3750788 RADIATOR AR Caterpillar parts
D10T2
Rating:
Alternative (cross code) number:
CA3750788
375-0788
3750788
CA3750788
375-0788
3750788
TRACK-TYPE TRACTOR,
Compatible equipment models: 3750788:
Information:
g) Remove the bolt that holds body assembly (93) in place. Remove the body assembly from pressure control valve body (94).h) Remove the O-ring seals (96) from the body assembly.j) Remove retainer (92), two springs (91), small spring (95), check valve plunger (97) and stop (99) from the valve body.k) Remove two O-ring seals (98) from the stop. l) Remove the bolts that hold opposite side cover (106) in position. Remove the cover from the valve body. Remove seals (110) from cover.m) Remove spring (103), flow control valve plunger (101), modulating relief valve spool assembly (104), sleeve (102), retainer (105), safety valve spool assembly (109) and spring (108) from the valve body.
Make a note of dowel (107) in the bore of the valve body. This dowel must be in alignment with the notch in sleeve (102) for correct assembly.
n) Remove two dowels (100) from the valve body and the two stops that the dowels hold in place.p) Disassemble the modulating relief valve spool assembly as follows: Step 1) Remove spiral snap ring (113), retainer (115), spring (112) and poppet (114) from valve spool (111).q) Disassemble the safety valve spool assembly as follows: Step 1) Remove spiral snap ring (118), retainer (120), spring (117) and poppet (119) from valve spool (116). 10. Assemble the pressure control valve as follows: Clean all parts with a cloth that is free of loose material (lint). Put a thin layer of transmission oil on all of these parts.a) Install stops (121) and (122) in pressure control valve body (94) as shown. Make sure the holes in the stops are in alignment with the holes in the valve body.b) Install one dowel in each of the holes in the valve body and through each of the stops. Make sure the dowels are below the surface of each face of the body.c) Assemble safety valve spool assembly (109) as follows:Step 1) Install the poppet, spring, retainer and snap ring (118) into the valve spool.d) Assemble modulating relief valve spool assembly (104) as follows:Step 1) Install the poppet, spring, retainer and snap ring (113) into the valve spool.e) Install spring (108) in the safety valve spool assembly. Install the valve spool assembly into the valve body as shown.f) Install the modulating relief valve spool assembly into the sleeve as shown.g) Install sleeve (102) into the valve body. Put the notch in the sleeve in correct alignment with the dowel in the bore of the valve body. h) Install spring (103) into flow control valve plunger (101). Install the plunger into the valve body as shown.j) Install three O-ring seals (110) on cover (106). Install the cover
Make a note of dowel (107) in the bore of the valve body. This dowel must be in alignment with the notch in sleeve (102) for correct assembly.
n) Remove two dowels (100) from the valve body and the two stops that the dowels hold in place.p) Disassemble the modulating relief valve spool assembly as follows: Step 1) Remove spiral snap ring (113), retainer (115), spring (112) and poppet (114) from valve spool (111).q) Disassemble the safety valve spool assembly as follows: Step 1) Remove spiral snap ring (118), retainer (120), spring (117) and poppet (119) from valve spool (116). 10. Assemble the pressure control valve as follows: Clean all parts with a cloth that is free of loose material (lint). Put a thin layer of transmission oil on all of these parts.a) Install stops (121) and (122) in pressure control valve body (94) as shown. Make sure the holes in the stops are in alignment with the holes in the valve body.b) Install one dowel in each of the holes in the valve body and through each of the stops. Make sure the dowels are below the surface of each face of the body.c) Assemble safety valve spool assembly (109) as follows:Step 1) Install the poppet, spring, retainer and snap ring (118) into the valve spool.d) Assemble modulating relief valve spool assembly (104) as follows:Step 1) Install the poppet, spring, retainer and snap ring (113) into the valve spool.e) Install spring (108) in the safety valve spool assembly. Install the valve spool assembly into the valve body as shown.f) Install the modulating relief valve spool assembly into the sleeve as shown.g) Install sleeve (102) into the valve body. Put the notch in the sleeve in correct alignment with the dowel in the bore of the valve body. h) Install spring (103) into flow control valve plunger (101). Install the plunger into the valve body as shown.j) Install three O-ring seals (110) on cover (106). Install the cover
Caterpillar SIS machinery equipment:
Caterpillar SIS
D10T2 TRACK-TYPE TRACTOR JJW00001-UP (MACHINE) POWERED BY C27 Engine »
375-0788
RADIATOR AR
D10T2 TRACK-TYPE TRACTOR JJW00001-UP (MACHINE) POWERED BY C27 Engine »
375-0788
RADIATOR AR
D10T2 TRACK-TYPE TRACTOR RAB00001-UP (MACHINE) POWERED BY C27 Engine »
375-0788
RADIATOR AR
D10T2 TRACK-TYPE TRACTOR RAB00001-UP (MACHINE) POWERED BY C27 Engine »
375-0788
RADIATOR AR
Parts radiator Caterpillar catalog:
3878408
RADIATOR GP
D10T2
D10T2
3750762
RADIATOR GP
D10T2
D10T2
3579977
RADIATOR GP
D11T
D11T
3123477
RADIATOR GP
D11T
D11T
4429613
RADIATOR AR
D11T
D11T
4429434
RADIATOR & MOUNTING GP
3512B, 3512C
3512B, 3512C
3712459
RADIATOR GP
D7R XR
D7R XR
3904485
RADIATOR GP
D6N LGP
D6N LGP
3291163
RADIATOR GP
D6N LGP, D6N OEM
D6N LGP, D6N OEM
3750762
RADIATOR GP
D10T2
D10T2
3878408
RADIATOR GP
D10T2
D10T2
3596479
RADIATOR GP
D10T2
D10T2