1T1508 CARRIER-STATOR Caterpillar parts
936, 936F, 966C, G936
Rating:
Alternative (cross code) number:
CA1T1508
1T-1508
1T1508
CA1T1508
1T-1508
1T1508
Weight: 23 pounds 10 kg.
WHEEL LOADER,
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
$179.73
07 May 2022
US: Florida-Parts-Z
1T1508 - Carrier-STATOR fit Caterpillar (CAT)
FIRST PRICE PARTS
FIRST PRICE PARTS
$203.51
24 Dec 2021
US: Florida-Parts-Z
1T1508 - Carrier-STATOR fit Caterpillar (CAT)
FIRST PRICE PARTS
FIRST PRICE PARTS
Information:
Installation Of The Generator
For information or alignment of two bearing generators make reference to Form No. SEHS7073.Typical installation and alignment procedure for electric sets with single-bearing generators. Do not start the alignment procedure until the electric set is permanently installed. If the electric set is moved to a different location, check the alignment and make any corrections necessary. The alignment between the generator and the engine must be correct to get maximum performance and long life from the electric set.
REAR OF ENGINE
A. Pilot bore. B. Surface.1. Remove all dirt, burrs and paint from the contact surfaces of the generator supports and the base. Remove the protection material (compound) from the flywheel pilot bore (A) and from the surface (B) that makes contact with the coupling. All contact surfaces of the engine, coupling and generator must be completely clean.
FRONT OF ENGINE
1. Indicator group. 2. Crankshaft pulley.2. Remove the timing pointer cover from the flywheel housing. Install indicator group (1) as shown on the front of the engine with the tip of the indicator on the face of crankshaft pulley (2). Use a bar between the flywheel and flywheel housing to push the crankshaft toward the flywheel to remove all end play. Put the dial indicator in the "zero" position. Move the crankshaft to its most forward position, and make a record of the Total Indicator Reading (TIR). The TIR is the end play of the crankshaft.
FRONT OF GENERATOR
3. Plate assembly. 4. Shim pack.3. Put plate assembly (3) in position in the bore of the flywheel to check for clearance. There must be clearance between the outside diameter of the plate assembly (3) and the inside diameter of the bore in the flywheel.
Damage to the engine and/or generator can be the result if the electric set is run with a plate assembly that does not have this clearance.
4. Install a full shim pack (4) and plate assembly (3) on the generator with bolts (5). On D379, G379, D398, G398, D399 and G399 engines, tighten bolts (5) to a torque of 370 35 lb. ft. (505 45 N m). On all other engines, tighten bolts (5) to the standard torque.
INSTALL PLATE ASSEMBLY
5. Bolt.
ENGINE FLYWHEEL
6. Guide bolt.
PUT GENERATOR IN POSITION
INSTALL BOLTS
7. Bolt. 8. Bolt.5. Install guide bolt (6) in the flywheel. Put the generator in position on the engine, and install bolts (7) and (8). Tighten bolts (7) and (8) but do not bend the locks under bolts (8) at this time.6. Use a dial indicator (1) to check crankshaft end play (do not use force to hold the crankshaft in position). Remove the generator. Remove only enough shims to get the original amount of end play as shown in Step 2.
PUT BOLTS IN POSITION
9. Bolt. 10. Generator support.7. Install the generator and again check the crankshaft end play. After the correct amount of shims has been installed, bend the locks under bolts (8).8. Install but do not tighten all bolts (9) that fasten generator supports (10) to the base.
For information or alignment of two bearing generators make reference to Form No. SEHS7073.Typical installation and alignment procedure for electric sets with single-bearing generators. Do not start the alignment procedure until the electric set is permanently installed. If the electric set is moved to a different location, check the alignment and make any corrections necessary. The alignment between the generator and the engine must be correct to get maximum performance and long life from the electric set.
REAR OF ENGINE
A. Pilot bore. B. Surface.1. Remove all dirt, burrs and paint from the contact surfaces of the generator supports and the base. Remove the protection material (compound) from the flywheel pilot bore (A) and from the surface (B) that makes contact with the coupling. All contact surfaces of the engine, coupling and generator must be completely clean.
FRONT OF ENGINE
1. Indicator group. 2. Crankshaft pulley.2. Remove the timing pointer cover from the flywheel housing. Install indicator group (1) as shown on the front of the engine with the tip of the indicator on the face of crankshaft pulley (2). Use a bar between the flywheel and flywheel housing to push the crankshaft toward the flywheel to remove all end play. Put the dial indicator in the "zero" position. Move the crankshaft to its most forward position, and make a record of the Total Indicator Reading (TIR). The TIR is the end play of the crankshaft.
FRONT OF GENERATOR
3. Plate assembly. 4. Shim pack.3. Put plate assembly (3) in position in the bore of the flywheel to check for clearance. There must be clearance between the outside diameter of the plate assembly (3) and the inside diameter of the bore in the flywheel.
Damage to the engine and/or generator can be the result if the electric set is run with a plate assembly that does not have this clearance.
4. Install a full shim pack (4) and plate assembly (3) on the generator with bolts (5). On D379, G379, D398, G398, D399 and G399 engines, tighten bolts (5) to a torque of 370 35 lb. ft. (505 45 N m). On all other engines, tighten bolts (5) to the standard torque.
INSTALL PLATE ASSEMBLY
5. Bolt.
ENGINE FLYWHEEL
6. Guide bolt.
PUT GENERATOR IN POSITION
INSTALL BOLTS
7. Bolt. 8. Bolt.5. Install guide bolt (6) in the flywheel. Put the generator in position on the engine, and install bolts (7) and (8). Tighten bolts (7) and (8) but do not bend the locks under bolts (8) at this time.6. Use a dial indicator (1) to check crankshaft end play (do not use force to hold the crankshaft in position). Remove the generator. Remove only enough shims to get the original amount of end play as shown in Step 2.
PUT BOLTS IN POSITION
9. Bolt. 10. Generator support.7. Install the generator and again check the crankshaft end play. After the correct amount of shims has been installed, bend the locks under bolts (8).8. Install but do not tighten all bolts (9) that fasten generator supports (10) to the base.
Caterpillar parts catalog:
Parts carrier Caterpillar catalog:
7G5445
CARRIER-PLANETARY
613C, 613C II, 613G, 936, G936
613C, 613C II, 613G, 936, G936
4V7062
CARRIER
518, 528, 613C, 916, 950, 950B, 950B/950E, D300B, G936
518, 528, 613C, 916, 950, 950B, 950B/950E, D300B, G936
4V7061
CARRIER
518, 528, 613C, 916, 950, 950B, 950B/950E, D300B, G936
518, 528, 613C, 916, 950, 950B, 950B/950E, D300B, G936
6Y7879
CARRIER-PLANETARY
950F II, 950G, 950G II, 950H, 950K, 960F, 962G, 962G II, 962H, 962K, 966C, IT62G, IT62G II, IT62H, R1300G II
950F II, 950G, 950G II, 950H, 950K, 960F, 962G, 962G II, 962H, 962K, 966C, IT62G, IT62G II, IT62H, R1300G II
6Y2109
CARRIER-SEAL
936, 936F, 950B, 950B/950E, 950F, 950F II, 950G, 950G II, 950H, 950K, 960F, 962G, 962G II, 962H, 962K, 966C, 966H, 966K, 966M, G936, IT62G, IT62G II, IT62H, R1300, R1300G, R1300G II
936, 936F, 950B, 950B/950E, 950F, 950F II, 950G, 950G II, 950H, 950K, 960F, 962G, 962G II, 962H, 962K, 966C, 966H, 966K, 966M, G936, IT62G, IT62G II, IT62H, R1300, R1300G, R1300G II
5V1277
CARRIER ASSEM.
528, 613B, 815, 950, 950B, 950B/950E, 966C, D25C, D30C, D350C, D35C, D35HP, D400
528, 613B, 815, 950, 950B, 950B/950E, 966C, D25C, D30C, D350C, D35C, D35HP, D400
9G1227
CARRIER-PLANETARY
936, G936
936, G936
5V6177
CARRIER-PLANETARY
508, 518, 936, D250B, D300B, D300D, G936
508, 518, 936, D250B, D300B, D300D, G936
9W4957
CARRIER-PLANETARY
936, 936F, G936
936, 936F, G936
1T1481
CARRIER-RING
936, 950B, 950B/950E, 950F, 966R, G936
936, 950B, 950B/950E, 950F, 966R, G936
9K1759
CARRIER
528, 814, 815, 966C
528, 814, 815, 966C
7G2842
CARRIER
950B, 950B/950E, 966C, 966R
950B, 950B/950E, 966C, 966R
1T1481
CARRIER-RING
936, 950B, 950B/950E, 950F, 966R, G936
936, 950B, 950B/950E, 950F, 966R, G936
9W4957
CARRIER-PLANETARY
936, 936F, G936
936, 936F, G936
3T0785
CARRIER AS-RING
615, D300B
615, D300B
3T7006
CARRIER AS
637E
637E
7G0714
CARRIER AS
637E, 69D, 768C, 769C, AD40, AD45, AE40, AE40 II
637E, 69D, 768C, 769C, AD40, AD45, AE40, AE40 II
7G0713
CARRIER AS
637E, 69D, 735, 735B, 740, 740B, 768C, 769C, 769D, 770, 771C, 771D, 772, AD40, AD45, AD45B, AD55, AE40, AE40 II, D400E II
637E, 69D, 735, 735B, 740, 740B, 768C, 769C, 769D, 770, 771C, 771D, 772, AD40, AD45, AD45B, AD55, AE40, AE40 II, D400E II
1T1573
CARRIER AS-GUIDE
930R, 966R
930R, 966R
5Y1066
CARRIER AS
930R
930R
5Y1307
CARRIER AS
930R
930R
8R0807
CARRIER & LINING AS
528, 528B, 530B, 910
528, 528B, 530B, 910