0031348 EXTENSION Caterpillar parts
Rating:
Alternative (cross code) number:
CA0031348
003-1348
0031348
CA0031348
003-1348
0031348
Weight: 0.59 pounds 0 kg.
Information:
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 439-3939 Link Bracket As 1
B 1P-3532 Track Block Assembly 1
C - Loctite Graphite-50 -
Place the track under the machine. Lower the side of the machine onto the track.
Remove a carrier bolt. Install Tooling (A) to the final drive carrier. Attach a chain to Tooling (A). Attach the chain to the track. Align the chain with the top of the carrier roller and the idler. Rotate the final drive in the reverse direction. The final drive will pull the track onto the final drive. Remove the bolt from the carrier and remove the chain.
Illustration 1 g02161733
Note the direction of the track.
Lift the end of the track and place Tooling (B) under the track.
Turn the final drive in the reverse direction to pull the track together.Note: Make sure that the serrations on the master links are clean and dry.
Illustration 2 g00866482
Align the lower ends of the master links with the upper ends. Make sure that the serrations of both ends are engaged.
Illustration 3 g00866497
Place the master shoe in position on the master links. Apply Tooling (C) to the threads and to the shaft of the master link bolts. Tighten the four bolts to a torque of 400 70 N m (300 50 lb ft). Then, tighten the bolts by an additional turn of 120 5 degrees.
Illustration 4 g00820219
Tighten relief valve (2) and tighten track adjustment valve (3) to a torque of 35 7 N m (26 5 lb ft).Reference: When you adjust the tension of the track, refer to the procedure in Operation and Maintenance Manual, SEBU7299, "Track - Check/Adjust".
Illustration 5 g00820599
Install track adjuster cover (1) to the track roller frame.
Table 1
Required Tools
Tool Part Number Part Description Qty
A 439-3939 Link Bracket As 1
B 1P-3532 Track Block Assembly 1
C - Loctite Graphite-50 -
Place the track under the machine. Lower the side of the machine onto the track.
Remove a carrier bolt. Install Tooling (A) to the final drive carrier. Attach a chain to Tooling (A). Attach the chain to the track. Align the chain with the top of the carrier roller and the idler. Rotate the final drive in the reverse direction. The final drive will pull the track onto the final drive. Remove the bolt from the carrier and remove the chain.
Illustration 1 g02161733
Note the direction of the track.
Lift the end of the track and place Tooling (B) under the track.
Turn the final drive in the reverse direction to pull the track together.Note: Make sure that the serrations on the master links are clean and dry.
Illustration 2 g00866482
Align the lower ends of the master links with the upper ends. Make sure that the serrations of both ends are engaged.
Illustration 3 g00866497
Place the master shoe in position on the master links. Apply Tooling (C) to the threads and to the shaft of the master link bolts. Tighten the four bolts to a torque of 400 70 N m (300 50 lb ft). Then, tighten the bolts by an additional turn of 120 5 degrees.
Illustration 4 g00820219
Tighten relief valve (2) and tighten track adjustment valve (3) to a torque of 35 7 N m (26 5 lb ft).Reference: When you adjust the tension of the track, refer to the procedure in Operation and Maintenance Manual, SEBU7299, "Track - Check/Adjust".
Illustration 5 g00820599
Install track adjuster cover (1) to the track roller frame.
Parts extension Caterpillar catalog:
0024440
EXTENSION
Caterpillar
Caterpillar
0022822
EXTENSION
Caterpillar
Caterpillar
0014860
EXTENSION A.
Caterpillar
Caterpillar
0007240
EXTENSION
Caterpillar
Caterpillar
0007237
EXTENSION
Caterpillar
Caterpillar
3676064
EXTENSION-EXH-YM
Caterpillar
Caterpillar
0085740
EXTENSION
Caterpillar
Caterpillar
0084519
EXTENSION
Caterpillar
Caterpillar
0062331
EXTENSION
Caterpillar
Caterpillar
0056186
EXTENSION
Caterpillar
Caterpillar
0050877
EXTENSION A
Caterpillar
Caterpillar
0033759
EXTENSION
Caterpillar
Caterpillar