14) and the bolt to a torque of 55 10 N m (41 7 lb ft).
Install shaft assembly (13). Do not tighten nuts (12) and the bolt for the shaft assembly at this time. The nuts and the bolt for shaft assembly (13) will need to be tightened when the backlash is adjusted.
Adjust the backlash between the camshaft gear and the adjustable idler gear assembly. The backlash should be 0.356 0.254 mm (0.014 0.010 inch). Refer to Testing and Adjusting, "Gear Group (Front) - Time" for the backlash adjustment procedure. Tighten nuts (12) and the bolt to a torque of 55 10 N m (41 7 lb ft).
Install stub shaft (10). Apply Tooling (B) to bolts (11). Install bolts (11) and tighten to a torque of 55 10 N m (41 7 lb ft) in sequence. (1, 3, 4, 5, 2, 1, 2, 3, 4, 5, 1). Note: Mark bolts (11) in clockwise order from one to five. These will be the numbers for the torque sequence in step 6.
Illustration 3 g01047231
Position cluster gear assembly (1) on the stub shaft. Ensure that the timing marks are aligned on the cluster gear assembly and the crankshaft gear.
Apply Tooling (B) to bolts (3). Position plate (2) with the
Parts body Caterpillar catalog:
9B5004
BODY A.
Caterpillar
Caterpillar
9B4831
BODY
Caterpillar
Caterpillar
9B4830
BODY
Caterpillar
Caterpillar
9B4828
BODY
Caterpillar
Caterpillar
9B4827
BODY
Caterpillar
Caterpillar
9B4801
BODY
Caterpillar
Caterpillar
9B5027
BODY A.
Caterpillar
Caterpillar
9B5017
BODY A.
Caterpillar
Caterpillar
9B5014
BODY A.
Caterpillar
Caterpillar
9B5013
BODY A.
Caterpillar
Caterpillar
9B5012
BODY A.
Caterpillar
Caterpillar
9B5010
BODY A.
Caterpillar
Caterpillar