1073479 EDGE-CUTTING Caterpillar parts
Rating:
Alternative (cross code) number:
CA1073479
107-3479
1073479
CA1073479
107-3479
1073479
Weight: 190 pounds 86 kg.
Information:
ABRASION RESISTANT MATERIAL
N
BOLT HOLE SIZE
28
mm
CHAMFER
EDGE
HOLE PATTERN
CENTERLINE
HOLE SPACING
152.4
mm
LENGTH
1034.4
mm
NUMBER OF HOLES
7
THICKNESS
45
mm
TUNGSTEN CARBIDE
N
WIDTH
254
mm
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
$339.44
27 Aug 2022
Amazon.com
CTP 1073479 Bulldozer Blade for Model D8, Center Edge, 1.77" Edge Thickness
CTP For Model D8 || Center Edge || 1.77" Edge Thickness
CTP For Model D8 || Center Edge || 1.77" Edge Thickness
$415.90
04 May 2022
US: Florida-Parts-Z
4T6301 - Center Cutting Edge 8S 1U4933 1073479 fits Caterpillar (CAT)
FIRST PRICE PARTS
FIRST PRICE PARTS
Information:
Note: This test checks the Exhaust Balance Valve for proper operation. Component locations outlined in this procedure may not represent all applications. Refer to the system operations manual of the machine or engine you are working on for correct component locations.
Table 1
Required Tooling For C9.3 Applications
Quantity Part Number
1 215-2592 Wastegate Kit
1 5P-8869 9/16"-18 JIC to 1/4"-18 NPTF
1 006-6586 1/4"-18 NPTF to hose barb
Table 2
Required Tooling For C13, C15 and C18 Applications
Quantity Part Number
1 215-2592 Wastegate Kit
1 061-7921 7/16"-20 JIC to 1/4" NPTF
1 006-6586 1/4"-18 NPTF to hose barb
Illustration 1 g02032893
(1) Connection points to check
Table 3
Troubleshooting Test Steps Values Results
1. Inspect the Air Lines from the Exhaust Balance Valve Solenoid to the Exhaust Balance Valve Actuator
Inspection of the air lines is difficult in some applications. Test Step 5 will provide further testing procedures.
A. Inspect the air lines from the outlet of the exhaust balance valve solenoid to the inlet of the exhaust balance valve actuator. Inspect the lines for any signs of leakage.
Damaged air line
Result: A line is damaged.
Repair the line or replace the line. Return the unit to service.
Result: A line is not damaged.
Proceed to Test Step 2.
Illustration 2 g02032979
(2) Linkage to the exhaust balance valve
(3) Connection point from the exhaust balance valve to the linkage, soot build -up at this linkage is normal
Table 4
Troubleshooting Test Steps Values Results
2. Inspect the Linkage to the Exhaust Balance Valve
A. Inspect the linkage to the exhaust balance valve from the canister to the housing. Also, inspect the connection point from the linkage to the valve. Inspect the linkage for the following issues:
1. Bending
2. Breakage
Damaged or broken linkage
Result: The linkage is damaged.
Replace the turbocharger. Return the unit to service.
Result: The linkage is not damaged.
Proceed to Test Step 3.
Illustration 3 g02337917
(4) Pressure regulator on the 215-2592 Wastegate Kit
(5) Gate valve # 1 on the 215-2592 Wastegate Kit
(6) Pressure gauge on the 215-2592 Wastegate Kit
(7) Hose from the mixer to the exhaust balance valve solenoid
(8) Exhaust balance valve solenoid
(9) Exhaust balance valve
(10) Gate valve # 2 on the 215-2592 Wastegate Kit
Illustration 4 g02402325
(7) Hose Only disconnect the hose from the mixer, do not disconnect the hose from the balance valve solenoid.
Illustration 5 g02402320
(5) Gate valve #1
(10) Gate valve #2
Illustration 6 g02338036
(11) Fitting for the line to the exhaust balance valve
Table 5
Troubleshooting Test Steps Values Results
3. Test the Exhaust Balance Valve Solenoid to Make Sure that the Valve Is Not Stuck in the Closed Position
A. Disconnect hose (7) from the mixer. Refer to Illustration 4.
B. Connect the 215-2592 Wastegate Kit and necessary adapters between hose (7) and the mixer. The other end of hose (7) must stay connected to the inlet of the balance valve solenoid.
C. Turn the keyswitch to the OFF position.
Only apply 138 kPa (
Table 1
Required Tooling For C9.3 Applications
Quantity Part Number
1 215-2592 Wastegate Kit
1 5P-8869 9/16"-18 JIC to 1/4"-18 NPTF
1 006-6586 1/4"-18 NPTF to hose barb
Table 2
Required Tooling For C13, C15 and C18 Applications
Quantity Part Number
1 215-2592 Wastegate Kit
1 061-7921 7/16"-20 JIC to 1/4" NPTF
1 006-6586 1/4"-18 NPTF to hose barb
Illustration 1 g02032893
(1) Connection points to check
Table 3
Troubleshooting Test Steps Values Results
1. Inspect the Air Lines from the Exhaust Balance Valve Solenoid to the Exhaust Balance Valve Actuator
Inspection of the air lines is difficult in some applications. Test Step 5 will provide further testing procedures.
A. Inspect the air lines from the outlet of the exhaust balance valve solenoid to the inlet of the exhaust balance valve actuator. Inspect the lines for any signs of leakage.
Damaged air line
Result: A line is damaged.
Repair the line or replace the line. Return the unit to service.
Result: A line is not damaged.
Proceed to Test Step 2.
Illustration 2 g02032979
(2) Linkage to the exhaust balance valve
(3) Connection point from the exhaust balance valve to the linkage, soot build -up at this linkage is normal
Table 4
Troubleshooting Test Steps Values Results
2. Inspect the Linkage to the Exhaust Balance Valve
A. Inspect the linkage to the exhaust balance valve from the canister to the housing. Also, inspect the connection point from the linkage to the valve. Inspect the linkage for the following issues:
1. Bending
2. Breakage
Damaged or broken linkage
Result: The linkage is damaged.
Replace the turbocharger. Return the unit to service.
Result: The linkage is not damaged.
Proceed to Test Step 3.
Illustration 3 g02337917
(4) Pressure regulator on the 215-2592 Wastegate Kit
(5) Gate valve # 1 on the 215-2592 Wastegate Kit
(6) Pressure gauge on the 215-2592 Wastegate Kit
(7) Hose from the mixer to the exhaust balance valve solenoid
(8) Exhaust balance valve solenoid
(9) Exhaust balance valve
(10) Gate valve # 2 on the 215-2592 Wastegate Kit
Illustration 4 g02402325
(7) Hose Only disconnect the hose from the mixer, do not disconnect the hose from the balance valve solenoid.
Illustration 5 g02402320
(5) Gate valve #1
(10) Gate valve #2
Illustration 6 g02338036
(11) Fitting for the line to the exhaust balance valve
Table 5
Troubleshooting Test Steps Values Results
3. Test the Exhaust Balance Valve Solenoid to Make Sure that the Valve Is Not Stuck in the Closed Position
A. Disconnect hose (7) from the mixer. Refer to Illustration 4.
B. Connect the 215-2592 Wastegate Kit and necessary adapters between hose (7) and the mixer. The other end of hose (7) must stay connected to the inlet of the balance valve solenoid.
C. Turn the keyswitch to the OFF position.
Only apply 138 kPa (
Parts edge Caterpillar catalog:
1073477
EDGE-CUTTING
Caterpillar
Caterpillar
1073476
EDGE-CUTTING
Caterpillar
Caterpillar
1073475
EDGE-CUTTING
Caterpillar
Caterpillar
1073474
EDGE
Caterpillar
Caterpillar
1073473
EDGE-CUTTING
Caterpillar
Caterpillar
1073444
EDGE AS.-BASE
Caterpillar
Caterpillar
1073524
EDGE AS.-
Caterpillar
Caterpillar
1073484
EDGE-CUTTING
Caterpillar
Caterpillar
1073483
EDGE-CUTTING
Caterpillar
Caterpillar
1073482
EDGE-CUTTING
Caterpillar
Caterpillar
1073481
EDGE-CUTTING
Caterpillar
Caterpillar
1073480
EDGE-CUTTING
Caterpillar
Caterpillar