1C4233 BOLT Caterpillar parts
PR-1000, PR-450, PR-450C, PR-750B
Rating:
Alternative (cross code) number:
CA1C4233
1C-4233
1C4233
CA1C4233
1C-4233
1C4233
Weight: 0.01 pounds 0 kg.
COLD PLANER,
Information:
Editing Events
The following steps are applicable to all events:
In the "Control Center", click "Manage Events". The " Manage Events" dialog displays.
In the "Scheduled Items" list, select the event to edit. If the event will be run, click the "Run Now" button at the bottom of the list.If the details of this event will be changed, change the run time of the event to either "Manual" or "Scheduled" and make the necessary changes in the "When to Run" panel.Note: The user can change the type of event for an already scheduled event. All other settings can remain the same without having to delete the original event or add another event with similar settings.
Click either "Run Now", or "Apply", depending on the changes made, at the bottom of the screen. Export Terrain to .csv
A typical Export Terrain to .csv file name is: Terrain/[year]/[group]_[datetime].dat. The [datetime] is in the format YYYYMMDDHHMM, and HH is in 24-hour format.Note: The office software automatically appends the relevant site model name to the end of the filename. For example: SavedSiteModels/[year]/[group]_[datetime]_CurrentElevationTime.cat.Site models must be present in the appropriate group folder for this event to be run successfully. For example, if exporting current elevation as a column, a current elevation time file must be present. If exporting material status as a column, an ore status time file must be present in that group.Note: Exporting terrain data utilizes many system resources, which may result in the degradation of the performance of the server. Caterpillar recommends scheduling this event to run overnight. Output Format
In the "Output Format" fields, perform the following procedure:
Select the "Group" from which the exports are to be scheduled.
Select the "Bounding Region" if a region is required for the export data.
Select the type of "Column Separator" to use.
Select the type of "Line Separator" to use.
Enter the "Grid Size" for the site. The recommended size to use for the grid is 1 m (3 ft). Large sites will need a larger sized grid. The grid is based on easting and northing position. When the sites are updated by machines, the terrain data grid is updated.
In the "Header Text" field enter any text that will appear in the header of the file. Column Positions
From the drop-down lists, select the information to display in each of the columns in the .csv file. Choose from "Blank", "Northing", "Easting", "Current Elevation", and "Material Status". Click "Apply" to save the data and click "OK" to exit.Export Progress Lines
A typical export Progress Lines file name is Progress/[year]/[group]_[datetime]_[type].dxf. The [datetime] is in the format YYYYMMDDHHMM, and HH is in 24-hour format.The file type is one of toe, crest, or toecrest.Note: The office software automatically appends the relevant site model name to the end of the filename. For example: SavedSiteModels/[year]/[group]_[datetime]_CurrentElevationTime.cat.Note: Exporting terrain data utilizes many system resources, which may result in the degradation of the performance of the client. Caterpillar recommends that scheduling this event to run overnight.Progress lines are the boundaries between mined areas, areas where mining is in progress and areas not yet
The following steps are applicable to all events:
In the "Control Center", click "Manage Events". The " Manage Events" dialog displays.
In the "Scheduled Items" list, select the event to edit. If the event will be run, click the "Run Now" button at the bottom of the list.If the details of this event will be changed, change the run time of the event to either "Manual" or "Scheduled" and make the necessary changes in the "When to Run" panel.Note: The user can change the type of event for an already scheduled event. All other settings can remain the same without having to delete the original event or add another event with similar settings.
Click either "Run Now", or "Apply", depending on the changes made, at the bottom of the screen. Export Terrain to .csv
A typical Export Terrain to .csv file name is: Terrain/[year]/[group]_[datetime].dat. The [datetime] is in the format YYYYMMDDHHMM, and HH is in 24-hour format.Note: The office software automatically appends the relevant site model name to the end of the filename. For example: SavedSiteModels/[year]/[group]_[datetime]_CurrentElevationTime.cat.Site models must be present in the appropriate group folder for this event to be run successfully. For example, if exporting current elevation as a column, a current elevation time file must be present. If exporting material status as a column, an ore status time file must be present in that group.Note: Exporting terrain data utilizes many system resources, which may result in the degradation of the performance of the server. Caterpillar recommends scheduling this event to run overnight. Output Format
In the "Output Format" fields, perform the following procedure:
Select the "Group" from which the exports are to be scheduled.
Select the "Bounding Region" if a region is required for the export data.
Select the type of "Column Separator" to use.
Select the type of "Line Separator" to use.
Enter the "Grid Size" for the site. The recommended size to use for the grid is 1 m (3 ft). Large sites will need a larger sized grid. The grid is based on easting and northing position. When the sites are updated by machines, the terrain data grid is updated.
In the "Header Text" field enter any text that will appear in the header of the file. Column Positions
From the drop-down lists, select the information to display in each of the columns in the .csv file. Choose from "Blank", "Northing", "Easting", "Current Elevation", and "Material Status". Click "Apply" to save the data and click "OK" to exit.Export Progress Lines
A typical export Progress Lines file name is Progress/[year]/[group]_[datetime]_[type].dxf. The [datetime] is in the format YYYYMMDDHHMM, and HH is in 24-hour format.The file type is one of toe, crest, or toecrest.Note: The office software automatically appends the relevant site model name to the end of the filename. For example: SavedSiteModels/[year]/[group]_[datetime]_CurrentElevationTime.cat.Note: Exporting terrain data utilizes many system resources, which may result in the degradation of the performance of the client. Caterpillar recommends that scheduling this event to run overnight.Progress lines are the boundaries between mined areas, areas where mining is in progress and areas not yet
Caterpillar parts catalog:
Parts bolt Caterpillar catalog:
1146446
BOLT-TORX
PM-201, PM-565, PM-565B, PR-1000
PM-201, PM-565, PM-565B, PR-1000
7R9693
BOLT
PR-1000, PR-450, PR-750B
PR-1000, PR-450, PR-750B
8T4398
BOLT
AP-1200, PM-201, PM-565, PM-565B, PR-1000, PR-450C, PR-750B
AP-1200, PM-201, PM-565, PM-565B, PR-1000, PR-450C, PR-750B
0819270
BOLT
PM-565, PR-1000, PR-450, PR-450C, PR-750B
PM-565, PR-1000, PR-450, PR-450C, PR-750B
7X7168
BOLT
PR-1000, PR-750B
PR-1000, PR-750B
7R7959
BOLT-SPECIAL
330D L, 824G, 825G, 826G, AP-1000, AP-800, AP-800C, AP-800D, BG-225B, CB-334D, CB-334E, CB-335D, CB-534B, CB-534C, CB-535B, CP-433C, CP-573E, CP-663E, CS-323C, CS-531C, CS-531D, CS-533D, CS-563C, CS-5...
330D L, 824G, 825G, 826G, AP-1000, AP-800, AP-800C, AP-800D, BG-225B, CB-334D, CB-334E, CB-335D, CB-534B, CB-534C, CB-535B, CP-433C, CP-573E, CP-663E, CS-323C, CS-531C, CS-531D, CS-533D, CS-563C, CS-5...
0817484
BOLT-ADJUSTMENT
PM-201, PM-565B, PR-1000, PR-750B
PM-201, PM-565B, PR-1000, PR-750B
0817949
BOLT
PR-1000, PR-450C
PR-1000, PR-450C
1G7426
BOLT
PR-1000
PR-1000
1414897
BOLT-SOCKET HEAD
CS-573C, CS-583C, PR-1000
CS-573C, CS-583C, PR-1000
1414898
BOLT-SOCKET HEAD
PR-1000
PR-1000
8C1778
BOLT
PR-1000, PR-450, PR-450C, PR-750B
PR-1000, PR-450, PR-450C, PR-750B