Parts group 350-A:
FRAME AND BODY
LINES GP
LUBRICATION GP
Information:
(For parts list, see above)
FRAME AND BODY
BOX GP-BATTERY
Special Instruction
Service Magazine
Procedure For Replacing Batteries, Battery Cables Or Disconnect Switches {1401,1402,1411}
1989/05/01
1989/05/01
Procedure For Replacing Batteries, Battery Cables Or Disconnect Switches {1401,1402,1411}
1989/05/01
1989/05/01
BRAKE GP-SWING
New Swing Motors Increase Brake Capacity And Improve Reliability To The Swing Drive{5460,5058,5454}
1997/05/26
1997/05/26
CHASSIS GP
Polarity Connections And Use Of Service Meter Films When Service Meter Kits Are Installed{7480,7000}
1987/02/16
1987/02/16
CONTROL GP-SWING BRAKE
New Swing Motors Increase Brake Capacity And Improve Reliability To The Swing Drive{5460,5058,5454}
1997/05/26
1997/05/26
COUNTERWEIGHT GP
Service Letter-NACD
Inspect And Replace Cracked Counterweights On Certain 350l Excavators
Inspect And Replace Cracked Counterweights On Certain 350l Excavators
Inspect And Replace Cracked Counterweights On Certain 350l Excavators
Disassembly and Assembly
Service Magazine
DOOR GP
Proper Maintenance Improves Performance of Lock Cylinders {0645, 7273, 7308}
Proper Maintenance Improves Performance of Lock Cylinders {0645, 7273, 7308}
Proper Maintenance Improves Performance of Lock Cylinders {0645, 7273, 7308}
FRAME GP
Service Letter-NACD
Product Support Program For Relocating The Boss On The Boom Foot Pin On Certain 350L Excavators
Product Support Program For Relocating The Boss On The Boom Foot Pin On Certain 350L Excavators
Product Support Program For Relocating The Boss On The Boom Foot Pin On Certain 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
Product Support Program For Increasing The Weld On The Upperframe Tower Area On Certain 350L Material Handler Excavators
Product Support Program For Increasing The Weld On The Upperframe Tower Area On Certain 350L Material Handler Excavators
Product Support Program For Increasing The Weld On The Upperframe Tower Area On Certain 350L Material Handler Excavators
Service Letter-Australia
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
Service Letter-CFEL
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
Service Letter-CSARL
The Upper Frame Needs To Be Weld Repaired And/or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Upper Frame Rail Doubler Plate In The Boom Tower Area For Cracks On Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Upper Frame Rail Doubler Plate In The Boom Tower Area For Cracks On Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Upper Frame Rail Doubler Plate In The Boom Tower Area For Cracks On Certain 350 And 350L Excavators
Service Letter-Americas
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
Service Letter-Brazil
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
Technical Information Bulletin
Bolts That Retain Guides for Track Roller Frame To Carbody Extension/Retraction May Require Additional Tightening
Bolts That Retain Guides for Track Roller Frame To Carbody Extension/Retraction May Require Additional Tightening
Bolts That Retain Guides for Track Roller Frame To Carbody Extension/Retraction May Require Additional Tightening
Service Letter-China
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
Service Letter-Asia
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
Service Letter-APD
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Inspected At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
The Upper Frame Needs To Be Weld Repaired And/Or Reinforced At The Spreader Plate And At The Frame Rail Doubler Plate In The Boom Tower Area Of Certain 350 And 350L Excavators
Service Magazine
GEAR & BEARING GP
Service Letter-NACD
Product Support Program For Replacing Swing Bearing Dust Seals On Certain 325, 330, And 350 Excavators
Product Support Program For Replacing Swing Bearing Dust Seals On Certain 325, 330, And 350 Excavators
Product Support Program For Replacing Swing Bearing Dust Seals On Certain 325, 330, And 350 Excavators
Service Letter-Australia
Service Letter-CFEL
Service Letter-CSARL
Service Letter-Americas
Service Letter-Brazil
Specifications
Service Letter-China
Product Support Program For Replacing Swing Bearing Dust Seals On Certain 325, 330, And 350 Excavators
Product Support Program For Replacing Swing Bearing Dust Seals On Certain 325, 330, And 350 Excavators
Product Support Program For Replacing Swing Bearing Dust Seals On Certain 325, 330, And 350 Excavators
Service Letter-Asia
Service Letter-APD
Disassembly and Assembly
Service Magazine
Procedure for Measuring Swing Bearing Movement on 300 A Series Hydraulic Excavators {7063}
2010/02/15
2010/02/15
An Improved Bolt Tightening Procedure for the Critical Joints Is Now Used on All Excavators {4050, 4164, 5459, 7063}
An Improved Bolt Tightening Procedure for the Critical Joints Is Now Used on All Excavators {4050, 4164, 5459, 7063}
An Improved Bolt Tightening Procedure for the Critical Joints Is Now Used on All Excavators {4050, 4164, 5459, 7063}
GUARD GP
Service Letter-NACD
Product Support Program For Replacing The Track Rollers On Certain 350 And 350L Excavators
Product Support Program For Replacing The Track Rollers On Certain 350 And 350L Excavators
Product Support Program For Replacing The Track Rollers On Certain 350 And 350L Excavators
Service Letter-Australia
Service Letter-CFEL
Service Letter-CSARL
Service Letter-Americas
Technical Information Bulletin
Service Letter-China
Product Support Program For Replacing The Track Rollers On Certain 350 And 350L Excavators
Product Support Program For Replacing The Track Rollers On Certain 350 And 350L Excavators
Product Support Program For Replacing The Track Rollers On Certain 350 And 350L Excavators
Service Letter-Asia
Service Letter-APD
Service Magazine
New Swing Motors Increase Brake Capacity And Improve Reliability To The Swing Drive{5460,5058,5454}
1997/05/26
1997/05/26
HOOD GP
Disassembly and Assembly
LUBRICATION GP
General Service Information
Service Letter-NACD
Product Support Program For Installing An Autolube Group To Prevent Pin And Bushing Noise Or Pin Galling On Certain 350 And 350L Excavator And Material Handlers
Product Support Program For Installing An Autolube Group To Prevent Pin And Bushing Noise Or Pin Galling On Certain 350 And 350L Excavator And Material Handlers
Product Support Program For Installing An Autolube Group To Prevent Pin And Bushing Noise Or Pin Galling On Certain 350 And 350L Excavator And Material Handlers
Service Magazine
A Seal Kit Is Available for the Service of the Swivel in the Hose Reel Group {7510, 7540}
2002/11/04
2002/11/04
MISCELLANEOUS INFORMATION
PUMP GP-LUBRICATION
Reuse And Salvage Guidelines
Specifications and Reusability for Hydraulic Gear Pumps and Motors (Groups 1, 2, and 3) {5061, 5073}
Specifications and Reusability for Hydraulic Gear Pumps and Motors (Groups 1, 2, and 3) {5061, 5073}
Specifications and Reusability for Hydraulic Gear Pumps and Motors (Groups 1, 2, and 3) {5061, 5073}
REEL GP-HOSE
Service Magazine
A Seal Kit Is Available for the Service of the Swivel in the Hose Reel Group {7510, 7540}
2002/11/04
2002/11/04
REPAIR GP-FRAME
SEAL GP
Special Instruction
Assembly and Installation of Inverted Duo-Cone Seals{7561}
Assembly and Installation of Inverted Duo-Cone Seals{7561}
Assembly and Installation of Inverted Duo-Cone Seals{7561}
STRUCTURAL GP
Service Magazine
SWING GP
Service Letter-NACD
Product Support Program For Replacing Swing Bearing Dust Seals On Certain 325, 330, And 350 Excavators
Product Support Program For Replacing Swing Bearing Dust Seals On Certain 325, 330, And 350 Excavators
Product Support Program For Replacing Swing Bearing Dust Seals On Certain 325, 330, And 350 Excavators
Service Letter-Australia
Service Letter-CFEL
Service Letter-CSARL
Service Letter-Americas
Service Letter-Brazil
Service Letter-China
Service Letter-Asia
Service Letter-APD
Service Magazine
TOOLS
Tool Operating Manual
NEHS1214: 455-0126 Nitrogen Booster Pump Group {0374, 0599, 0647, 0756, 4263, 4331, 5077, 7200}
NEHS1214: 455-0126 Nitrogen Booster Pump Group {0374, 0599, 0647, 0756, 4263, 4331, 5077, 7200}
NEHS1214: 455-0126 Nitrogen Booster Pump Group {0374, 0599, 0647, 0756, 4263, 4331, 5077, 7200}
NEHS1259: 469-7632 Swing Gearbox Lifting Tool for 6015-6090 Hydraulic Mining Shovel {0629, 7000}
NEHS1259: 469-7632 Swing Gearbox Lifting Tool for 6015-6090 Hydraulic Mining Shovel {0629, 7000}
NEHS1259: 469-7632 Swing Gearbox Lifting Tool for 6015-6090 Hydraulic Mining Shovel {0629, 7000}
SUSPENSION GP
Assembly of 175-5507 and 361-3889 Nitrogen Charging Groups and 175-7410 Auxiliary Fitting Group{0647, 7200}
Assembly of 175-5507 and 361-3889 Nitrogen Charging Groups and 175-7410 Auxiliary Fitting Group{0647, 7200}
Assembly of 175-5507 and 361-3889 Nitrogen Charging Groups and 175-7410 Auxiliary Fitting Group{0647, 7200}
NEHS1214: 455-0126 Nitrogen Booster Pump Group {0374, 0599, 0647, 0756, 4263, 4331, 5077, 7200}
NEHS1214: 455-0126 Nitrogen Booster Pump Group {0374, 0599, 0647, 0756, 4263, 4331, 5077, 7200}
NEHS1214: 455-0126 Nitrogen Booster Pump Group {0374, 0599, 0647, 0756, 4263, 4331, 5077, 7200}