1714553 OPERATOR AR Caterpillar parts
312B L
Rating:
Alternative (cross code) number:
CA1714553
171-4553
1714553
CA1714553
171-4553
1714553
EXCAVATOR,
Compatible equipment models: 1714553:
Information:
Test Preparation
Drive the machine to a smooth, horizontal surface.
Illustration 1 g03817180
Move propel lever (1) to the NEUTRAL position.
Move parking brake switch (2) to the ON position.
Move throttle switch (3) into the LOW-IDLE position.
If necessary, move ECO switch (4) to the OFF position.
Illustration 2 g03817182
If the machine is equipped with a leveling blade, use blade control pedal (5) to lower the blade to the ground.
Illustration 3 g03817185
After the engine has operated at low idle for 5 minutes, move engine start switch (6) to the OFF position.
Illustration 4 g06138861
Unhook latch (7) at the rear of the engine compartment and open engine hood (8).
Illustration 5 g06138868
Move hood support bracket (9) in order support engine hood (8).
Illustration 6 g06140510
Remove three bolts (10) and washers. Remove right side panel (11).
Illustration 7 g06140511
Remove three bolts (12) and washers. Remove left side panel (13).Adjustment Procedure
Illustration 8 g03821242
Shown from right side of machine
Loosen locknut (15) securing cable (14) to bracket (16).
Illustration 9 g03821251
Shown from right side of machine
Remove cotter pin (19) and clevis pin (17) from clevis (18)
Illustration 10 g03821145
Shown from left side of machine
Remove bolts (20) from rod ends (21).
Remove synchronization linkage (23).
Allow control levers (22) to center. The control levers should be parallel to each other.
Adjust length of synchronization linkage (23) so rod ends (21) align with control levers (22).Note: Do not change the position of control levers (22) when bolts (20) are installed in rod ends (21). The control levers should not move when the link is installed.
Move propel lever (1) to the NEUTRAL position.Note: A click should be felt or heard when propel lever (1) is moved into the NEUTRAL position.
Secure rod ends (21) to control levers (22) with bolts (20).
Illustration 11 g03821282
Shown from right side of machine
Align clevis (18) to control lever (22). The holes in the clevis should align with the hole in the control lever. If the holes do not align, readjust the clevis and cable.
Loosen locknut (24). Turn clevis (18) as necessary to align the holes.
Illustration 12 g03821293
Shown from right side of machine
If the holes in the clevis cannot be aligned with the hole in the control lever, adjust position of cable (14) with locknut (25). Tighten the locknut.
Install clevis pin (17). Do not install cotter pin (19) until all the adjustments have been completed and verified.
Tighten locknut (15) to secure cable (14).Note: When securing cable (14), the cable must not move clevis (18) or control lever (22) out of the NEUTRAL position.
Use a marker pen to make a mark on the cable next to the cable housing. Use the mark to measure the cable travel. Cable (14) should extend and retract an equal distance. The cable travel in each direction should be approximately 25.4 mm (1 inch).
Install cotter pin (19) in clevis pin (17).
Position left side panel (13). Secure with three bolts (12) and washers.
Position right side panel (11). Secure with three bolts (10) and washers.
Move hood support bracket (9) into the storage position.
Close engine hood (8) and secure latch (7).
Drive the machine to a smooth, horizontal surface.
Illustration 1 g03817180
Move propel lever (1) to the NEUTRAL position.
Move parking brake switch (2) to the ON position.
Move throttle switch (3) into the LOW-IDLE position.
If necessary, move ECO switch (4) to the OFF position.
Illustration 2 g03817182
If the machine is equipped with a leveling blade, use blade control pedal (5) to lower the blade to the ground.
Illustration 3 g03817185
After the engine has operated at low idle for 5 minutes, move engine start switch (6) to the OFF position.
Illustration 4 g06138861
Unhook latch (7) at the rear of the engine compartment and open engine hood (8).
Illustration 5 g06138868
Move hood support bracket (9) in order support engine hood (8).
Illustration 6 g06140510
Remove three bolts (10) and washers. Remove right side panel (11).
Illustration 7 g06140511
Remove three bolts (12) and washers. Remove left side panel (13).Adjustment Procedure
Illustration 8 g03821242
Shown from right side of machine
Loosen locknut (15) securing cable (14) to bracket (16).
Illustration 9 g03821251
Shown from right side of machine
Remove cotter pin (19) and clevis pin (17) from clevis (18)
Illustration 10 g03821145
Shown from left side of machine
Remove bolts (20) from rod ends (21).
Remove synchronization linkage (23).
Allow control levers (22) to center. The control levers should be parallel to each other.
Adjust length of synchronization linkage (23) so rod ends (21) align with control levers (22).Note: Do not change the position of control levers (22) when bolts (20) are installed in rod ends (21). The control levers should not move when the link is installed.
Move propel lever (1) to the NEUTRAL position.Note: A click should be felt or heard when propel lever (1) is moved into the NEUTRAL position.
Secure rod ends (21) to control levers (22) with bolts (20).
Illustration 11 g03821282
Shown from right side of machine
Align clevis (18) to control lever (22). The holes in the clevis should align with the hole in the control lever. If the holes do not align, readjust the clevis and cable.
Loosen locknut (24). Turn clevis (18) as necessary to align the holes.
Illustration 12 g03821293
Shown from right side of machine
If the holes in the clevis cannot be aligned with the hole in the control lever, adjust position of cable (14) with locknut (25). Tighten the locknut.
Install clevis pin (17). Do not install cotter pin (19) until all the adjustments have been completed and verified.
Tighten locknut (15) to secure cable (14).Note: When securing cable (14), the cable must not move clevis (18) or control lever (22) out of the NEUTRAL position.
Use a marker pen to make a mark on the cable next to the cable housing. Use the mark to measure the cable travel. Cable (14) should extend and retract an equal distance. The cable travel in each direction should be approximately 25.4 mm (1 inch).
Install cotter pin (19) in clevis pin (17).
Position left side panel (13). Secure with three bolts (12) and washers.
Position right side panel (11). Secure with three bolts (10) and washers.
Move hood support bracket (9) into the storage position.
Close engine hood (8) and secure latch (7).
Caterpillar SIS machinery equipment:
Parts operator Caterpillar catalog:
1714551
OPERATOR AR
312B L
312B L
1415665
OPERATOR AR
312B L
312B L
1388866
OPERATOR AR
345B L
345B L
1725510
OPERATOR AR
938G
938G
1466910
OPERATOR AR
938G
938G
1310703
OPERATOR AR
345B L
345B L
3463844
OPERATOR AR
988G
988G
1145145
OPERATOR AR
988G
988G
1765498
OPERATOR AR-OPEN ROPS
966G, 972G
966G, 972G
1456684
OPERATOR AR
966G, 972G
966G, 972G
1834854
OPERATOR AR
312B L
312B L