2S5960 LINK (LEFT HAND) Caterpillar parts
561B, 951B, 955C, 955H
Rating:
Alternative (cross code) number:
CA2S5960
2S-5960
2S5960
CA2S5960
2S-5960
2S5960
Weight: 7 pounds 3 kg.
PIPELAYER, TRACK LOADER,
Information:
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 9S-9082 Engine Turning Tool 1 Start By:
Remove the piston cooling jets.
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Check the connecting rod and the connecting rod bearing caps for identification and the orientation on the crankshaft.
Use Tooling (A) to turn the flywheel in order to access the connecting rod cap that will be removed.
Illustration 1 g00786899
Remove nuts (1) and connecting rod bearing cap (2) from the connecting rod.
Push the connecting rod away from the crankshaft and remove the upper half of the connecting rod bearing.
Illustration 2 g00568856
Remove lower half (1) of the connecting rod bearing from connecting rod cap (2).Installation Procedure
Table 2
Required Tools
Tool Part Number Part Description Qty
B - Plastigage -
C - LOCTITE Graphite-50 Antiseize - Note: Install the connecting rod bearings dry when clearance checks are performed. Apply clean engine oil on the connecting rod bearings for final assembly.Note: Refer to Special Publication, "Engine Bearings and Crankshafts" for complete details concerning measuring of connecting rod bearing clearances.
Illustration 3 g03333216
Install a new lower half connecting rod bearing (1) in connecting rod bearing cap (2).
Install a new upper half connecting rod bearing in the connecting rod.
Illustration 4 g00568856
Pull the connecting rod on the crankshaft.
Use Tooling (B) to check the connecting rod bearing clearances. Follow Steps 5 and 6 for the correct installation procedures and tightening procedures for the connecting rod bearing caps when the clearance check is performed. Refer to Disassembly and Assembly, "Bearing Clearance - Check".Bearing clearance (new bearings) ... 0.071 to 0.168 mm (0.0028 to 0.0066 inch)Maximum permissible bearing clearance (used bearings) ... 0.25 mm (0.010 inch)
Lubricate the threads of the connecting rod bolts and the seating faces of connecting rod bearing cap (2) with Tooling (C). Install connecting rod bearing cap (2) and nuts (3). Ensure that the number on the side of the connecting rod bearing cap is on the same side as the number on the connecting rod.
Tighten nuts (3), as follows:
Tighten the nuts to a torque of 82 8 N m (60 6 lb ft).
Put a mark on each nut and on each connecting rod bearing cap.
Tighten each nut for an additional 120 5 degrees.
Repeat Steps 1 through 6 in order to install the remainder of the connecting rods.End By:
Install the piston cooling jets. Refer to Disassembly and Assembly, "Piston Cooling Jets - Remove and Install".
Table 1
Required Tools
Tool Part Number Part Description Qty
A 9S-9082 Engine Turning Tool 1 Start By:
Remove the piston cooling jets.
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Check the connecting rod and the connecting rod bearing caps for identification and the orientation on the crankshaft.
Use Tooling (A) to turn the flywheel in order to access the connecting rod cap that will be removed.
Illustration 1 g00786899
Remove nuts (1) and connecting rod bearing cap (2) from the connecting rod.
Push the connecting rod away from the crankshaft and remove the upper half of the connecting rod bearing.
Illustration 2 g00568856
Remove lower half (1) of the connecting rod bearing from connecting rod cap (2).Installation Procedure
Table 2
Required Tools
Tool Part Number Part Description Qty
B - Plastigage -
C - LOCTITE Graphite-50 Antiseize - Note: Install the connecting rod bearings dry when clearance checks are performed. Apply clean engine oil on the connecting rod bearings for final assembly.Note: Refer to Special Publication, "Engine Bearings and Crankshafts" for complete details concerning measuring of connecting rod bearing clearances.
Illustration 3 g03333216
Install a new lower half connecting rod bearing (1) in connecting rod bearing cap (2).
Install a new upper half connecting rod bearing in the connecting rod.
Illustration 4 g00568856
Pull the connecting rod on the crankshaft.
Use Tooling (B) to check the connecting rod bearing clearances. Follow Steps 5 and 6 for the correct installation procedures and tightening procedures for the connecting rod bearing caps when the clearance check is performed. Refer to Disassembly and Assembly, "Bearing Clearance - Check".Bearing clearance (new bearings) ... 0.071 to 0.168 mm (0.0028 to 0.0066 inch)Maximum permissible bearing clearance (used bearings) ... 0.25 mm (0.010 inch)
Lubricate the threads of the connecting rod bolts and the seating faces of connecting rod bearing cap (2) with Tooling (C). Install connecting rod bearing cap (2) and nuts (3). Ensure that the number on the side of the connecting rod bearing cap is on the same side as the number on the connecting rod.
Tighten nuts (3), as follows:
Tighten the nuts to a torque of 82 8 N m (60 6 lb ft).
Put a mark on each nut and on each connecting rod bearing cap.
Tighten each nut for an additional 120 5 degrees.
Repeat Steps 1 through 6 in order to install the remainder of the connecting rods.End By:
Install the piston cooling jets. Refer to Disassembly and Assembly, "Piston Cooling Jets - Remove and Install".
Caterpillar parts catalog:
Parts link Caterpillar catalog:
3P5757
LINK AS
951B, D5B
951B, D5B
3P7153
LINK-TRACK-RH
225, 951B, 953, 955K, 955L, D5, D5B, D5E, FB221, OEMS
225, 951B, 953, 955K, 955L, D5, D5B, D5E, FB221, OEMS
3P7154
LINK-TRACK-LH
225, 951B, 953, 955K, 955L, D5, D5B, D5E, FB221, OEMS
225, 951B, 953, 955K, 955L, D5, D5B, D5E, FB221, OEMS
2H5048
LINK
561B, 561C, 955C, 977D, D4D, D4E, D4E SR, D5, D5B, D5E, D6C, D6D, D6E SR, D7F, D7G
561B, 561C, 955C, 977D, D4D, D4E, D4E SR, D5, D5B, D5E, D6C, D6D, D6E SR, D7F, D7G
2H5046
LINK
561B, 561C, 955C, 977D, D4D, D4E, D4E SR, D5, D5B, D5E, D6C, D6D, D6E SR, D7F, D7G
561B, 561C, 955C, 977D, D4D, D4E, D4E SR, D5, D5B, D5E, D6C, D6D, D6E SR, D7F, D7G
2S7579
LINK ASSEM.
561B, 951B, 955H
561B, 951B, 955H
4K3924
LINK
955C
955C
2S5959
LINK (RIGHT HAND)
561B, 951B, 955C, 955H
561B, 951B, 955C, 955H
2S7579
LINK ASSEM.
561B, 951B, 955H
561B, 951B, 955H
3K4725
LINK
941, 951B, 955H, D4D, D4E
941, 951B, 955H, D4D, D4E
3S9934
LINK
941, 951B, D4D
941, 951B, D4D
2M3094
LINK
561B, 561C, 561D
561B, 561C, 561D
5K9457
LINK
941, D4D
941, D4D
5K9458
LINK
941, D4D
941, D4D
9M0796
LINK
824, 955H, 955K, 977H, 977K, D4D
824, 955H, 955K, 977H, 977K, D4D
2S5961
LINK (MASTER) (RIGHT HAND)
561B, 951B, 955C, 955H
561B, 951B, 955C, 955H
2S5962
LINK (MASTER) (LEFT HAND)
561B, 951B, 955C, 955H
561B, 951B, 955C, 955H