5S0836 SEGMENT GROUP Caterpillar parts
D5
Rating:
Alternative (cross code) number:
CA5S0836
5S-0836
5S0836
CA5S0836
5S-0836
5S0836
Weight: 0.25 pounds 0 kg.
TRACK-TYPE TRACTOR,
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
5S0836 Segment Group for Catterpillar 7P2636 943 953 953B
SOLOGEAR Part number: UNN60-0017, 5S0836, 7P2636
SOLOGEAR Part number: UNN60-0017, 5S0836, 7P2636
RAParts 5S0836 CR4408 7P2636 Fits CAT Fits Caterpillar Segment Group 943 953 953B
Reliable Aftermarket Parts One New Aftermarket Replacement Segment Group That Fits Caterpillar Models: 943, 953, 953B Includes || OEM Numbers Are Provided for Reference Only. Please Verify Fit Prior To Ordering. || Please Note: Some Listings Use Stock Images for Reference and May Differ from the Actual Product. || This Aftermarket Part Is Made to Meet or Exceed Manufacturer (OEM) Specifications. || All OEM part numbers and logos are to be used for identification purposes only.
Reliable Aftermarket Parts One New Aftermarket Replacement Segment Group That Fits Caterpillar Models: 943, 953, 953B Includes || OEM Numbers Are Provided for Reference Only. Please Verify Fit Prior To Ordering. || Please Note: Some Listings Use Stock Images for Reference and May Differ from the Actual Product. || This Aftermarket Part Is Made to Meet or Exceed Manufacturer (OEM) Specifications. || All OEM part numbers and logos are to be used for identification purposes only.
Stevens Lake Parts One New Segment Group Fits CAT, Fits Caterpillar 943, 953, 953B Models Interchangeable with 5S0836, 5S0836-A, 7P2636, 7P2636-A, CR4408, CR4408V, UNN60-0017
Stevens Lake Parts One New Aftermarket Replacement Segment Group That || This Is An Aftermarket Replacement Part Made To Meet Or Exceed OEM Specifications. || OEM Numbers Are Provided for Reference Only. Please Verify Fit Prior To Ordering. || Please Note: Some Listings Use Stock Images for Reference and May Differ from the Actual Product. || This Aftermarket Part Is Made to Meet or Exceed Manufacturer (OEM) Specifications.
Stevens Lake Parts One New Aftermarket Replacement Segment Group That || This Is An Aftermarket Replacement Part Made To Meet Or Exceed OEM Specifications. || OEM Numbers Are Provided for Reference Only. Please Verify Fit Prior To Ordering. || Please Note: Some Listings Use Stock Images for Reference and May Differ from the Actual Product. || This Aftermarket Part Is Made to Meet or Exceed Manufacturer (OEM) Specifications.
5S0836
Images:
Compatible equipment models: 5S0836:
Information:
Initial Start-Up
Preparing a generator for parallel operation requires special attention. Before you attempt to parallel units for the first time, check all the units for the following three conditions.
Same phase rotation
Same alternating current frequency
Same voltage adjustment
Check the phase rotation.The phase rotation of the paralleled units must be the same. There are two methods that are used to determine whether the phase rotation of the incoming unit and the on line units are the same. These methods are listed below.
Using a phase rotation meter
Using a set of three light bulbsHow to determine the proper phase rotation by using three light bulbs is described below.
Illustration 1 g00695380
When servicing or repairing electric power generation equipment:Make sure the unit is off-line (disconnected from utility and/or other generators power service), and either locked out or tagged DO NOT OPERATE. Remove all fuses.
Connect the light bulbs with rated voltage between the generator leads and the corresponding line phase. For example, connect terminal 1 to line 1 across the open circuit breaker.
Start the units which are going to be paralleled. Bring the units up to speed. As the units approach the same speed, the lights will start to blink.
If the lights blink in sequence, one of the units is connected backward. In order to correct the problem, stop the units. Remove generator leads 1 and 3 at the circuit breaker. Exchange these generator leads. This procedure reverses the direction of phase rotation. Terminal 2 should always be connected to line 2. Go to 5.
If the lights blink in unison, the phase rotation of both generators is the same. The first condition of initial startup has been met.
Adjust the frequency.The speed of the units that will be paralleled must be the same. Speed is proportional to the alternating current frequency.
Allow each electric set to run under load for about 30 minutes.
Adjust the governor control to give rated frequency at full load.
Remove the load and check the high idle speed. The high idle speed should be approximately 2 to 5 percent above full load speed for governors that are equipped with droop. If these speeds cannot be obtained, contact your Caterpillar dealer.
For the most consistent results, repeat 2.b and 2.c until the second condition of initial startup has been met.
Adjust the voltage.There are two fundamentally different methods for reactive power equalization.
Reactive droop compensation (also known as individual compensation)
Cross current compensation (also known as differential compensation)In the reactive droop compensation the voltage regulator causes an individual generator output voltage to change in proportion to the reactive current. The reactive current is measured with a current transformer (CT).The reactive current can be either lagging or leading. As the lagging reactive current increases, the voltage regulator will cause the generator output voltage to lower (droop) proportionally. As the leading reactive current increases, the voltage regulator will cause the generator output voltage to rise proportionally.This method will tend to reduce the reactive current for better KVAR sharing with other units. The reactive droop compensation is a standard method on the Cat generator
Preparing a generator for parallel operation requires special attention. Before you attempt to parallel units for the first time, check all the units for the following three conditions.
Same phase rotation
Same alternating current frequency
Same voltage adjustment
Check the phase rotation.The phase rotation of the paralleled units must be the same. There are two methods that are used to determine whether the phase rotation of the incoming unit and the on line units are the same. These methods are listed below.
Using a phase rotation meter
Using a set of three light bulbsHow to determine the proper phase rotation by using three light bulbs is described below.
Illustration 1 g00695380
When servicing or repairing electric power generation equipment:Make sure the unit is off-line (disconnected from utility and/or other generators power service), and either locked out or tagged DO NOT OPERATE. Remove all fuses.
Connect the light bulbs with rated voltage between the generator leads and the corresponding line phase. For example, connect terminal 1 to line 1 across the open circuit breaker.
Start the units which are going to be paralleled. Bring the units up to speed. As the units approach the same speed, the lights will start to blink.
If the lights blink in sequence, one of the units is connected backward. In order to correct the problem, stop the units. Remove generator leads 1 and 3 at the circuit breaker. Exchange these generator leads. This procedure reverses the direction of phase rotation. Terminal 2 should always be connected to line 2. Go to 5.
If the lights blink in unison, the phase rotation of both generators is the same. The first condition of initial startup has been met.
Adjust the frequency.The speed of the units that will be paralleled must be the same. Speed is proportional to the alternating current frequency.
Allow each electric set to run under load for about 30 minutes.
Adjust the governor control to give rated frequency at full load.
Remove the load and check the high idle speed. The high idle speed should be approximately 2 to 5 percent above full load speed for governors that are equipped with droop. If these speeds cannot be obtained, contact your Caterpillar dealer.
For the most consistent results, repeat 2.b and 2.c until the second condition of initial startup has been met.
Adjust the voltage.There are two fundamentally different methods for reactive power equalization.
Reactive droop compensation (also known as individual compensation)
Cross current compensation (also known as differential compensation)In the reactive droop compensation the voltage regulator causes an individual generator output voltage to change in proportion to the reactive current. The reactive current is measured with a current transformer (CT).The reactive current can be either lagging or leading. As the lagging reactive current increases, the voltage regulator will cause the generator output voltage to lower (droop) proportionally. As the leading reactive current increases, the voltage regulator will cause the generator output voltage to rise proportionally.This method will tend to reduce the reactive current for better KVAR sharing with other units. The reactive droop compensation is a standard method on the Cat generator
Caterpillar parts catalog:
Parts segment Caterpillar catalog:
8P9453
SEGMENT
D5, D5B, D5E
D5, D5B, D5E
9P0984
SEGMENT (standard)
953, D5, D5B
953, D5, D5B
3S7460
SEGMENT
594, 594H, D9G, D9H
594, 594H, D9G, D9H
5M5563
SEGMENT ASSEM.
561B, 561C, 572G, 594, 594H
561B, 561C, 572G, 594, 594H
1K5815
SEGMENT
561D, 571G, 583H, 583K
561D, 571G, 583H, 583K
5S0054
SEGMENT GROUP
983, D8H
983, D8H
5S0724
SEGMENT (std.)
561C, D5
561C, D5
3S9983
SEGMENT (std.)
955K, 955L, D6C
955K, 955L, D6C
3S9201
SEGMENT
977K
977K
6K1430
SEGMENT GROUP
955H, 955L
955H, 955L