AVSPARE.COM
parts catalog

HOSE 5351776 - Caterpillar


5351776 HOSE Caterpillar parts
Rating:
21
Alternative (cross code) number:
CA5351776
535-1776
5351776
Caterpillar 5351776 HOSE
Weight: 0.82 pounds 0 kg.

Buy HOSE 5351776 Caterpillar genuine, new aftermarket tractor parts with delivery

Compare Prices: .

As an associate, we earn commssions on qualifying purchases through the links below
$37.98

04 Apr 2025
1.0[0.45] Pounds
US: EXPRESSDEALS2
Omix-Ada | 17208.04 | Speedometer Cable, Auto Transmission | OE Reference: 5351776 | Fits 1976-1979 Jeep CJ5 / CJ7
Omix-Ada Jeep Speedometer Cable: This replacement speedometer cable fits 1976-1979 CJ5 and CJ7 models equipped with an Automatic transmission || Direct Replacement: It measures 69" in length and comes complete with threaded collars on both ends and a firewall grommet || Replaces Factory Part: OE 5351776 || OMIX Jeep Replaces Factory Parts: OMIX proudly offers all the parts you need to keep your Jeep running like new with quality standards that always meet or exceed those of the factory part
$35.98
 

27 Oct 2023
0.875[0.39] Pounds
Amazon.com
Omix-Ada | 17208.04 | Speedometer Cable, Auto Transmission | OE Reference: 5351776 | Fits 1976-1979 Jeep CJ5 / CJ7
Omix-Ada Jeep Speedometer Cable: This replacement speedometer cable fits 1976-1979 CJ5 and CJ7 models equipped with an Automatic transmission || Direct Replacement: It measures 69" in length and comes complete with threaded collars on both ends and a firewall grommet || Replaces Factory Part: OE 5351776 || OMIX Jeep Replaces Factory Parts: OMIX proudly offers all the parts you need to keep your Jeep running like new with quality standards that always meet or exceed those of the factory part
  For full view, you need register

Information:

20. Put link (13) and bushing (12) in position in tooling (C) as shown. Make sure the flat area or bolster (15) [part of tooling (C)] is against the flat area of the link. Remove bushing (12) from link (13). 21. Remove seals (16) from the links.Assemble Track
Check all parts of the track assembly for wear or damage. Make replacements if necessary. Make sure all parts are clean and dry before assembly.
The seal assembly must be completely sealed in the link counterbore. The load ring of the seal assembly must make a minimum amount of contact with oil. Oil causes the load ring to expand. This is not desired until after assembly.
1. Use tool (D) to install the seal assembly (the seal and load ring) in the links as shown in illustration A82927P1.
Make sure there is contact at area (X) between the seal and load ring.
Use a maximum force of 1080 kN (242,000 lb). When the track is assembled.
Typical Example2. Put SAE 90W gear oil on each end of bushing (12) for a minimum length of 6.5 mm (.256 in).
Make sure there is clearance between link (13) and bolster (15) [part of tooling (A)]. Install the 5P9688 Receiver (4) [part of tooling (A)] with the small outside diameter (step) toward bolster (15) [part of tooling (A)].
3. Make an alignment of the counterbore in 5P9688 Receiver (4) [part of tooling (A)] with bushing (12). Use tooling (A) and install bushing (12) in link (13) until the bushing makes contact with the bottom of the counterbore in the 5P9688 Receiver. The bushing must extend 1.70 0.13 mm (.067 .005 in) above the surface of the link.
Make sure there is clearance between link (11) and bolster (5) [part of tooling (A)]. Install the 5P9688 Receiver (4) [part of tooling (A)] with the small outside diameter (step) toward bolster (15) [part of tooling (A)].
4. Put link (11), bushing (12) and link (13) in position in tooling (A) as shown. Install tooling (E) for alignment purposes. The surface of the link with the bolt holes in it must be against the arm of tool (A) as shown in the illustration.5. Make an alignment of the counterbore in 5P9688 Receiver (4) [part of tooling (A)] with bushing (12). Use tooling (A) and install bushing (12) in link (11) until the bushing makes contact with the bottom of the counterbore in the 5P9688 Receiver. The bushing must extend 1.70 0.13 mm (.067 .005 in) above the surface of the link.
Typical Example6. Install tooling (B) between the links.7. Put 5P3931 Anti-Seize Compound only on the surface of the thrust washers that make contact with the bushing. Install thrust washers (14).
Typical Example8. Fasten a hoist and put links (11), (13) and bushing (12) in position. Use tooling (B) as needed to put the links and bushing in place. Install tool (F) for alignment of the links, bushings and thrust rings. 9. Put oil on the stopper and install it in pin (10) with


Parts hose Caterpillar catalog:

Back to top
The names Cat, Caterpillar, John Deere, Komatsu, Volvo, Hitachi, Doosan, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
AVSpare.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only. Cat® and Caterpillar® are registered trademarks of Caterpillar, Inc.