2485564 SHUTOFF GP-AIR Caterpillar parts
3126B, C7, C9
Rating:
Alternative (cross code) number:
CA2485564
248-5564
2485564
CA2485564
248-5564
2485564
INDUSTRIAL ENGINE, PETROLEUM ENGINE,
Information:
And Install Connecting Rod Bearings
START BY:a. remove oil pump1. Check the connecting rods and caps for their identification and location. 2. Turn the crankshaft until the connecting rod caps are in the position shown.3. Remove nuts (1) and the cap from the connecting rod. Remove the lower half of the bearing from the cap.4. Push the connecting rod away from the crankshaft. Remove the upper half of the bearing from the connecting rod. Install the bearings dry when the clearance checks are made. Put clean engine oil on the bearings for final assembly.5. Install the upper half of the bearing in the connecting rod.6. Pull the connecting rod slowly on to the crankshaft.7. Install the lower half of the bearing in the cap. Be sure the tabs in the back of bearings are in the tab grooves of the connecting rod and cap. 8. Use Plastigage (A) to check the bearing clearance.9. Put Plastigage (A) on the bearing.10. Put clean engine oil on the threads of the rod bolts and seat surfaces of the nuts. Be sure the cylinder numbers on the rod cap and rod are the same and are on the same side of the connecting rod. Numbers are on the same side of the rod and cap as are the bearing tab slots. If new rods are installed, put the cylinder number on the rod and cap. Do not turn the crankshaft when Plastigage (A) is in position.
Do not use an impact wrench to tighten the bolts the additional 120° 5° when the bearing clearance is being checked.
11. Install rod caps (2). Install the nuts. Tighten each nut to a torque of 80 8 N m (60 6 lb.ft.). Put a mark on the nuts and cap, and tighten the nuts an extra 120° 5° from the mark. Remove the rod cap. Remove Plastigage (A), and check the bearing clearance. The bearing clearance must be 0.071 to 0.168 mm (.0028 to .0066 in.) for new bearings. Maximum clearance with used bearings is 0.25 mm (.010 in.).12. Put clean engine oil on lower half of the bearing. Install the rod cap again. Tighten each nut to a torque of 80 8 N m (60 6 lb.ft.). Put a mark on the nuts and cap, and tighten the nuts an extra 120° 5° from mark.13. Do Steps 1 through 12 for the remainder of the connecting rod bearings.END BY:a. install oil pump
START BY:a. remove oil pump1. Check the connecting rods and caps for their identification and location. 2. Turn the crankshaft until the connecting rod caps are in the position shown.3. Remove nuts (1) and the cap from the connecting rod. Remove the lower half of the bearing from the cap.4. Push the connecting rod away from the crankshaft. Remove the upper half of the bearing from the connecting rod. Install the bearings dry when the clearance checks are made. Put clean engine oil on the bearings for final assembly.5. Install the upper half of the bearing in the connecting rod.6. Pull the connecting rod slowly on to the crankshaft.7. Install the lower half of the bearing in the cap. Be sure the tabs in the back of bearings are in the tab grooves of the connecting rod and cap. 8. Use Plastigage (A) to check the bearing clearance.9. Put Plastigage (A) on the bearing.10. Put clean engine oil on the threads of the rod bolts and seat surfaces of the nuts. Be sure the cylinder numbers on the rod cap and rod are the same and are on the same side of the connecting rod. Numbers are on the same side of the rod and cap as are the bearing tab slots. If new rods are installed, put the cylinder number on the rod and cap. Do not turn the crankshaft when Plastigage (A) is in position.
Do not use an impact wrench to tighten the bolts the additional 120° 5° when the bearing clearance is being checked.
11. Install rod caps (2). Install the nuts. Tighten each nut to a torque of 80 8 N m (60 6 lb.ft.). Put a mark on the nuts and cap, and tighten the nuts an extra 120° 5° from the mark. Remove the rod cap. Remove Plastigage (A), and check the bearing clearance. The bearing clearance must be 0.071 to 0.168 mm (.0028 to .0066 in.) for new bearings. Maximum clearance with used bearings is 0.25 mm (.010 in.).12. Put clean engine oil on lower half of the bearing. Install the rod cap again. Tighten each nut to a torque of 80 8 N m (60 6 lb.ft.). Put a mark on the nuts and cap, and tighten the nuts an extra 120° 5° from mark.13. Do Steps 1 through 12 for the remainder of the connecting rod bearings.END BY:a. install oil pump
Caterpillar SIS machinery equipment:
Caterpillar parts catalog:
Parts shutoff Caterpillar catalog:
1204517
SHUTOFF GP-AIR
3508B, 3512B, 3516B
3508B, 3512B, 3516B
2080823
SHUTOFF GP-AIR
3512B, 3516B, PM3516
3512B, 3516B, PM3516
2W8817
SHUTOFF GP-AIR
D379, D379A, D379B, D398, D398A, D398B, D399
D379, D379A, D379B, D398, D398A, D398B, D399
7W6466
SHUTOFF GP-ELECTRICAL
3304, 3304B, 3306, 3306B, 3406B
3304, 3304B, 3306, 3306B, 3406B
2264752
SHUTOFF GP-AIR
3406B, 3406E, C-15, C11, C13, C15, C18, C7, C9, CX31-C13I, CX31-C15I, CX31-C9I, CX35-P800, TH31-E61, TH35-C11I, TH35-C13I, TH35-C13T, TH35-C15I, TH35-C15T
3406B, 3406E, C-15, C11, C13, C15, C18, C7, C9, CX31-C13I, CX31-C15I, CX31-C9I, CX35-P800, TH31-E61, TH35-C11I, TH35-C13I, TH35-C13T, TH35-C15I, TH35-C15T
1184506
SHUTOFF GP-MANUAL
3406B, 3406C
3406B, 3406C
2W5216
SHUTOFF GP-AIR
3512, 3516, 3516B, G3516
3512, 3516, 3516B, G3516
2882763
SHUTOFF GP-AIR
3508, 3508B, 3508C, 3512, 3512B, 3512C, 3516B, 3516C, SPF343, SPT343
3508, 3508B, 3508C, 3512, 3512B, 3512C, 3516B, 3516C, SPF343, SPT343
2727098
SHUTOFF GP-AIR
3508, 3508B, 3508C, 3512, 3512B, 3512C, 3516B, SPF343, SPS343, SPT343
3508, 3508B, 3508C, 3512, 3512B, 3512C, 3516B, SPF343, SPS343, SPT343
2693902
SHUTOFF GP-AIR
C7, C9, CX31-C9I, TH31-E61
C7, C9, CX31-C9I, TH31-E61
2W8198
SHUTOFF GP-ELECTRICAL
3304, 3304B, 3306, 3306B, 3306C, 3406B, 3406C, PM-465, R1300, R1300G, RM-250C, RM-350B, RR-250, RR-250B, SM-350, SS-250
3304, 3304B, 3306, 3306B, 3306C, 3406B, 3406C, PM-465, R1300, R1300G, RM-250C, RM-350B, RR-250, RR-250B, SM-350, SS-250
1640849
SHUTOFF GP-AIR
3406C
3406C