1W9197 LINE AS-FUEL INJ Caterpillar parts
D399
Rating:
Alternative (cross code) number:
CA1W9197
1W-9197
1W9197
CA1W9197
1W-9197
1W9197
Weight: 0.80 pounds 0 kg.
GEN SET ENGINE, INDUSTRIAL ENGINE,
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
CTP 1W9197 Fuel Line Assembly for Engine Model D399
CTP Premium quality cold drawn seamless carbon steel tubing || Cold drawn process Increases strength allowing for 20% higher working pressures || Superior surface finish, connections are treated to prevent oxidation || CNC manufacturing process ensures precision and quality || Dimensional accuracy and excellent micro-structure uniformity
CTP Premium quality cold drawn seamless carbon steel tubing || Cold drawn process Increases strength allowing for 20% higher working pressures || Superior surface finish, connections are treated to prevent oxidation || CNC manufacturing process ensures precision and quality || Dimensional accuracy and excellent micro-structure uniformity
CTP 1W9197 Fuel Line Assembly for Engine Model D399
CTP Premium quality cold drawn seamless carbon steel tubing || Cold drawn process Increases strength allowing for 20% higher working pressures || Superior surface finish, connections are treated to prevent oxidation || CNC manufacturing process ensures precision and quality || Dimensional accuracy and excellent micro-structure uniformity
CTP Premium quality cold drawn seamless carbon steel tubing || Cold drawn process Increases strength allowing for 20% higher working pressures || Superior surface finish, connections are treated to prevent oxidation || CNC manufacturing process ensures precision and quality || Dimensional accuracy and excellent micro-structure uniformity
CTP 1W9197 Fuel Line Assembly for Engine Model D399
CTP Premium quality cold drawn seamless carbon steel tubing || Cold drawn process Increases strength allowing for 20% higher working pressures || Superior surface finish, connections are treated to prevent oxidation || CNC manufacturing process ensures precision and quality || Dimensional accuracy and excellent micro-structure uniformity
CTP Premium quality cold drawn seamless carbon steel tubing || Cold drawn process Increases strength allowing for 20% higher working pressures || Superior surface finish, connections are treated to prevent oxidation || CNC manufacturing process ensures precision and quality || Dimensional accuracy and excellent micro-structure uniformity
Compatible equipment models: 1W9197:
Information:
Generator SetXQP150 (S/N: PJ71-105,107-107,109-112)Introduction
Do not perform any procedure in this Special Instruction until you have read the information and you understand the information.There have been some instances of the neutral earth cable assembly not being installed in certain C7.1 Generator Set.Safety Section
When servicing or repairing electric power generation equipment:Make sure the unit is off-line (disconnected from utility and/or other generators power service), and either locked out or tagged DO NOT OPERATE. Remove all fuses.
Required Parts
A 494-6855 Cable As is required.Removal Procedure
Turn the battery disconnect switch to the OFF position.
Support the generator terminal box lid. Remove the four bolts that secure the generator terminal box lid. Remove the generator terminal box lid.Installation Procedure
Illustration 1 g06135748
Typical example
Position neutral earth cable assembly (1) to the generator set. Route neutral earth cable assembly away from sharp edges or other components. Refer to illustration 1.
Illustration 2 g06135768
Typical example
Remove M10 flange head nut (2) on the star point of the alternator connection terminal block (3). Position the terminal connection of the neutral earth cable assembly (1) onto the terminal block stud.
Install M10 flange head nut (2) onto the terminal block stud. Tighten the nut hand tight.Note: Ensure that the neutral earth cable assembly is routed away from sharp edges or other components.
Illustration 3 g06135770
Typical example
If necessary, remove nut (4) and washer (not shown) from earth terminal (5) in the circuit breaker box. Position the terminal connection of the neutral earth cable assembly (1) to earth terminal (5). Install washer (not shown) and nut (4) to earth terminal (5). Tighten the nut hand tight.Note: Ensure that the neutral earth cable assembly is routed away from sharp edges or other components.
Tighten nut (2) to a torque of 20 N m (177 lb in). Tighten nut (4) to a torque of 30 N m (266 lb in). Ensure that the route of the neutral earth cable assembly is correct when the nuts are tightened.
Position the generator terminal box lid to the generator set. Install the four bolts that secure the generator terminal box lid. Tighten the bolts to a torque of 12 N m (106 lb in).
Turn the battery disconnect switch to the ON position.
Do not perform any procedure in this Special Instruction until you have read the information and you understand the information.There have been some instances of the neutral earth cable assembly not being installed in certain C7.1 Generator Set.Safety Section
When servicing or repairing electric power generation equipment:Make sure the unit is off-line (disconnected from utility and/or other generators power service), and either locked out or tagged DO NOT OPERATE. Remove all fuses.
Required Parts
A 494-6855 Cable As is required.Removal Procedure
Turn the battery disconnect switch to the OFF position.
Support the generator terminal box lid. Remove the four bolts that secure the generator terminal box lid. Remove the generator terminal box lid.Installation Procedure
Illustration 1 g06135748
Typical example
Position neutral earth cable assembly (1) to the generator set. Route neutral earth cable assembly away from sharp edges or other components. Refer to illustration 1.
Illustration 2 g06135768
Typical example
Remove M10 flange head nut (2) on the star point of the alternator connection terminal block (3). Position the terminal connection of the neutral earth cable assembly (1) onto the terminal block stud.
Install M10 flange head nut (2) onto the terminal block stud. Tighten the nut hand tight.Note: Ensure that the neutral earth cable assembly is routed away from sharp edges or other components.
Illustration 3 g06135770
Typical example
If necessary, remove nut (4) and washer (not shown) from earth terminal (5) in the circuit breaker box. Position the terminal connection of the neutral earth cable assembly (1) to earth terminal (5). Install washer (not shown) and nut (4) to earth terminal (5). Tighten the nut hand tight.Note: Ensure that the neutral earth cable assembly is routed away from sharp edges or other components.
Tighten nut (2) to a torque of 20 N m (177 lb in). Tighten nut (4) to a torque of 30 N m (266 lb in). Ensure that the route of the neutral earth cable assembly is correct when the nuts are tightened.
Position the generator terminal box lid to the generator set. Install the four bolts that secure the generator terminal box lid. Tighten the bolts to a torque of 12 N m (106 lb in).
Turn the battery disconnect switch to the ON position.
Caterpillar parts catalog:
Parts line Caterpillar catalog:
9N5319
LINE AS.
245, 3406, 621
245, 3406, 621