8N1263 SHELL A Caterpillar parts
Rating:
Alternative (cross code) number:
CA8N1263
8N-1263
8N1263
CA8N1263
8N-1263
8N1263
Weight: 1 pounds 0 kg.
Information:
Illustration 2 g06314893
Illustration 3 g06314901
Install plate (3) and bolts (2) on each side of pin (5).
Attach a suitable lifting device to pin assembly (14). The weight of pin assembly (14) is approximately 28 kg (62 lb). Install pin assembly (14) and install bolt (15).
Attach Tooling (B) and a suitable lifting device to boom (13) and pin assembly (14). The combined weight of boom (13) and the stick cylinder is approximately 2038 kg (4493 lb). Position boom (13) onto the machine.
Illustration 4 g06315248
Apply Tooling (E) to pin assembly (20). Attach a suitable lifting device to pin assembly (20). The weight of pin assembly (20) is approximately 44 kg (97 lb). Use Tooling (A) and a suitable lifting device to install pin assembly (20).
Illustration 5 g06315257
Measure the total clearance between the boom and the upper frame at the bore for the boom foot pin assembly. The total clearance of Dimension (a) plus Dimension (b) must not be more than 1.6 mm (0.06 inch). If the total clearance is less than 1.6 mm (0.06 inch), the addition of shims between the boom and the upper frame will not be required. If the total clearance is more than 1.6 mm (0.06 inch), add the correct thickness of shims to obtain the required clearance.
Illustration 6 g06314827
If shims (25) need to be installed, attach a suitable lifting device to Tooling (C). The weight of Tooling (C) is approximately 136 kg (300 lb). Attach Tooling (C) to pin assembly (20). Use Tooling (C) to remove pin assembly (20). The combined weight of Tooling (C) and pin assembly (20) is approximately 180 kg (397 lb).
Install the correct number of shims. Repeat Step 5 and Step 6.
Illustration 7 g06314826
Install bolt (21) that retains pin assembly (20).
Illustration 8 g06314825
Connect harness assembly (16). Connect hose assemblies (17), (18), and (19). Tighten hose assemblies (17) and (19) to a torque of 160 16 N m (118 12 lb ft).
Illustration 9 g06314824
Install handrail (11) and bolts (12). Close cover (10) of the storage box.
Illustration 10 g01212899
Install step (9).
Install bolts (8).
Illustration 11 g01212891
Install cover (7) and bolts (6).
Illustration 12 g06314863
Remove bolts (2) and retaining plates (3) from pin (5).
Illustration 13 g06314822
Use Tooling (A) to drive pin (5) so that the pin is flush with the boom. Remove Tooling (A) and install Tooling (A) onto the other side of pin (5).
Attach a suitable lifting device to boom cylinder (4). The weight of boom cylinder (4) is approximately 290 kg (633 lb). Raise boom cylinder (4) into position. Install any shims that were present. Install Tooling (A) into pin (5). Use a hammer to drive pin (5) into boom cylinder (4). Remove Tooling (A). Repeat for the other boom cylinder (4).
Illustration 14 g06314820
Install the spacer and retainer plate (3). Install bolts (2). Repeat for other side.
Connect hose assembly (1).End By:
Install the stick.
Parts shell Caterpillar catalog:
8J9356
SHELL A
Caterpillar
Caterpillar
8D1329
SHELL A
Caterpillar
Caterpillar
8C2568
SHELL
Caterpillar
Caterpillar
8B8406
SHELL A.
Caterpillar
Caterpillar
8B6564
SHELL A.
Caterpillar
Caterpillar
8B5111
SHELL A.
Caterpillar
Caterpillar
8T9722
SHELL-LAMP
Caterpillar
Caterpillar
8U9478
SHELL
Caterpillar
Caterpillar
8U9571
SHELL
Caterpillar
Caterpillar
9B0254
SHELL A.
Caterpillar
Caterpillar
9B0892
SHELL A.
Caterpillar
Caterpillar
9B5835
SHELL A.-INNER
Caterpillar
Caterpillar