1W1490 CLAMP Caterpillar parts
943, 953, 953C, 973, 973C
Rating:
Alternative (cross code) number:
CA1W1490
1W-1490
1W1490
CA1W1490
1W-1490
1W1490
Weight: 1 pounds 0 kg.
TRACK LOADER,
Information:
Installation Procedure
Table 1
Required Tools    
Tool    Part Number    Part Description    Qty    
A     138-7575     Link Bracket     2    
B     1P-2420     Transmission Repair Stand     1    
C     1P-1861     Retaining Ring Pliers     1    
D     1P-1863     Retaining Ring Pliers     1    
E     4C-9614     Silicone Sealant     1    Note: Cleanliness is an important factor. Before assembly, thoroughly clean all parts in cleaning fluid. Allow the parts to air dry. Do not use wiping cloths or rags to dry parts. Lint may be deposited on the parts which may cause trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement. Dirt and other contaminants can damage the precision component. Perform assembly procedures on a clean work surface. Keep components covered and protected at all times.Note: Check the O-ring seals, the gaskets, and the seals for wear or for damage. Replace the components, if necessary.
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.Refer to Special Publication, NENG2500, "Caterpillar Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Caterpillar products.Dispose of all fluids according to local regulations and mandates.
Illustration 1 g01300229
Raise the temperature of bearing (11). Install bearing (11) onto shaft assembly (9). Use Tooling (D) in order to install retaining (10) .
Illustration 2 g01300228
Install shaft assembly (9). Use Tooling (C) in order to install retaining (8).
Illustration 3 g01357848
Apply Tooling (E) in the area at the joint of the torque converter housing and the transmission housing. Position the gasket and oil pan (6). Install bolts (5) to a torque of 55 10 N m (40 7 lb ft).
Connect harness assembly (7) .
Illustration 4 g01300224
Install screen (4), magnetic filter (3), cover (2), and bolts (1) .
Illustration 5 g01300222
Attach Tooling (A) and a suitable lifting device to the transmission. The weight of the transmission is approximately 680 kg (1500 lb). Remove the transmission from Tooling (B) .
Table 1
Required Tools    
Tool    Part Number    Part Description    Qty    
A     138-7575     Link Bracket     2    
B     1P-2420     Transmission Repair Stand     1    
C     1P-1861     Retaining Ring Pliers     1    
D     1P-1863     Retaining Ring Pliers     1    
E     4C-9614     Silicone Sealant     1    Note: Cleanliness is an important factor. Before assembly, thoroughly clean all parts in cleaning fluid. Allow the parts to air dry. Do not use wiping cloths or rags to dry parts. Lint may be deposited on the parts which may cause trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement. Dirt and other contaminants can damage the precision component. Perform assembly procedures on a clean work surface. Keep components covered and protected at all times.Note: Check the O-ring seals, the gaskets, and the seals for wear or for damage. Replace the components, if necessary.
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.Refer to Special Publication, NENG2500, "Caterpillar Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Caterpillar products.Dispose of all fluids according to local regulations and mandates.
Illustration 1 g01300229
Raise the temperature of bearing (11). Install bearing (11) onto shaft assembly (9). Use Tooling (D) in order to install retaining (10) .
Illustration 2 g01300228
Install shaft assembly (9). Use Tooling (C) in order to install retaining (8).
Illustration 3 g01357848
Apply Tooling (E) in the area at the joint of the torque converter housing and the transmission housing. Position the gasket and oil pan (6). Install bolts (5) to a torque of 55 10 N m (40 7 lb ft).
Connect harness assembly (7) .
Illustration 4 g01300224
Install screen (4), magnetic filter (3), cover (2), and bolts (1) .
Illustration 5 g01300222
Attach Tooling (A) and a suitable lifting device to the transmission. The weight of the transmission is approximately 680 kg (1500 lb). Remove the transmission from Tooling (B) .
Caterpillar parts catalog:
Parts clamp Caterpillar catalog:
1285924
CLAMP
120H, 120H ES, 120H NA, 120M, 120M 2, 12H, 12H ES, 12H NA, 12M, 12M 2, 135H, 135H NA, 140H, 140H ES, 140H NA, 140M, 140M 2, 143H, 14H, 14H NA, 14M, 160H, 160H ES, 160H NA, 160M, 160M 2, 163H, 163H NA,...
120H, 120H ES, 120H NA, 120M, 120M 2, 12H, 12H ES, 12H NA, 12M, 12M 2, 135H, 135H NA, 140H, 140H ES, 140H NA, 140M, 140M 2, 143H, 14H, 14H NA, 14M, 160H, 160H ES, 160H NA, 160M, 160M 2, 163H, 163H NA,...
7T5856
CLAMP
135H, 135H NA, 143H, 14H, 14H NA, 160H ES, 160H NA, 163H NA, 5130B, 517, 5230, 5230B, 527, 539, 814B, 815B, 816F, 816F II, 824G II, 824H, 826C, 826G, 826G II, 826H, 834G, 834H, 836, 836G, 836H, 910G, ...
135H, 135H NA, 143H, 14H, 14H NA, 160H ES, 160H NA, 163H NA, 5130B, 517, 5230, 5230B, 527, 539, 814B, 815B, 816F, 816F II, 824G II, 824H, 826C, 826G, 826G II, 826H, 834G, 834H, 836, 836G, 836H, 910G, ...
8X6319
CLAMP
5130, 5130B, 517, 5230, 5230B, 527, D4H, D4H XL, D4HTSK III, D5H, D5H XL, D5HTSK II, D6H, D6H XL, D6H XR, D6R, D7H, D7R
5130, 5130B, 517, 5230, 5230B, 527, D4H, D4H XL, D4HTSK III, D5H, D5H XL, D5HTSK II, D6H, D6H XL, D6H XR, D6R, D7H, D7R
6Y9281
CLAMP
583R, 583T, D10N, D6H, D6H II, D6H XL, D6H XR, D6R, D6R II, D6R III, D6R STD, D6T, D6T LGP, D6T XL, D7H, D7R, D7R II, D8N
583R, 583T, D10N, D6H, D6H II, D6H XL, D6H XR, D6R, D6R II, D6R III, D6R STD, D6T, D6T LGP, D6T XL, D7H, D7R, D7R II, D8N
6Y9280
CLAMP
583R, 583T, D10N, D6H, D6H II, D6H XL, D6H XR, D6R, D6R II, D6R III, D6R STD, D6T, D6T LGP, D6T XL, D7H, D7R, D7R II, D8N
583R, 583T, D10N, D6H, D6H II, D6H XL, D6H XR, D6R, D6R II, D6R III, D6R STD, D6T, D6T LGP, D6T XL, D7H, D7R, D7R II, D8N
9U9121
CLAMP
D6H, D6H II, D6H XL, D6H XR, D6R, D6R II, D6R III, D6R STD, D6T, D6T LGP, D6T LGPPAT, D6T XL
D6H, D6H II, D6H XL, D6H XR, D6R, D6R II, D6R III, D6R STD, D6T, D6T LGP, D6T LGPPAT, D6T XL
1W6694
CLAMP AS
24H, 5130, 5130B, 589, 631E, 631G, 633E II, 637E, 637G, 651E, 657E, AD55, D10N, D10R, D11N, D11R, D8L, D9L, D9N, D9R, PM-200, PM-201, PM-565, PM-565B
24H, 5130, 5130B, 589, 631E, 631G, 633E II, 637E, 637G, 651E, 657E, AD55, D10N, D10R, D11N, D11R, D8L, D9L, D9N, D9R, PM-200, PM-201, PM-565, PM-565B
7W1208
CLAMP
589, D10N, D10R, D11N, D11R, D8L, D9N, D9R, D9T
589, D10N, D10R, D11N, D11R, D8L, D9N, D9R, D9T
2563467
CLAMP
953D, 963D, D5R LGP, D6N
953D, 963D, D5R LGP, D6N
2313775
CLAMP
D10R, D11R, D6R II, D6R III, D6T, D6T XL, D7R II, D8R II, D9R
D10R, D11R, D6R II, D6R III, D6T, D6T XL, D7R II, D8R II, D9R
1834224
CLAMP-PIPE
611, 615C, D6R II
611, 615C, D6R II
1V2130
CLAMP
973, 973C, 973D, 977K, 977L
973, 973C, 973D, 977K, 977L