3805719 JACK-HYDRAULIC Caterpillar parts
Rating:
Alternative (cross code) number:
CA3805719
380-5719
3805719
CA3805719
380-5719
3805719
Weight: 60 pounds 27 kg.
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
D&D PowerDrive 3805719 Cummins Engine Replacement Belt, Rubber
D&D PowerDrive Belt Poly K 99.75in OC 6 Rib || Material type: rubber || Manufactured by D&D PowerDrive || Package weight: 0.61 lbs
D&D PowerDrive Belt Poly K 99.75in OC 6 Rib || Material type: rubber || Manufactured by D&D PowerDrive || Package weight: 0.61 lbs
3805719 Replacement Belt for Cummins Engine Drive Belt
GIVLETICS -✅ RELIABLE PERFORMANCE: 3805719 replacement belts are versatile. USA-made for quality and longevity. || -✅ Do not let your machinery come to a stop because of a belt that has become worn out. Repair your worn-out belt with our High-Performance Belt. Its high resistance to wear and strain makes it last longer and work better. || -✅ DURABLE MATERIAL: Made of durable, high-quality fabrics. Perfect for harsh settings and heavy-duty uses. || -✅ EASY TO USE: Drive belt is easy to install and maintain, with a unique feature that ensures proper alignment and tension. || -✅ The 3805719 belt is the most reliable and efficient. This belt transmits power smoothly and efficiently due to its careful construction and resistance to wear and tear, making it an ideal substitute for a damaged belt.
GIVLETICS -✅ RELIABLE PERFORMANCE: 3805719 replacement belts are versatile. USA-made for quality and longevity. || -✅ Do not let your machinery come to a stop because of a belt that has become worn out. Repair your worn-out belt with our High-Performance Belt. Its high resistance to wear and strain makes it last longer and work better. || -✅ DURABLE MATERIAL: Made of durable, high-quality fabrics. Perfect for harsh settings and heavy-duty uses. || -✅ EASY TO USE: Drive belt is easy to install and maintain, with a unique feature that ensures proper alignment and tension. || -✅ The 3805719 belt is the most reliable and efficient. This belt transmits power smoothly and efficiently due to its careful construction and resistance to wear and tear, making it an ideal substitute for a damaged belt.
Information:
Pickling
Note: The piping must be flushed with water before pickling. The Engine and the auxiliary equipment MUST be isolated from the pickling process. Only the piping that was fabricated in the field should be pickled.
Add acid to the water at normal room temperature. Do not add water to the acid. Add neutralizing agents to the water. Do not add water to the neutralizing agents. There are many safety precautions when handling acid. Therefore, this should only be done by qualified personnel.
Fill the tank with the hydrochloric acid pickling solution. See the ""Instructions For Pickling"" section of this Special Instruction.
Open the isolation valves.
Start the pump and begin heating the pickling medium. After the pickling solution reaches a temperature of 40 to 50 °C (104 to 122 °F), begin timing the pickling process.
Monitor the dissolved iron content. The level of the dissolved iron content should not exceed 10% in the hydrochloric acid pickling solution or 6% in the sulfuric acid pickling solution.
The piping should be pickled for 5 hours. Check the piping after every hour. Ensure that iron is not excessively removed from the piping.
Stop the pump. Isolate the flushing tank.
Drain the flushing tank.
Clean the flushing tank.
Open the vents and the drains in the piping.
Drain the piping.Note: The pickling solution must be disposed of in accordance with the local laws and regulations.
Close the vents and drains.Neutralizing
Add acid to the water at normal room temperature. Do not add water to the acid. Add neutralizing agents to the water. Do not add water to the neutralizing agents. There are many safety precautions when handling acid. Therefore, this should only be done by qualified personnel.
Fill the flushing tank with the neutralizing solution. See the ""Instructions For Pickling"" section of this Special Instruction.
Open the isolation valves on the flushing tank.
Start the pump. Monitor the neutralizing solution. Keep the pH ≥ 6.5 by adding the neutralizing solution. If checking the pH is not possible, fill the tank, and circulate the solution through the piping. Drain the piping three times. Pass the total volume of the system through the piping five times or pass the volume for 30 minutes. Perform this operation for the greater amount of time, before you change the solution.
Circulate the neutralizing solution until the pH ≥ 6.5 for a 30 minute period without adding more solution.
Stop the pump. Isolate the flushing tank.
Drain the flushing tank.
Clean the flushing tank.
Open the vents and drains in the piping.
Drain the piping.
Blow out the piping with compressed air.
Close the vents and drains. Begin at the pressure air source.
Disconnect the compressed air.
Visually inspect the pipe at several different locations in order to ensure that the mill scale has been removed. If the mill scale has not been removed, the pickling procedure must be repeated.Final Flushing
Note: All of the piping with the mill scale must be pickled before flushing.
Bypass the Engine and the auxiliary equipment. All of the piping that was fabricated in the field must be flushed.
Flushing can be performed with water or flushing oil.
Fill the system with
Note: The piping must be flushed with water before pickling. The Engine and the auxiliary equipment MUST be isolated from the pickling process. Only the piping that was fabricated in the field should be pickled.
Add acid to the water at normal room temperature. Do not add water to the acid. Add neutralizing agents to the water. Do not add water to the neutralizing agents. There are many safety precautions when handling acid. Therefore, this should only be done by qualified personnel.
Fill the tank with the hydrochloric acid pickling solution. See the ""Instructions For Pickling"" section of this Special Instruction.
Open the isolation valves.
Start the pump and begin heating the pickling medium. After the pickling solution reaches a temperature of 40 to 50 °C (104 to 122 °F), begin timing the pickling process.
Monitor the dissolved iron content. The level of the dissolved iron content should not exceed 10% in the hydrochloric acid pickling solution or 6% in the sulfuric acid pickling solution.
The piping should be pickled for 5 hours. Check the piping after every hour. Ensure that iron is not excessively removed from the piping.
Stop the pump. Isolate the flushing tank.
Drain the flushing tank.
Clean the flushing tank.
Open the vents and the drains in the piping.
Drain the piping.Note: The pickling solution must be disposed of in accordance with the local laws and regulations.
Close the vents and drains.Neutralizing
Add acid to the water at normal room temperature. Do not add water to the acid. Add neutralizing agents to the water. Do not add water to the neutralizing agents. There are many safety precautions when handling acid. Therefore, this should only be done by qualified personnel.
Fill the flushing tank with the neutralizing solution. See the ""Instructions For Pickling"" section of this Special Instruction.
Open the isolation valves on the flushing tank.
Start the pump. Monitor the neutralizing solution. Keep the pH ≥ 6.5 by adding the neutralizing solution. If checking the pH is not possible, fill the tank, and circulate the solution through the piping. Drain the piping three times. Pass the total volume of the system through the piping five times or pass the volume for 30 minutes. Perform this operation for the greater amount of time, before you change the solution.
Circulate the neutralizing solution until the pH ≥ 6.5 for a 30 minute period without adding more solution.
Stop the pump. Isolate the flushing tank.
Drain the flushing tank.
Clean the flushing tank.
Open the vents and drains in the piping.
Drain the piping.
Blow out the piping with compressed air.
Close the vents and drains. Begin at the pressure air source.
Disconnect the compressed air.
Visually inspect the pipe at several different locations in order to ensure that the mill scale has been removed. If the mill scale has not been removed, the pickling procedure must be repeated.Final Flushing
Note: All of the piping with the mill scale must be pickled before flushing.
Bypass the Engine and the auxiliary equipment. All of the piping that was fabricated in the field must be flushed.
Flushing can be performed with water or flushing oil.
Fill the system with
Parts jack Caterpillar catalog:
3441311
JACK AS
Caterpillar
Caterpillar
2S6023
JACK
Caterpillar
Caterpillar
2I9797
JACK
Caterpillar
Caterpillar
2I2750
JACK STAND
Caterpillar
Caterpillar
2B9886
JACK
Caterpillar
Caterpillar
2750066
JACK-SCREW
Caterpillar
Caterpillar
4404777
JACK AS-HYD
Caterpillar
Caterpillar
4395578
JACK AS-HYD
Caterpillar
Caterpillar
4395577
JACK AS-HYD
Caterpillar
Caterpillar
4395576
JACK AS-HYD
Caterpillar
Caterpillar
4395575
JACK AS. HYD
Caterpillar
Caterpillar
4388863
JACK GP-HYD
Caterpillar
Caterpillar