AVSPARE.COM
parts catalog

INJECTOR GP-FUEL 1913003 - Caterpillar


1913003 INJECTOR GP-FUEL Caterpillar parts 3406E, C-15, C-16
Rating:
46
Alternative (cross code) number:
CA1913003
191-3003
1913003
Caterpillar 1913003 INJECTOR GP-FUEL
Weight: 5 pounds 2 kg.

Buy INJECTOR GP-FUEL 1913003 Caterpillar genuine, new aftermarket tractor parts with delivery
TRUCK ENGINE,

Related part:
1913003  INJECTOR GP-FUEL  0R9257  R

Cross Reference:

CATERPILLAR 102-2014, 103-4562, 10R0957, 10R2781, 10R8501, 117-0482, 118-8010, 118-9030, 140-8993, 159-2479, 191-3003, 211-3023, OR4119, OR4300, OR4331, OR4894, OR9257, DELPHI EX630957,

Compare Prices: .

As an associate, we earn commssions on qualifying purchases through the links below
$1,030.32

25 Jul 2025
0.1102[0.05] pounds
CN: zhangchuanzhi
1PC 191-3003 1913003 TYSTABPC
TYSTABPC
$708.44

25 Jul 2025

US: QUALITY PARTS
1913003 Injector (REMAN) 6 Month Ltd. Warranty - G&T Engine Parts
G&T Engine Parts Part Number: 1913003 || Application: Engine 18 || Quality: 100% Tested Before Shipping to Ensure Product Quality || Ltd. Warranty: 6 months || Items are sold by part number only. Picture is for illustration purposes and the part or parts may be different in color or quantity. Use of any OEM manufacturer name is not intended to represent any relationship between the two companies, instead it indicates that we sell replacement parts that are compatible with OEM components.
$1,030.32

25 Jul 2025
0.1102[0.05] pounds
CN: chengliangazaz
1PC 191-3003 1913003
VNPOTTIQ
Number on catalog scheme: 4
  For full view, you need register

Compatible equipment models: 1913003:

TRUCK ENGINE  3406E   C-15   C-16   Caterpillar

Information:

Remove And Install Fuel Ratio Control
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Disconnect pressure line (3). Remove two bolts (2).2. Move fuel ratio control (1) up to disengage the fuel ratio control from the lever assembly in the governor. 3. Remove four O-ring seals (4) and screen assembly (5). The following steps are to install the fuel ratio control.4. Inspect, replace and install the four O-ring seals (4) and the screen assembly (5).5. Put the fuel ratio control (1) in position and engage the fuel ratio control with the lever assembly in the governor.6. Install the bolts that hold the fuel ratio control and connect pressure line (3) to the fuel ratio control (1). See Testing And Adjusting for Fuel Ratio Control Adjustment procedure.Disassemble And Assemble Fuel Ratio Control
Start By:a. remove fuel ratio control
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Remove the two bolts, and the fuel ratio control. Remove O-ring seal (1). 2. Put tooling (A) in a vise as shown so that the station being used is not over the vise jaw. Place the fuel ratio control over the pins in tooling (A). Remove cover (2) and the gasket.
There is spring force behind cover (3). Hold cover (3) in position, and slowly remove the bolts that hold it to release the spring force.
3. Remove cover (3). 4. Remove nut (5) and stop (6). 5. Remove spring (9), washer (7), and diaphragm (10) from retainer (8). Remove retainer (8) from housing (11). 6. Remove nut (16) from extension (15), and remove the extension from retainer (8). Remove valve (12), spring (13) and O-ring seal (14). 7. Remove spring (18), retainer (17) and spring (19). 8. Remove piston assembly (20). 9. Use tooling (B), and remove snap ring (21) and the wave washers from valve assembly (22). Remove piston assembly (23). Remove seal (24). 10. If necessary, remove stem (26) from valve (25).11. Clean and inspect all parts. Make a replacement of all parts that are worn or damaged. The following steps are to assemble the fuel ratio control.12. Assemble stem (26) to valve (25) using 9S3265 Retaining Compound.13. Put seal (24) on piston (23). Install piston (23) on valve assembly (22).14. Put two wave washers in position on valve (22). Use tooling (B) to install the snap ring on the valve assembly.15. Place housing (4) on tooling (A), and put tooling (C) into the bore of the housing. Lubricate tooling (C) with clean engine oil.16. Put a small amount of clean oil on the seal of the piston assembly, and push piston assembly (23) into position with a smooth swift motion.17. Place spring (9), retainer (17) and spring (19) in position in housing (4).18. Put O-ring seal (14) on extension (15). Put spring (13) and valve (12) in position on the extension.19. Lubricate O-ring seal (14) with clean engine oil. Install extension (15)

Caterpillar parts catalog:

Caterpillar parts catalog
3406E Truck Engine 2WS00001-UP
3406E Truck Engine 1LW00001-UP
3406E Truck Engine 1MM00001-UP
C-15 Truck Engine 6NZ00001-UP
C-16 Truck Engine 7CZ00001-UP


Parts injector Caterpillar catalog:

2123462 INJECTOR GP-FUEL
345B, 345B L, C-10
Back to top
The names Cat, Caterpillar, John Deere, Komatsu, Volvo, Hitachi, Doosan, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
AVSpare.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only. Cat® and Caterpillar® are registered trademarks of Caterpillar, Inc.