4Y0401 HOSE ASSEM. Caterpillar parts
966D
Rating:
Alternative (cross code) number:
CA4Y0401
4Y-0401
4Y0401
CA4Y0401
4Y-0401
4Y0401
Weight: 3 pounds 1 kg.
WHEEL LOADER,
Compatible equipment models: 4Y0401:
Information:
Illustration 4 g03540963With the screed still raised, move the extenders out to the specified paving width. Each extender has a scale which shows how far the extender is moved out from the main screed.Good paving practice requires the balance of the extender width so that the forces against each extender are equalized. Move the left and right extenders out an equal amount.Step 4
Step four is setting the main screed crown to the specifications of the job.Use the crown indicator scale located in the center of the screed to set the crown. Before using the indicator scale, be sure that the indicator scale is properly calibrated to the screed.Step 5
Step five is setting the height of the extenders.
Illustration 5 g03540957
Extender height gauge
You want to set the height of the extenders so the extenders match the height of the front of main screed. When the extender height is right, there are no transition marks in the mat.Again, make sure that the height indicators have been calibrated to the extenders.Note: The factory default zero setting will have the extender back edge 4 mm (0.16 inch) above the main screed and 6 mm (0.24 inch) above the main screed for the front edge.Step 6
Step six is positioning the starter boards under the screed.
Illustration 6 g02175642Select starter boards whose thickness matches the mat depth and the rate of compaction. Normally, the mat will compact about 6 mm (0.25 inch) per 25 mm (1 inch) of mat depth. For example, to get a 50.8 mm (2 inch) compacted mat, use starter boards which are 63.4 mm (2.5 inch) thick.Use two boards. Position the boards so that both the main screed and the screed extender are supported from front to back. The normal length is between 1 m (3 ft) to 1.2 m (4 ft).Step 7
Step seven removes the slack from the tow point.
Illustration 7 g03540982Remove the slack from the tow point. Move the machine forward until the tow arm roller contacts the tow point frame.Step 8
Step 8 is adjusting the thickness screws.
Illustration 8 g03540997Thickness screws on both sides of the screed need to be adjusted to establish the main screed angle of attack. When laying down mats up to 15 cm (6 inch) thick, adjust both the screws so the indicator is aligned with zero on the thickness control scale. When the thickness screws are set at zero and the tow point height is set about 4 cm (1.57 inch) above mat thickness, the main screed angle of attack will be approximately 10 mm. When laying mats that are between 15 cm (6 inch) and 30 cm (12 inch), adjust the screws to move the indicator progressively farther into the plus range. Increasing the thickness screw setting increases the main screed angle of attack. The thickness screw must be at near maximum setting for mats 20 cm (8 inch) thick or thicker.Refer to Operation and Maintenance Manual, "Thickness Control Screw Adjustment" for more information.Step 9
Step nine is positioning the end gates.
Illustration 9 g03541018
End gate
End gates on both ends of the
Caterpillar parts catalog:
Parts hose Caterpillar catalog:
5P0180
HOSE 157.48 cm(62 in.)
120G, 12F, 12G, 130G, 140, 140G, 141, 14E, 14G, 153, 16, 16G, 173B, 183B, 193, 215, 225, 235, 245, 518, 528, 528B, 561C, 561D, 571G, 572G, 58, 583K, 594H, 5S, 621, 621B, 623B, 627, 627B, 631C, 633, 63...
120G, 12F, 12G, 130G, 140, 140G, 141, 14E, 14G, 153, 16, 16G, 173B, 183B, 193, 215, 225, 235, 245, 518, 528, 528B, 561C, 561D, 571G, 572G, 58, 583K, 594H, 5S, 621, 621B, 623B, 627, 627B, 631C, 633, 63...
4V7700
HOSE AS
936, 966D, 966F, 966F II, 970F, G936
936, 966D, 966F, 966F II, 970F, G936
9C8605
HOSE AS
950F II, 966D, 966F, 980C, 980F, 980F II
950F II, 966D, 966F, 980C, 980F, 980F II
5V1846
HOSE AS
814B, 815B, 816B, 966D, 966F, 966F II, 970F
814B, 815B, 816B, 966D, 966F, 966F II, 970F
9C2361
HOSE AS
320 L, 814F, 815F, 816F, 950F, 966D, 966F, 966F II, 970F
320 L, 814F, 815F, 816F, 950F, 966D, 966F, 966F II, 970F
4V7472
HOSE AS
966D, 966F, 966F II, 970F
966D, 966F, 966F II, 970F
9C2359
HOSE AS
966D, 966F
966D, 966F
9C2360
HOSE AS
966D, 966F, 966F II, 970F
966D, 966F, 966F II, 970F
9C2364
HOSE AS
966D, 966F
966D, 966F
9C2632
HOSE AS
966D, 966F
966D, 966F
9C2631
HOSE AS
320B, 322B LN, 966D, 966F
320B, 322B LN, 966D, 966F
9C2635
HOSE AS
950F II, 966D, 966F
950F II, 966D, 966F
4Y0402
HOSE ASSEM.
966D
966D
3Y6567
HOSE ASSEM.
980C
980C
3Y6568
HOSE ASSEM.
980C
980C
9V1877
HOSE ASSEM.
980C
980C
4Y0497
HOSE ASSEM.
980C
980C
4Y0478
HOSE ASSEM.
980C
980C
4Y7856
HOSE ASSEM.
950F
950F
4Y8167
HOSE ASSEM.
950F
950F
4Y4335
HOSE ASSEM.
966F
966F
4Y2662
HOSE ASSEM.
950B
950B
4Y2663
HOSE ASSEM.
950B
950B
4Y2349
HOSE ASSEM.
950B, 950F
950B, 950F