9C8285 BRACKET Caterpillar parts
814F, 815F, 816F, 966D, 966F, 966F II, 970F
Rating:
Alternative (cross code) number:
CA9C8285
9C-8285
9C8285
CA9C8285
9C-8285
9C8285
Weight: 2 pounds 1 kg.
LANDFILL COMPACTOR, WHEEL LOADER,
Compatible equipment models: 9C8285:
Information:
Approximate fuel consumption: Softwood 1 gal. per 1000 board feetHardwood 1 gal. per 750 board feetPropellor Shaft Size Selection:
For intermediate shaft and tailshaft in marine installationsWhere: D = Diameter in inchesHP = HorsepowerS = Torsional stress in PSI (usually 5000)Shovels and Draglines:
Use manufacturer's recommendations. Torque: (4 cycle only)Torque Converters:
Peak output shaft horsepower: Normally 80% of input horsepower for either single or three-stage converterOutput shaft speed at peak output horsepower: Single-stage - 0.7 to 0.85 engine full load speedThree-stage - 0.5 to 0.6 engine full load speedTorque multiplication at or near stall: Single-stage - 2.2 to 3.4 times engine torqueThree-stage - 3.6 to 5.4 times engine torqueVentilation:
Natural 1/2 net square inch for each BHPBlown 1/3 net square inch for each BHPMetric Units
Air Compressors:
110 kW = 1 m3/min @ 850 kPa100 kW = 1 m3/min @ 675 kPa90 kW = 1 m3/min @ 550 kPaAMA Power for U.S.A. Tax Purposes:
Where: N = No. of CylindersD = Piston Diameter in millimetersBrake Mean Effective Pressure:
Conveyors: 15 to 20° incline.Cooling:
Heat Exchanger Flow Rate Raw water to jacket water 1:1 to 2:1Submerged Pipe Cooling 1 m2 surface area per 16 kW with 30°C flowing raw waterElectricity:
Generator Capacity Required: Motors:11/3 kW per nameplate kW (motor running cool or warm to touch)12/3 kW per nameplate kW (motor running hot to touch)Engine Power Requirements:Electric Sets:
Motor Starting Requirements: Inrush kVa (Code F motor) = 41/8 × nameplate kWInrush Current (Code F motor) = 6.2 × full load rated current11/3 kVa per kW at full loadGenerator full load rated current capacity:Generator Cooling Requirements: Air Flow = 41/4 m3 per kW loss × efficiencyCircuit Breaker Trip Selection: 1.15 to 1.25 × full load generator amp ratingSingle Phase Rating of 3-Phase Generator: 60% of 3-Phase ratingGenerator Temperature Rise: Increase 1°C for each 100 meters above 1000 metersFuel Consumption
3*33 720 kJ/mGas Compressor:
kW = 777 Rc VSWhere : Rc = Stage Compression RatioV = Millions cubic meters per dayS = Number of StagesHeat Rejection:
Hours Per:
Year = 8760 (365 Days)Week = 168 (7 Days)Month = 720 (30 Days)Oilfield Drilling:
Mud PumpsRotary TableOn Site Power Requirements:
Based on 10 000 m2 of office bldg., etc. and 40°N latitude. Electric Requirements: 650 kW continuous load (air conditioning is absorption)Use three units approximately 325 kW each (2 prime and 1 standby)Air Conditioning Compressor: 325 kW prime loadUse two engines approximately 170 kW each (No standby)Pumps:
Deep Well kW = (meters of lift × L/min × 4640)Pipe Line kW = L/H × kPa × 2 775 000*EfficiencyRefrigeration:
One ton refrigeration = 3.5 kWOne boiler hp = 9.8 kWOne ton compressor rating = 0.75 kWAuxiliary air conditioning equipment requires 1/5 kW per ton of compressor ratingIce Plant: Complete power requires 3.25-4.25 kW per daily ton capacitySawmill:
1 kW per 20 to 25 mm saw diameter at 500 RPM Increase or decrease in proportion to RPMSwing Cut-Off SawTable Trimmer 51/2 to 71/2 kWBlower Fan 4 meter sawdust 21/4 to 33/4 kWPlaner Mill 5-10 kW m3 per hour 600-750 mm planers 11 to 19 kWEdgers 2 saws 9 to 11 kW3 saws 11 to 19 kWSlab
For intermediate shaft and tailshaft in marine installationsWhere: D = Diameter in inchesHP = HorsepowerS = Torsional stress in PSI (usually 5000)Shovels and Draglines:
Use manufacturer's recommendations. Torque: (4 cycle only)Torque Converters:
Peak output shaft horsepower: Normally 80% of input horsepower for either single or three-stage converterOutput shaft speed at peak output horsepower: Single-stage - 0.7 to 0.85 engine full load speedThree-stage - 0.5 to 0.6 engine full load speedTorque multiplication at or near stall: Single-stage - 2.2 to 3.4 times engine torqueThree-stage - 3.6 to 5.4 times engine torqueVentilation:
Natural 1/2 net square inch for each BHPBlown 1/3 net square inch for each BHPMetric Units
Air Compressors:
110 kW = 1 m3/min @ 850 kPa100 kW = 1 m3/min @ 675 kPa90 kW = 1 m3/min @ 550 kPaAMA Power for U.S.A. Tax Purposes:
Where: N = No. of CylindersD = Piston Diameter in millimetersBrake Mean Effective Pressure:
Conveyors: 15 to 20° incline.Cooling:
Heat Exchanger Flow Rate Raw water to jacket water 1:1 to 2:1Submerged Pipe Cooling 1 m2 surface area per 16 kW with 30°C flowing raw waterElectricity:
Generator Capacity Required: Motors:11/3 kW per nameplate kW (motor running cool or warm to touch)12/3 kW per nameplate kW (motor running hot to touch)Engine Power Requirements:Electric Sets:
Motor Starting Requirements: Inrush kVa (Code F motor) = 41/8 × nameplate kWInrush Current (Code F motor) = 6.2 × full load rated current11/3 kVa per kW at full loadGenerator full load rated current capacity:Generator Cooling Requirements: Air Flow = 41/4 m3 per kW loss × efficiencyCircuit Breaker Trip Selection: 1.15 to 1.25 × full load generator amp ratingSingle Phase Rating of 3-Phase Generator: 60% of 3-Phase ratingGenerator Temperature Rise: Increase 1°C for each 100 meters above 1000 metersFuel Consumption
3*33 720 kJ/mGas Compressor:
kW = 777 Rc VSWhere : Rc = Stage Compression RatioV = Millions cubic meters per dayS = Number of StagesHeat Rejection:
Hours Per:
Year = 8760 (365 Days)Week = 168 (7 Days)Month = 720 (30 Days)Oilfield Drilling:
Mud PumpsRotary TableOn Site Power Requirements:
Based on 10 000 m2 of office bldg., etc. and 40°N latitude. Electric Requirements: 650 kW continuous load (air conditioning is absorption)Use three units approximately 325 kW each (2 prime and 1 standby)Air Conditioning Compressor: 325 kW prime loadUse two engines approximately 170 kW each (No standby)Pumps:
Deep Well kW = (meters of lift × L/min × 4640)Pipe Line kW = L/H × kPa × 2 775 000*EfficiencyRefrigeration:
One ton refrigeration = 3.5 kWOne boiler hp = 9.8 kWOne ton compressor rating = 0.75 kWAuxiliary air conditioning equipment requires 1/5 kW per ton of compressor ratingIce Plant: Complete power requires 3.25-4.25 kW per daily ton capacitySawmill:
1 kW per 20 to 25 mm saw diameter at 500 RPM Increase or decrease in proportion to RPMSwing Cut-Off SawTable Trimmer 51/2 to 71/2 kWBlower Fan 4 meter sawdust 21/4 to 33/4 kWPlaner Mill 5-10 kW m3 per hour 600-750 mm planers 11 to 19 kWEdgers 2 saws 9 to 11 kW3 saws 11 to 19 kWSlab
Caterpillar parts catalog:
Parts bracket Caterpillar catalog:
6C4461
BRACKET AS
950F, 966F, 966F II
950F, 966F, 966F II
6C4463
BRACKET AS
950F, 966F, 966F II
950F, 966F, 966F II
4E1459
BRACKET AS
966F
966F
8R7913
BRACKET
950F, 966F, 980F
950F, 966F, 980F
7E0802
BRACKET
814F, 815F, 816F, 966F, 966F II, 970F
814F, 815F, 816F, 966F, 966F II, 970F
6C8421
BRACKET AS
966F
966F
8V1254
BRACKET AS
966D, 966F
966D, 966F
8V1256
BRACKET AS
966D, 966F
966D, 966F
8V1259
BRACKET AS
966D, 966F
966D, 966F
6C7232
BRACKET
950F, 950F II, 960F, 966F
950F, 950F II, 960F, 966F
7N2790
BRACKET
814B, 815B, 966D, 966F, 966F II, 972G
814B, 815B, 966D, 966F, 966F II, 972G
8R7194
BRACKET
950F, 966F, 980F
950F, 966F, 980F