2408365 RESISTOR Caterpillar parts
3054, 3056
Rating:
Alternative (cross code) number:
CA2408365
240-8365
2408365
CA2408365
240-8365
2408365
GENERATOR SET,
Information:
Boom Cylinder Drift
Refer to Testing and Adjusting, RENR1957 for information on testing the boom cylinder drift.Manual Boom Lower Operation
Start the engine.
Fully extend the bucket cylinder (close bucket).
Fully retract the bucket cylinder (open bucket).
Raise the boom until the upper surface of the boom at the stick end becomes parallel to the ground. Stop the engine.
Illustration 1 g00110097
(1) Locknut (2) Adjustment screw
Remove the cap.
Loosen locknut (1) of one boom lowering control valve.
Slowly turn adjustment screw (2) clockwise until the boom starts to lower.Note: The adjustment screw on either boom lowering control valve may be used in order to lower the boom. However, both adjustment screws may be used together in order to increase the speed of lowering.Note: The adjustment screw must be replaced after three uses.
When the front equipment has been completely lowered onto the ground, turn adjustment screw (2) counterclockwise.
Tighten locknut (1) .
Replace the cap.
Before you put the machine into operation, make any necessary repairs.For additional information, consult your Caterpillar dealer.Relief Valves For Boom Cylinder Head End
Preparation
Illustration 2 g00379772
(1) Tap (power shift pressure) (2) Tap (front pump delivery pressure)
Place the machine on level ground and stop the engine.
Release the pressure in the hydraulic system. Refer to Testing And Adjusting, "Release of Pressure in the Hydraulic System" for information on releasing the hydraulic pressure.
Connect a 60000 kPa (8700 psi) pressure gauge to main pump pressure tap (2) .
Connect a 4000 kPa (580 psi) pressure gauge to tap (1) .
Start the engine and raise the hydraulic oil temperature to 55 5°C (131 9°F).
Place the power mode selector switch in the POWER MODE position.
Place the engine speed dial at position 10 and maintain the maximum engine speed with no load on the engine. After the engine has been running for 3 seconds, check the engine speed. Note: The engine speed with no load should be 1980 50 rpm.
Temporarily set the main relief valve pressure. Refer to Testing and Adjusting for information on temporarily setting the main relief valve pressure.
Start the "Service Mode" and keep the power shift pressure constant at 2450 kPa (355 psi).Note: Normal operations of the engine and pumps is necessary for the pressure adjustment. If the pressure adjustments are not correct, check the characteristic curve for the engine and the pump. If the pump flow is lower than the specification, verify that there is no air in the hydraulic system. Refer to Testing And Adjusting, "Release of Air from Main Pumps" for information on releasing air from the main pump.Test
Illustration 3 g00470088
Fully extend the boom cylinders. Hold the implement control lever in the BOOM RAISE position.
Check the pressure at pressure tap (2) .
Fully extend the boom cylinders. Hold the implement control lever in the BOOM RAISE position.
Check the pressure at pressure tap (2) .
Reset the main relief valve pressure. Refer to Testing and Adjusting for information on setting the main relief valve pressure.Note: The relief valve is set to open at 34300 490 kPa (4975 72 psi).
Refer to Testing and Adjusting, RENR1957 for information on testing the boom cylinder drift.Manual Boom Lower Operation
Start the engine.
Fully extend the bucket cylinder (close bucket).
Fully retract the bucket cylinder (open bucket).
Raise the boom until the upper surface of the boom at the stick end becomes parallel to the ground. Stop the engine.
Illustration 1 g00110097
(1) Locknut (2) Adjustment screw
Remove the cap.
Loosen locknut (1) of one boom lowering control valve.
Slowly turn adjustment screw (2) clockwise until the boom starts to lower.Note: The adjustment screw on either boom lowering control valve may be used in order to lower the boom. However, both adjustment screws may be used together in order to increase the speed of lowering.Note: The adjustment screw must be replaced after three uses.
When the front equipment has been completely lowered onto the ground, turn adjustment screw (2) counterclockwise.
Tighten locknut (1) .
Replace the cap.
Before you put the machine into operation, make any necessary repairs.For additional information, consult your Caterpillar dealer.Relief Valves For Boom Cylinder Head End
Preparation
Illustration 2 g00379772
(1) Tap (power shift pressure) (2) Tap (front pump delivery pressure)
Place the machine on level ground and stop the engine.
Release the pressure in the hydraulic system. Refer to Testing And Adjusting, "Release of Pressure in the Hydraulic System" for information on releasing the hydraulic pressure.
Connect a 60000 kPa (8700 psi) pressure gauge to main pump pressure tap (2) .
Connect a 4000 kPa (580 psi) pressure gauge to tap (1) .
Start the engine and raise the hydraulic oil temperature to 55 5°C (131 9°F).
Place the power mode selector switch in the POWER MODE position.
Place the engine speed dial at position 10 and maintain the maximum engine speed with no load on the engine. After the engine has been running for 3 seconds, check the engine speed. Note: The engine speed with no load should be 1980 50 rpm.
Temporarily set the main relief valve pressure. Refer to Testing and Adjusting for information on temporarily setting the main relief valve pressure.
Start the "Service Mode" and keep the power shift pressure constant at 2450 kPa (355 psi).Note: Normal operations of the engine and pumps is necessary for the pressure adjustment. If the pressure adjustments are not correct, check the characteristic curve for the engine and the pump. If the pump flow is lower than the specification, verify that there is no air in the hydraulic system. Refer to Testing And Adjusting, "Release of Air from Main Pumps" for information on releasing air from the main pump.Test
Illustration 3 g00470088
Fully extend the boom cylinders. Hold the implement control lever in the BOOM RAISE position.
Check the pressure at pressure tap (2) .
Fully extend the boom cylinders. Hold the implement control lever in the BOOM RAISE position.
Check the pressure at pressure tap (2) .
Reset the main relief valve pressure. Refer to Testing and Adjusting for information on setting the main relief valve pressure.Note: The relief valve is set to open at 34300 490 kPa (4975 72 psi).
Caterpillar SIS machinery equipment:
Parts resistor Caterpillar catalog:
2078726
RESISTOR
UPS 250, UPS 600G
UPS 250, UPS 600G
2678559
RESISTOR GP
525B, 535B, 545
525B, 535B, 545
1607658
RESISTOR GP
3056
3056
1915053
RESISTOR GP
3054, 3054B, 3056
3054, 3054B, 3056
1895439
RESISTOR GP
3054
3054
1472642
RESISTOR
3054, 3054B, 3054C, 3056, C4.4
3054, 3054B, 3054C, 3056, C4.4
6I1909
RESISTOR AS
3208, 3304, 3306, 3306B, 3406B, 3406C, 3408, 3408C, 3412, 3412C, 3412D, 3606, G3408
3208, 3304, 3306, 3306B, 3406B, 3406C, 3408, 3408C, 3412, 3412C, 3412D, 3606, G3408
5D8214
RESISTOR
120G, 130G, 140G, 3126, 3208, 3306, 3406B, 3406C, 3408, 3412, 3508, 3512, 3516, 768B, 769, 772, 773, 777
120G, 130G, 140G, 3126, 3208, 3306, 3406B, 3406C, 3408, 3412, 3508, 3512, 3516, 768B, 769, 772, 773, 777
2678561
RESISTOR GP
525C, 535C, 545C
525C, 535C, 545C
2655574
RESISTOR AS
ES12F
ES12F
2617479
RESISTOR AS
ES12F
ES12F
2408364
RESISTOR AS
3054, 3056
3054, 3056