1090019 GEAR-OIL PUMP Caterpillar parts
Rating:
Alternative (cross code) number:
CA1090019
109-0019
1090019
CA1090019
109-0019
1090019
Weight: 3 pounds 1 kg.
Information:
6W7168 Shown(1) Rubber toric seals and all surfaces in contact with them must be clean and dry at assembly. Put a thin layer of oil on the contacting surfaces of metal seals (5) just before installation. Lubricate all other seals at assembly. Seal rings must be assembled square with the bore and thus must not be bulged or twisted.(3) The dimension should be 2.3 1.5 mm (.09 .06 in) after the retainer is pressed on with a force of ... 400 to 450 kN (45 to 50.6 tons)Thickness of shims (2) to be 0.05 mm (.002 in) less than dimension (3).(4) Put 5P3931 Anti-Seize Compound on splines.(8) Preload on bearings ... 0.10 to 0.18 mm (.004 to .007 in) tight Use shims (6) for adjustment.(9) Torque for nut ... 410 50 N m (305 37 lb ft) Do not torque more than 70 N m (50 lb ft) until the coupling is engaged with the shaft. Coupling is engaged when dimension (A) is ... 16.30 1.50 mm (.640 .059 in)(10) Torque for 28 bolts ... 270 40 N m (200 30 lb ft)(11) End play of bearings ... 0.05 to 0.13 mm (.002 to .005 in) loose Use shims (7) for adjustment.(12) With the machine on level surface, fill case with 5P1228 Drive Train Oil (TDTO) to bottom edge of hole. Before installing cage and two smaller covers, lubricate the respective bores with lubricant being sealed.(14) End play of bearings ... 0.00 to 0.10 mm (.000 to .004 in) loose Use shims (13) for adjustment.(15) Before installing relief valve, one liter of 5P1228 Drive Train Oil (TDTO) should be added through 1/2-PTF threaded hole (brake and motor should be installed before adding oil).(17) Torque for bolts ... 135 20 N m (100 15 lb ft)(19) Torque for bolts ... 47 9 N m (35 7 lb ft)(21) Torque for bolts ... 215 40 N m (159 30 lb ft)(23) Torque for bolt ... 2440 270 N m (1800 200 lb ft) Output Shaft (16) Bearing Adjustment Procedure
1. With shims (6) and the seal removed.2. Install four bolts (17) in cage (18) 90° apart for each other. Torque bolts (17) evenly to 55 N m (41 lb ft). Rotate shaft (16) three revolutions MINIMUM.3. Torque two bolts (17) evenly to 110 N m (81 lb ft). Rotate shaft (16) three revolutions MINIMUM. Loosen four bolts (17).4. Torque two bolts (17) evenly to 14 N m (10 lb ft). Rotate shaft (16) three revolutions MINIMUM. Torque four bolts (17) evenly to 22 N m (16 lb ft). Rotate shaft (16) three revolutions MINIMUM. Retorque four bolts (17) to 22 N m (16 lb ft).5. Measure the gap between cage (18) and case (24) at each bolt (17) location. Average the two measurements. Shim pack (6) thickness will equal this measurement. Select the shim pack and verify the thickness.6. Install shim pack (6)
Parts gear Caterpillar catalog:
1088768
GEAR - SUN
Caterpillar
Caterpillar
1086430
GEAR AS-
Caterpillar
Caterpillar
1086179
GEAR AS-
Caterpillar
Caterpillar
1085312
GEAR SET
Caterpillar
Caterpillar
1085298
GEAR
Caterpillar
Caterpillar
1080445
GEAR-RING
Caterpillar
Caterpillar
1092746
GEAR-OIL PUMP
Caterpillar
Caterpillar
1092745
GEAR-OIL PUMP
Caterpillar
Caterpillar
1092473
GEAR KIT
Caterpillar
Caterpillar
1092462
GEAR
Caterpillar
Caterpillar
1090356
GEAR - BEVEL
Caterpillar
Caterpillar
1090021
GEAR-OIL PUMP
Caterpillar
Caterpillar