2589025 HARNESS AS Caterpillar parts
R1700G
Rating:
Alternative (cross code) number:
CA2589025
258-9025
2589025
CA2589025
258-9025
2589025
Weight: 6 pounds 2 kg.
LOAD HAUL DUMP,
Compatible equipment models: 2589025:
Information:
Introduction
Use the procedures that follow in order to check the vertical movement and the circular movement of the swing bearing. Two dial indicators with magnetic bases are required for the procedures.Required Tools
Table 2
Tool Description Qty
A Dial Indicator 2 Procedure To Measure Vertical Movement Of The Swing Bearing
Place the machine on level ground.
Empty the bucket.
Position the upper structure parallel with the tracks.
Inspect the static torque of the bolts in the swing bearing in order to make sure that the bolts are tightened properly.
Set the torque wrench to a torque value of 509 N m (375 lb ft).
Make a mark on the head of the bolt that is relative to the carbody or the bearing race.
Apply the specified torque to the bolt.
If the head of the bolt does not move, the torque is within the specification.
If the head of the bolt moves, replace the bolt.
Illustration 1 g01107785
(A) Dial indicator
(B) Dial indicator
(C) Outer race of the swing bearing
(D) Inner race of the swing bearing
(F) Carbody
Refer to Illustration 1. Position dial indicator (A) between the carbody and the outer race of the swing bearing (C). Position dial indicator (B) between the carbody and the outer race of the swing bearing (C). Note: Position the dial indicators at the front center of the carbody and at the rear center of the carbody.
Illustration 2 g02173683
Position the machine as shown in Illustration 2.
Adjust both dial indicators to "zero".
Illustration 3 g02173685
Position the machine as shown in Illustration 3. The angle between the ground and the track should be approximately 15 degrees.
Calculate the total distance of movement between dial indicator (A) and dial indicator (B). Record the total distance movement of in Table 1. Note: This measurement is one of three measurements of the vertical swing bearing movement to be used in Step 14.
Reposition the machine as shown in illustration 2.
Note the distance movement of both of the dial indicators. Calculate the difference for each dial indicator and the measurement at the zero point that was measured in Step 7. Note: The difference calculated for each dial indicator should be less than 0.05 mm ( 0.002 inch). A greater distance may indicate the dial indicator has moved out of the original zero position This greater distance also indicates that the measurement from Step 9 is not a valid measurement and additional vertical swing bearing movement measurements are necessary. Repeat Steps 6 through 11.
Remove the dial indicators. Rotate the upper structure three times in a clockwise direction. Rotate the upper structure three times in a counterclockwise direction.
Repeat Steps 5 through 12 three times.
Calculate the average of the values that were recorded in Step 9. Compare this average to the service limit specifications are shown in Table 1. Procedure To Measure Circular Movement Of The Swing Bearing
Place the machine on level ground.
Empty the bucket.
Illustration 4 g02173688
(E) 1000 mm (39.4 inch)
Position the upper structure parallel to the tracks. Refer to Illustration 4 for the correct position of the boom, of the stick, and of the bucket.
Stop the engine.
Illustration 5 g00740365
(A) Dial indicator
(C) Outer race
Use the procedures that follow in order to check the vertical movement and the circular movement of the swing bearing. Two dial indicators with magnetic bases are required for the procedures.Required Tools
Table 2
Tool Description Qty
A Dial Indicator 2 Procedure To Measure Vertical Movement Of The Swing Bearing
Place the machine on level ground.
Empty the bucket.
Position the upper structure parallel with the tracks.
Inspect the static torque of the bolts in the swing bearing in order to make sure that the bolts are tightened properly.
Set the torque wrench to a torque value of 509 N m (375 lb ft).
Make a mark on the head of the bolt that is relative to the carbody or the bearing race.
Apply the specified torque to the bolt.
If the head of the bolt does not move, the torque is within the specification.
If the head of the bolt moves, replace the bolt.
Illustration 1 g01107785
(A) Dial indicator
(B) Dial indicator
(C) Outer race of the swing bearing
(D) Inner race of the swing bearing
(F) Carbody
Refer to Illustration 1. Position dial indicator (A) between the carbody and the outer race of the swing bearing (C). Position dial indicator (B) between the carbody and the outer race of the swing bearing (C). Note: Position the dial indicators at the front center of the carbody and at the rear center of the carbody.
Illustration 2 g02173683
Position the machine as shown in Illustration 2.
Adjust both dial indicators to "zero".
Illustration 3 g02173685
Position the machine as shown in Illustration 3. The angle between the ground and the track should be approximately 15 degrees.
Calculate the total distance of movement between dial indicator (A) and dial indicator (B). Record the total distance movement of in Table 1. Note: This measurement is one of three measurements of the vertical swing bearing movement to be used in Step 14.
Reposition the machine as shown in illustration 2.
Note the distance movement of both of the dial indicators. Calculate the difference for each dial indicator and the measurement at the zero point that was measured in Step 7. Note: The difference calculated for each dial indicator should be less than 0.05 mm ( 0.002 inch). A greater distance may indicate the dial indicator has moved out of the original zero position This greater distance also indicates that the measurement from Step 9 is not a valid measurement and additional vertical swing bearing movement measurements are necessary. Repeat Steps 6 through 11.
Remove the dial indicators. Rotate the upper structure three times in a clockwise direction. Rotate the upper structure three times in a counterclockwise direction.
Repeat Steps 5 through 12 three times.
Calculate the average of the values that were recorded in Step 9. Compare this average to the service limit specifications are shown in Table 1. Procedure To Measure Circular Movement Of The Swing Bearing
Place the machine on level ground.
Empty the bucket.
Illustration 4 g02173688
(E) 1000 mm (39.4 inch)
Position the upper structure parallel to the tracks. Refer to Illustration 4 for the correct position of the boom, of the stick, and of the bucket.
Stop the engine.
Illustration 5 g00740365
(A) Dial indicator
(C) Outer race
Caterpillar parts catalog:
Parts harness Caterpillar catalog:
1373567
HARNESS AS-MONITOR
950G, 962G, 980G, R1300, R1300G, R1300G II, R1600, R1600G, R1600H, R1700G, R2900G, R3000H
950G, 962G, 980G, R1300, R1300G, R1300G II, R1600, R1600G, R1600H, R1700G, R2900G, R3000H
2290385
HARNESS AS-SWITCH
AD30, AD45, AD45B, AD55, AD55B, AD60, AE40 II, R1300, R1300G, R1300G II, R1600, R1600G, R1600H, R1700G, R2900G, R3000H
AD30, AD45, AD45B, AD55, AD55B, AD60, AE40 II, R1300, R1300G, R1300G II, R1600, R1600G, R1600H, R1700G, R2900G, R3000H
2197461
HARNESS ASSEMBLY-ENGINE
14M, 16M, 345C, 345C L, 345C MH, 345D, 345D L, 345D L VG, 349D, 349D L, 725, 730, 966H, 972H, 980C, C11, C13, CX31-C13I, D8N, R1700G, RM-300, TH35-C11I, TH35-C13I, W345C MH
14M, 16M, 345C, 345C L, 345C MH, 345D, 345D L, 345D L VG, 349D, 349D L, 725, 730, 966H, 972H, 980C, C11, C13, CX31-C13I, D8N, R1700G, RM-300, TH35-C11I, TH35-C13I, W345C MH
2573762
HARNESS AS-SWITCH
AD30, AD45, AD45B, AD55, AD55B, AD60, AE40 II, R1300G, R1300G II, R1600G, R1600H, R1700G, R2900G, R3000H
AD30, AD45, AD45B, AD55, AD55B, AD60, AE40 II, R1300G, R1300G II, R1600G, R1600H, R1700G, R2900G, R3000H
1046727
HARNESS AS-TRANSMISSION
950F, 950F II, 960F, 966F, 966F II, 970F, 980F, 980F II, 988F, 988F II, R1300, R1300G, R1600G, R1600H, R1700G, R2900, R2900G, R3000H
950F, 950F II, 960F, 966F, 966F II, 970F, 980F, 980F II, 988F, 988F II, R1300, R1300G, R1600G, R1600H, R1700G, R2900, R2900G, R3000H
1596180
HARNESS-CARRY
R1300, R1300G, R1300G II, R1600, R1600G, R1700 II, R1700G, R2900, R2900G
R1300, R1300G, R1300G II, R1600, R1600G, R1700 II, R1700G, R2900, R2900G
3430127
HARNESS AS-ENGINE
R1700G
R1700G
2901942
HARNESS AS-LIGHTING
R1700G
R1700G
3430128
HARNESS AS-LIGHTING
R1700G
R1700G
2904219
HARNESS AS-PANEL
R1700G
R1700G
2168028
HARNESS AS-SOLENOID
R1600, R1600G, R1700G
R1600, R1600G, R1700G
2961943
HARNESS AS-VALVE
R1700G
R1700G
2170274
HARNESS AS-ENGINE
R1700G
R1700G
2690322
HARNESS-CAB PT B
R1700G
R1700G
3088213
HARNESS-CAB PT B
R1700G
R1700G
2242826
HARNESS
AD45, AE40 II, R1300, R1600, R1600G, R1700G, R2900
AD45, AE40 II, R1300, R1600, R1600G, R1700G, R2900
2170280
HARNESS AS-CAB
R1700G
R1700G
2917950
HARNESS-FRONT FRAME
R1700G
R1700G
2589030
HARNESS-FRONT FRAME
R1700G
R1700G
2170269
HARNESS-FRONT FRAME
R1700G
R1700G
2589023
HARNESS AS-ENGINE
R1700G
R1700G