1315323 FRAME AS-TRACK ROLLER Caterpillar parts
345B L
Rating:
Alternative (cross code) number:
CA1315323
131-5323
1315323
CA1315323
131-5323
1315323
EXCAVATOR,
Compatible equipment models: 1315323:
Information:
The chart above shows the new bank valves (implement control) that have replaced the former bank valves (implement control) on the 914G Wheel Loaders and the IT14G Integrated Toolcarriers in all of the hydraulic mounting and valve groups listed. The new bank valves (implement control) have a new outlet housing. The new outlet housing restricts oil returning to the tank which improves the operation operation of the make up valve. This will prevent the rod end of the lift cylinder from becoming void of oil when a heavy load is being lowered. A new tube assembly is also being released.
Adaptable To: The new bank valves (implement control) are adaptable to the 914G Wheel Loaders and IT14G Integrated Toolcarriers back to the first production units. The new tube assemblies listed supercede the former tube assemblies. The new tube assemblies become effective with the new bank valves (implement control) as stated in the "New Bank Valves (Implement Control) Effectivity" at the end of this article.
Replace the former parts with the new parts as stated in the two above charts.
Bank Valve Conversions
The former bank valves (implement control) for the 914G Wheel Loaders and the IT14G Integrated Toolcarriers can be converted to the new bank valves (implement control). The new tube assemblies listed in the two adaption charts are part of the parent groups (hydraulic mounting and valve groups) listed in the "New Bank Valves (Implement Control)" chart. The new tube assemblies supercede the former tube assemblies in all of the hydraulic mounting and valve groups listed. Conversion instructions are as follows.
Two Bank Valve Conversion
Illustration 1.
Valve Conversions.
Illustration 2. 1. Remove the three nuts (1) that hold outlet housing (2) onto the bank valves (implement control).2. Remove 106-3118 Outlet Housing (2).3. Remove 061-8324 Rod (3).4. Remove 106-3100 Rods (4).5. Remove 114-8688 Tube Assembly, (5) in Illustration 2.
Illustration 3.
Valve Conversions.
Illustration 4.
Valve Conversions.6. Install 121-5860 Outlet Housing (6) in place of (2).7. Install 121-9227 Rod (7) in place of (3).8. Install 121-9226 Rods (8) in place of (4).9. Install 137-9787 Tube Assembly, (9) in Illustration 4, place of (5).10. Install the three nuts, (1) in Illustration 3, that hold outlet housing (2) on to the bank valves (implement control).Three Bank Valve Conversion
Illustration 5.
Valve Conversions.
Illustration 6.
Valve Conversions.1. Remove the three nuts (1) that hold outlet housing (2) onto the bank valves (implement control).2. Remove 106-3118 Outlet Housing (2).3. Remove 106-5873 Rod (3).4. Remove 106-5872 Rods (4).5. Remove 112-5122 Tube Assembly, (5) in Illustration 6.
Illustration 7.
Valve Conversions.
Illustration 8.
Valve Conversions.6. Install 121-5860 Outlet Housing (6) in place of (2).7. Install 121-9229 Rod (7) in place of (3).8. Install 121-9228 Rods (8) in place of (4).9. Install 137-9789 Tube Assembly ,(9) in Illustration 8, in place of (5).10. Install the three nuts ,(1) in Illustration 7, that hold outlet housing (2) onto the bank valves (implement control).Four Bank Valve Conversion
Illustration 9.
Valve Conversions.
Illustration 10.
Valve Conversions.1. Remove the three nuts (1) that hold outlet housing (2) onto the bank valves (implement control).2. Remove 107-1003 Outlet Housing (2).3. Remove 114-8689 Tube Assembly
Adaptable To: The new bank valves (implement control) are adaptable to the 914G Wheel Loaders and IT14G Integrated Toolcarriers back to the first production units. The new tube assemblies listed supercede the former tube assemblies. The new tube assemblies become effective with the new bank valves (implement control) as stated in the "New Bank Valves (Implement Control) Effectivity" at the end of this article.
Replace the former parts with the new parts as stated in the two above charts.
Bank Valve Conversions
The former bank valves (implement control) for the 914G Wheel Loaders and the IT14G Integrated Toolcarriers can be converted to the new bank valves (implement control). The new tube assemblies listed in the two adaption charts are part of the parent groups (hydraulic mounting and valve groups) listed in the "New Bank Valves (Implement Control)" chart. The new tube assemblies supercede the former tube assemblies in all of the hydraulic mounting and valve groups listed. Conversion instructions are as follows.
Two Bank Valve Conversion
Illustration 1.
Valve Conversions.
Illustration 2. 1. Remove the three nuts (1) that hold outlet housing (2) onto the bank valves (implement control).2. Remove 106-3118 Outlet Housing (2).3. Remove 061-8324 Rod (3).4. Remove 106-3100 Rods (4).5. Remove 114-8688 Tube Assembly, (5) in Illustration 2.
Illustration 3.
Valve Conversions.
Illustration 4.
Valve Conversions.6. Install 121-5860 Outlet Housing (6) in place of (2).7. Install 121-9227 Rod (7) in place of (3).8. Install 121-9226 Rods (8) in place of (4).9. Install 137-9787 Tube Assembly, (9) in Illustration 4, place of (5).10. Install the three nuts, (1) in Illustration 3, that hold outlet housing (2) on to the bank valves (implement control).Three Bank Valve Conversion
Illustration 5.
Valve Conversions.
Illustration 6.
Valve Conversions.1. Remove the three nuts (1) that hold outlet housing (2) onto the bank valves (implement control).2. Remove 106-3118 Outlet Housing (2).3. Remove 106-5873 Rod (3).4. Remove 106-5872 Rods (4).5. Remove 112-5122 Tube Assembly, (5) in Illustration 6.
Illustration 7.
Valve Conversions.
Illustration 8.
Valve Conversions.6. Install 121-5860 Outlet Housing (6) in place of (2).7. Install 121-9229 Rod (7) in place of (3).8. Install 121-9228 Rods (8) in place of (4).9. Install 137-9789 Tube Assembly ,(9) in Illustration 8, in place of (5).10. Install the three nuts ,(1) in Illustration 7, that hold outlet housing (2) onto the bank valves (implement control).Four Bank Valve Conversion
Illustration 9.
Valve Conversions.
Illustration 10.
Valve Conversions.1. Remove the three nuts (1) that hold outlet housing (2) onto the bank valves (implement control).2. Remove 107-1003 Outlet Housing (2).3. Remove 114-8689 Tube Assembly
Caterpillar parts catalog:
Parts frame Caterpillar catalog:
1388278
FRAME GP-UPPER FRONT WINDOW
320B, 322B LN, 325B L, 330B L, 345B II, 345B L, 365B, 365B II, 385B, 5090B
320B, 322B LN, 325B L, 330B L, 345B II, 345B L, 365B, 365B II, 385B, 5090B
1372920
FRAME GP-UPPER
345B, 345B L
345B, 345B L
1979143
FRAME GP-UPPER
345B L
345B L
1852653
FRAME
1090, 1190, 1190T, 120H, 120H ES, 120H NA, 120K, 120K 2, 1290T, 12G, 12H, 12H ES, 12H NA, 12K, 12M, 135H, 135H NA, 1390, 140G, 140H, 140H ES, 140H NA, 140K, 140K 2, 140M, 143H, 14H NA, 160H, 160H ES, ...
1090, 1190, 1190T, 120H, 120H ES, 120H NA, 120K, 120K 2, 1290T, 12G, 12H, 12H ES, 12H NA, 12K, 12M, 135H, 135H NA, 1390, 140G, 140H, 140H ES, 140H NA, 140K, 140K 2, 140M, 143H, 14H NA, 160H, 160H ES, ...
3T3418
FRAME AS-END
1090, 1190, 1190T, 120M, 120M 2, 1290T, 12M 2, 12M 3, 12M 3 AWD, 1390, 140M, 140M 2, 140M 3, 140M 3 AWD, 14H, 14M, 160M, 160M 2, 160M 3, 160M 3 AWD, 16H NA, 16M, 2290, 235, 235D, 2390, 2391, 245, 2491...
1090, 1190, 1190T, 120M, 120M 2, 1290T, 12M 2, 12M 3, 12M 3 AWD, 1390, 140M, 140M 2, 140M 3, 140M 3 AWD, 14H, 14M, 160M, 160M 2, 160M 3, 160M 3 AWD, 16H NA, 16M, 2290, 235, 235D, 2390, 2391, 245, 2491...
1362123
FRAME AS
320B, 325B L, 330B L, 345B L
320B, 325B L, 330B L, 345B L
1418066
FRAME AS-RISER
320B, 325B L, 330B L, 345B L
320B, 325B L, 330B L, 345B L
1532695
FRAME AS
345B L
345B L
1271353
FRAME AS-UPPER
345B L
345B L
1537404
FRAME AS
330B L, 345B L
330B L, 345B L
1537408
FRAME AS
330B L, 345B L
330B L, 345B L
1412224
FRAME AS
330B L
330B L
1407939
FRAME AS
330B L
330B L
1407940
FRAME AS
330B L
330B L
1977874
FRAME AS-UPPER
345B L
345B L
1523953
FRAME AS-UPPER
345B L
345B L
1344550
FRAME AS-UPPER
345B L
345B L
1511111
FRAME AS
345B L
345B L
1315325
FRAME AS-CARBODY
345B L
345B L