1659297 CAP AS Caterpillar parts
Rating:
Alternative (cross code) number:
CA1659297
165-9297
1659297
CA1659297
165-9297
1659297
Information:
Specification
Table 1
Overswing    
Item     308E    
Right Swing     600 mm (23.6 inch) or less    
Left Swing    
Table 2
Swing Time (1)    
Item     308E    
Right Swing (90°)     3.0 sec or less    
Left Swing (90°)    
Continuous swing right (three revolutions) (2)     17.3 - 20.3 sec or less    
Continuous swing left (three revolutions) (2)    
( 1 ) Empty bucket
( 2 ) Start the measurement after the machine has rotated one full revolution.Introduction
Measuring the swing speed and the overswing of the machine will determine if there is a need to check the swing motor.Note: The engine speed and/or the machine configuration that is used during this test can affect the results of this test. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for the engine speed that was used for this test. Refer to Testing and Adjusting, "Operational Checks" for the machine configurations that were used for this test.Note: The relief valve pressure settings must be set to the relief valve pressure specification before performing this operational check. Refer to Testing and Adjusting, "Specifications".Required Tools
Table 3
Required Tools    
Description    Qty    
Tape Measure     1    
Stopwatch     1    Test Procedure
Illustration 1 g03554208
Position the machine on level ground. Refer to Illustration 1.
Fully retract the stick cylinder and fully extend the bucket cylinder.
Stop the engine.
Illustration 2 g00293972
(A) Upper frame (B) Undercarriage frame (C) Marking
To indicate the relationship of the two positions, put a mark (C) on the inner race and the outer race of the swing bearing. The mark will be used as a target to stop the swing operation. Refer to Illustration 2.
Start the engine.
Place the engine speed dial in the HIGH IDLE position.
Increase the hydraulic oil temperature to 55° 5°C (131° 9°F).
Load the bucket.Weight of bucket load 308E ... 520 kg (1146 lb)
Move the swing joystick in either direction until the machine completes a 90 degree swing operation away from the target.
Move the swing joystick in the opposite direction until the machine completes a 90 degree swing operation toward the target. Return the swing joystick to the NEUTRAL position at the target.
Measure the amount of overswing by measuring the distance between the marks on the swing bearing. Refer to Illustration 2.Note: Use a point that is visible from the operator seat as a reference point for the target.
Empty the bucket and reposition the machine according to Illustration 1.
Move the swing joystick in each direction and measure the time that is required to complete a 90 degree swing operation.Move the swing joystick in each direction and measure the time that is required to complete three revolutions.
Table 1
Overswing    
Item     308E    
Right Swing     600 mm (23.6 inch) or less    
Left Swing    
Table 2
Swing Time (1)    
Item     308E    
Right Swing (90°)     3.0 sec or less    
Left Swing (90°)    
Continuous swing right (three revolutions) (2)     17.3 - 20.3 sec or less    
Continuous swing left (three revolutions) (2)    
( 1 ) Empty bucket
( 2 ) Start the measurement after the machine has rotated one full revolution.Introduction
Measuring the swing speed and the overswing of the machine will determine if there is a need to check the swing motor.Note: The engine speed and/or the machine configuration that is used during this test can affect the results of this test. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for the engine speed that was used for this test. Refer to Testing and Adjusting, "Operational Checks" for the machine configurations that were used for this test.Note: The relief valve pressure settings must be set to the relief valve pressure specification before performing this operational check. Refer to Testing and Adjusting, "Specifications".Required Tools
Table 3
Required Tools    
Description    Qty    
Tape Measure     1    
Stopwatch     1    Test Procedure
Illustration 1 g03554208
Position the machine on level ground. Refer to Illustration 1.
Fully retract the stick cylinder and fully extend the bucket cylinder.
Stop the engine.
Illustration 2 g00293972
(A) Upper frame (B) Undercarriage frame (C) Marking
To indicate the relationship of the two positions, put a mark (C) on the inner race and the outer race of the swing bearing. The mark will be used as a target to stop the swing operation. Refer to Illustration 2.
Start the engine.
Place the engine speed dial in the HIGH IDLE position.
Increase the hydraulic oil temperature to 55° 5°C (131° 9°F).
Load the bucket.Weight of bucket load 308E ... 520 kg (1146 lb)
Move the swing joystick in either direction until the machine completes a 90 degree swing operation away from the target.
Move the swing joystick in the opposite direction until the machine completes a 90 degree swing operation toward the target. Return the swing joystick to the NEUTRAL position at the target.
Measure the amount of overswing by measuring the distance between the marks on the swing bearing. Refer to Illustration 2.Note: Use a point that is visible from the operator seat as a reference point for the target.
Empty the bucket and reposition the machine according to Illustration 1.
Move the swing joystick in each direction and measure the time that is required to complete a 90 degree swing operation.Move the swing joystick in each direction and measure the time that is required to complete three revolutions.
Parts cap Caterpillar catalog:
1659232
CAP AS
Caterpillar
Caterpillar
1659227
CAP AS
Caterpillar
Caterpillar
1651574
CAP
Caterpillar
Caterpillar
1651076
CAP
Caterpillar
Caterpillar
1650100
CAP AS (RH)
Caterpillar
Caterpillar
1646852
CAP-PROTECTIVE
Caterpillar
Caterpillar
1694819
CAP-PROTECTIVE
Caterpillar
Caterpillar
1692970
CAP AS
Caterpillar
Caterpillar
1669380
CAP
Caterpillar
Caterpillar
1667214
CAP AS
Caterpillar
Caterpillar
1659315
CAP AS
Caterpillar
Caterpillar
1659303
CAP AS
Caterpillar
Caterpillar