5284681 BUCKET AS-HEAVY DUTY Caterpillar parts
Rating:
Alternative (cross code) number:
CA5284681
528-4681
5284681
CA5284681
528-4681
5284681
Information:
1. Remove bolts (1) and lift shaft (2) and the rocker arms off the valve cover base and the push rods. 2. Remove push rods (3) from the valve lifters and valve covers base.3. Remove bridge assemblies (4) from the dowels.Install Rocker Shafts And Push Rods
1. Loosen the adjustment nuts and screws (1) on valve bridges (2).2. Put clean engine oil on the bridge dowels, the inside diameter of valve bridges (2) and on the top pad of the valve bridge. Install valve bridges (2) on the bridge dowels as shown. 3. While bridges (2) are pushed straight down with a force of 25 20 N (5.6 4.5 lb.) on the top contact surface, turn adjustment screw (1) until it makes contact with the valve stem. Turn screw (1) another 20° to 30°. This will straighten the dowel in the guide and make compensation for clearance (slack) in the threads.4. Hold adjustment screw (1) in position and tighten the nut around screw (1) to a torque of 30 4 N m (22 3 lb.ft.). 5. Put push rods (3) in position in the valve lifters and valve cover base.
Make sure the crankshaft and camshafts are in time with each other and that adjustment screws (5) are turned all the way out before the rocker shaft bolts are tightened or damaged to the valves or pistons can be the result. See INSTALL CAMSHAFTS for the procedure to time the engine.
6. Put the rocker arms and shaft (4) in position on the valve cover. Make sure the rocker shafts and push rods are in alignment and install the bolts to hold shaft (4).7. Make an adjustment of the valves to have a clearance of 0.40 mm (.016 in.) for intake and 0.76 mm (.030 in.) for exhaust. See VALVE CLEARANCE SETTING in TESTING AND ADJUSTING section for the complete procedure.end by:a) install valve covers
1. Loosen the adjustment nuts and screws (1) on valve bridges (2).2. Put clean engine oil on the bridge dowels, the inside diameter of valve bridges (2) and on the top pad of the valve bridge. Install valve bridges (2) on the bridge dowels as shown. 3. While bridges (2) are pushed straight down with a force of 25 20 N (5.6 4.5 lb.) on the top contact surface, turn adjustment screw (1) until it makes contact with the valve stem. Turn screw (1) another 20° to 30°. This will straighten the dowel in the guide and make compensation for clearance (slack) in the threads.4. Hold adjustment screw (1) in position and tighten the nut around screw (1) to a torque of 30 4 N m (22 3 lb.ft.). 5. Put push rods (3) in position in the valve lifters and valve cover base.
Make sure the crankshaft and camshafts are in time with each other and that adjustment screws (5) are turned all the way out before the rocker shaft bolts are tightened or damaged to the valves or pistons can be the result. See INSTALL CAMSHAFTS for the procedure to time the engine.
6. Put the rocker arms and shaft (4) in position on the valve cover. Make sure the rocker shafts and push rods are in alignment and install the bolts to hold shaft (4).7. Make an adjustment of the valves to have a clearance of 0.40 mm (.016 in.) for intake and 0.76 mm (.030 in.) for exhaust. See VALVE CLEARANCE SETTING in TESTING AND ADJUSTING section for the complete procedure.end by:a) install valve covers
Caterpillar SIS machinery equipment:
Caterpillar parts catalog:
Parts bucket Caterpillar catalog:
5284679
BUCKET AS-HEAVY DUTY
Caterpillar
Caterpillar
5284675
BUCKET & ADJUSTER GP
Caterpillar
Caterpillar
5284672
BUCKET & ADJUSTER GP
Caterpillar
Caterpillar
5284663
BUCKET GP-SEVERE SERVICE SPADE
Caterpillar
Caterpillar
5284661
BUCKET & ADJUSTER GP
Caterpillar
Caterpillar
5284646
BUCKET & ADJUSTER GP
Caterpillar
Caterpillar
5284690
BUCKET AS-HEAVY DUTY
Caterpillar
Caterpillar
5284689
BUCKET AS-HEAVY DUTY
Caterpillar
Caterpillar
5284688
BUCKET AS-HEAVY DUTY
Caterpillar
Caterpillar
5284684
BUCKET AS-HEAVY DUTY
Caterpillar
Caterpillar
5284683
BUCKET AS-HEAVY DUTY
Caterpillar
Caterpillar
5284682
BUCKET AS-HEAVY DUTY
Caterpillar
Caterpillar