4826792 GEAR-PLANETARY Caterpillar parts
Rating:
Alternative (cross code) number:
CA4826792
482-6792
4826792
CA4826792
482-6792
4826792
Information:
Discharging the Accumulator
Ensure that the oil in the hydraulic system is at normal operating temperature. Park the machine on a smooth, level surface.
Install the steering frame lock. Block the wheels. Stop the engine.
Install the steering frame lock. Block the wheels. Stop the engine.
Turn the engine start switch to the ON position. Move the joystick, the third function lever, and the fourth function control through the full range of travel.Note: Moving the joystick and moving the levers will release the pressure in the pilot hydraulic system.
Illustration 3 g01400337
Right side of machine
Illustration 4 g01407222
The pilot oil accumulator is to the right of the brake accumulators.
Raise the door on the right side of the machine in order to access the pilot accumulator. Remove the panel that is shown in Illustration 3.
Illustration 5 g01404528
Remove cap (1) which protects nitrogen charging valve (2) .
Remove the protective cap on nitrogen charging valve (2) .
Illustration 6 g01090692
(3) Nipple. (4) Coupling assembly. (5) Pressure gauge. (6) Hose assembly. (7) Coupling assembly. (8) Nipple. (9) Valve. (10) Pressure gauge. (11) Regulator assembly. (12) Pressure regulating screw. (13) Chuck for the nitrogen cylinder valve. (14) Valve handle. (15) Nitrogen charging chuck. (16) Hose assembly. (17) Tee.
Identify the correct nitrogen charging chuck.Note: For a nitrogen charging valve with a .305 inch -32 THD, use a 1S-8938 Nitrogen Charging Chuck and a 1U-5551 Extension Assembly. For a nitrogen charging valve with a .482 inch -26 THD, use a 7S-5106 Nitrogen Charging Chuck and a 7S-5439 Extension Assembly .
Attach hose assembly (16) to nitrogen charging chuck (15) .
Turn valve handle (14) on nitrogen charging chuck (15) all the way in the counterclockwise direction. This will ensure that nitrogen charging valve (2) will not be opened when nitrogen charging chuck (15) is attached to the nitrogen charging valve.
Attach nitrogen charging chuck (15) and hose assembly (16) to nitrogen charging valve (2) .
Attach nitrogen charging chuck (15) and hose assembly (16) to nitrogen charging valve (2) .
Place the open end of hose assembly (16) away from the work area and away from other personnel.
Turn valve handle (14) on nitrogen charging chuck (15) all the way in the clockwise direction in order to open nitrogen charging valve (2). This will release all of the compressed gas from the accumulator through hose assembly (16). Now, the accumulator can be removed from the machine.
Disconnect the hydraulic lines for servicing, as needed.Nitrogen Charging Procedure
Table 2
Required Tools    
Part Number     Description     Qty    
175-5507     Nitrogen Charging Group     1    
8T-0854     Pressure Gauge     1    
Illustration 7 g01090692
(1) Nipple. (2) Coupling assembly. (3) Pressure gauge. (4) Hose assembly. (5) Coupling assembly. (6) Nipple. (7) Valve. (8) Pressure gauge. (9) Regulator assembly. (10) Pressure regulating screw. (11) Chuck for the nitrogen cylinder valve. (12) Valve handle. (13) Nitrogen charging chuck. (14) Hose assembly. (15) Tee.
Ensure that valve (7) is closed. Install chuck (13) onto the pilot accumulator. Turn valve handle (12) completely in the clockwise direction.
If the reading on pressure gauge (8) is too high, slowly open
Ensure that the oil in the hydraulic system is at normal operating temperature. Park the machine on a smooth, level surface.
Install the steering frame lock. Block the wheels. Stop the engine.
Install the steering frame lock. Block the wheels. Stop the engine.
Turn the engine start switch to the ON position. Move the joystick, the third function lever, and the fourth function control through the full range of travel.Note: Moving the joystick and moving the levers will release the pressure in the pilot hydraulic system.
Illustration 3 g01400337
Right side of machine
Illustration 4 g01407222
The pilot oil accumulator is to the right of the brake accumulators.
Raise the door on the right side of the machine in order to access the pilot accumulator. Remove the panel that is shown in Illustration 3.
Illustration 5 g01404528
Remove cap (1) which protects nitrogen charging valve (2) .
Remove the protective cap on nitrogen charging valve (2) .
Illustration 6 g01090692
(3) Nipple. (4) Coupling assembly. (5) Pressure gauge. (6) Hose assembly. (7) Coupling assembly. (8) Nipple. (9) Valve. (10) Pressure gauge. (11) Regulator assembly. (12) Pressure regulating screw. (13) Chuck for the nitrogen cylinder valve. (14) Valve handle. (15) Nitrogen charging chuck. (16) Hose assembly. (17) Tee.
Identify the correct nitrogen charging chuck.Note: For a nitrogen charging valve with a .305 inch -32 THD, use a 1S-8938 Nitrogen Charging Chuck and a 1U-5551 Extension Assembly. For a nitrogen charging valve with a .482 inch -26 THD, use a 7S-5106 Nitrogen Charging Chuck and a 7S-5439 Extension Assembly .
Attach hose assembly (16) to nitrogen charging chuck (15) .
Turn valve handle (14) on nitrogen charging chuck (15) all the way in the counterclockwise direction. This will ensure that nitrogen charging valve (2) will not be opened when nitrogen charging chuck (15) is attached to the nitrogen charging valve.
Attach nitrogen charging chuck (15) and hose assembly (16) to nitrogen charging valve (2) .
Attach nitrogen charging chuck (15) and hose assembly (16) to nitrogen charging valve (2) .
Place the open end of hose assembly (16) away from the work area and away from other personnel.
Turn valve handle (14) on nitrogen charging chuck (15) all the way in the clockwise direction in order to open nitrogen charging valve (2). This will release all of the compressed gas from the accumulator through hose assembly (16). Now, the accumulator can be removed from the machine.
Disconnect the hydraulic lines for servicing, as needed.Nitrogen Charging Procedure
Table 2
Required Tools    
Part Number     Description     Qty    
175-5507     Nitrogen Charging Group     1    
8T-0854     Pressure Gauge     1    
Illustration 7 g01090692
(1) Nipple. (2) Coupling assembly. (3) Pressure gauge. (4) Hose assembly. (5) Coupling assembly. (6) Nipple. (7) Valve. (8) Pressure gauge. (9) Regulator assembly. (10) Pressure regulating screw. (11) Chuck for the nitrogen cylinder valve. (12) Valve handle. (13) Nitrogen charging chuck. (14) Hose assembly. (15) Tee.
Ensure that valve (7) is closed. Install chuck (13) onto the pilot accumulator. Turn valve handle (12) completely in the clockwise direction.
If the reading on pressure gauge (8) is too high, slowly open
Parts gear Caterpillar catalog:
4826790
GEAR-SHAFT
Caterpillar
Caterpillar
4826005
GEAR-SUN
Caterpillar
Caterpillar
4822294
GEAR AS-
Caterpillar
Caterpillar
4822293
GEAR AS-
Caterpillar
Caterpillar
4822292
GEAR AS-
Caterpillar
Caterpillar
4822256
GEAR-SET DIFF
Caterpillar
Caterpillar
4833220
GEAR AS-CROWD
Caterpillar
Caterpillar
4833211
GEAR AS-HOIST
Caterpillar
Caterpillar
4833209
GEAR AS
Caterpillar
Caterpillar
4833203
GEAR-MOTOR
Caterpillar
Caterpillar
4832334
GEAR GP-FRONT
Caterpillar
Caterpillar
4827712
GEAR GP-REAR
Caterpillar
Caterpillar