8N3071 ENGINE AR Caterpillar parts
D4E
Rating:
Alternative (cross code) number:
CA8N3071
8N-3071
8N3071
CA8N3071
8N-3071
8N3071
Weight: 2 pounds 1 kg.
TRACK-TYPE TRACTOR,
Compatible equipment models: 8N3071:
Information:
Start by:a. Install steering frame lock link.1. Stop the machine so that the bucket is positioned flat on the ground. 2. Remove nut (1), washers and bolt (2) that hold the tilt link pin and collet assemblies.3. Attach a suitable lifting strap and hoist to tilt link (3). Use tooling (A) to remove the collets from both sides of the link pin assembly. Refer to Remove Pins and Collets in this module.4. Remove the tilt link pin. The weight of the tilt link pin is 23 kg (51 lb). 5. Remove bolt (4), washers and nut from the tilt lever collet assemblies.6. Use tooling (A) to remove collets (5) from both sides of the tilt lever assembly. Refer to Remove Pins and Collets in this module.7. Remove the tilt lever pin. The weight of the tilt lever pin is 23 kg (51 lb).8. Remove the tilt link from the machine. The weight of the tilt link is 120 kg (264 lb). 9. Remove lip seals (6) from both sides of the tilt link. Repeat this step for the other end of the tilt link.10. Remove bearing (7) from the tilt link. Repeat this step for the other end of the tilt link.Install Tilt Link
1. Install bearings (1) in both ends of the tilt link. Make sure that the bearings are centered in the bores.2. Use tooling (A) to install lip seals (2) on both sides of bearings (1) in each end of the tilt link. 3. Attach a suitable lifting strap and hoist to tilt link (3). Put the tilt link in position between the bucket and the tilt lever. The weight of the tilt link is 120 kg (264 lb).4. Put 5P-0960 Lubricant in the pin bore and install the pin in the tilt lever end of the tilt link. The weight of the tilt lever pin is 23 kg (51 lb).5. Install collet assemblies (4).6. Put 5P-3931 Anti-Seize Compound on the thread of the bolt that holds the collet assemblies to the pin assembly. Install bolt (5) with the washers and nut in the collet assemblies. The collet on one side must not extend farther than the other collet when the bolts are tight.7. Tighten the bolt and nut that hold the collet assemblies to the pin assembly as follows:a. Tighten bolt (5) and the nut evenly to a torque of 1800 200 N m (1330 150 lb ft). After the bolt and nut are tight, hit the collet on each side with a heavy hammer until the torque on the bolt and nut is less than 950 N m (700 lb ft).b. Tighten bolt (5) and the nut again to a torque of 1800 200 N m (1330 150 lb ft). Hit each collet again until the torque for the bolt and nut is less than 1600 N m (1180 lb ft).c. Tighten the bolt and nut to a final torque of 1800 200 N m (1330 150 lb
1. Install bearings (1) in both ends of the tilt link. Make sure that the bearings are centered in the bores.2. Use tooling (A) to install lip seals (2) on both sides of bearings (1) in each end of the tilt link. 3. Attach a suitable lifting strap and hoist to tilt link (3). Put the tilt link in position between the bucket and the tilt lever. The weight of the tilt link is 120 kg (264 lb).4. Put 5P-0960 Lubricant in the pin bore and install the pin in the tilt lever end of the tilt link. The weight of the tilt lever pin is 23 kg (51 lb).5. Install collet assemblies (4).6. Put 5P-3931 Anti-Seize Compound on the thread of the bolt that holds the collet assemblies to the pin assembly. Install bolt (5) with the washers and nut in the collet assemblies. The collet on one side must not extend farther than the other collet when the bolts are tight.7. Tighten the bolt and nut that hold the collet assemblies to the pin assembly as follows:a. Tighten bolt (5) and the nut evenly to a torque of 1800 200 N m (1330 150 lb ft). After the bolt and nut are tight, hit the collet on each side with a heavy hammer until the torque on the bolt and nut is less than 950 N m (700 lb ft).b. Tighten bolt (5) and the nut again to a torque of 1800 200 N m (1330 150 lb ft). Hit each collet again until the torque for the bolt and nut is less than 1600 N m (1180 lb ft).c. Tighten the bolt and nut to a final torque of 1800 200 N m (1330 150 lb
Caterpillar SIS machinery equipment:
Caterpillar SIS
D4E TRACTOR / POWER SHIFT / 69X01425-UP (MACHINE) POWERED BY 3304 ENGINE »
8N-3071
ENGINE AR
D4E TRACTOR / POWER SHIFT / 69X01425-UP (MACHINE) POWERED BY 3304 ENGINE »
8N-3071
ENGINE AR
D4E TRACTOR / POWER SHIFT / 28X01727-UP (MACHINE) POWERED BY 3304 ENGINE »
8N-3071
ENGINE AR
D4E TRACTOR / POWER SHIFT / 28X01727-UP (MACHINE) POWERED BY 3304 ENGINE »
8N-3071
ENGINE AR
D4E LGP / POWER SHIFT / 72X00639-UP (MACHINE) POWERED BY 3304 ENGINE »
8N-3071
ENGINE AR
D4E LGP / POWER SHIFT / 72X00639-UP (MACHINE) POWERED BY 3304 ENGINE »
8N-3071
ENGINE AR
Caterpillar parts catalog:
Parts engine Caterpillar catalog:
3A1756
ENGINE MOUNTING HARDWARE GROUP
941, 951B, D4D, D4E
941, 951B, D4D, D4E
2W1876
ENGINE AR
D4E
D4E
4N3799
ENGINE ARRANGEMENT
D4D, D4E
D4D, D4E
6C0112
ENGINE AR
D4E
D4E
5C8754
ENGINE AR
D4E
D4E
5C8725
ENGINE AR
D4E
D4E
5P9418
ENGINE AND TRANSMISSION OIL COOLER
120G, 12G, 130G, 3304, 518, 920, 930, 930R, 941, 950, 966C, D4D, D4E, D5B, D6D
120G, 12G, 130G, 3304, 518, 920, 930, 930R, 941, 950, 966C, D4D, D4E, D5B, D6D
5C8753
ENGINE AR
D4E
D4E
6C0113
ENGINE AR
D4E
D4E
5C8832
ENGINE AR
D5B
D5B
5C8756
ENGINE AR
D5B
D5B
7N4978
ENGINE AR
D5B
D5B
6N6626
ENGINE AR
953
953
5C8759
ENGINE AR
D5B
D5B
5C8757
ENGINE AR
D5B
D5B
5C8725
ENGINE AR
D4E
D4E
5C8754
ENGINE AR
D4E
D4E
6C0112
ENGINE AR
D4E
D4E