1247240 SPRAY GP-WATER Caterpillar parts
RM-250C, RR-250, RR-250B, SS-250
Rating:
Alternative (cross code) number:
CA1247240
124-7240
1247240
CA1247240
124-7240
1247240
RECLAIMER MIXER, SOIL STABILIZER,
Compatible equipment models: 1247240:
Information:
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A - Loctite 5900 -
B - Loctite 243 -
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Do not turn the crankshaft or the camshaft while the camshaft gear is removed. If the front gear group is not correctly timed during installation, interference can occur between the pistons and the valves, resulting in damage to the engine.
Illustration 1 g01047263
Apply Tooling (B) to the serrations of studs (18). Install the studs in plate (16).
Install the integral seal on the dowel pins on the cylinder block. Note: Apply Tooling (A) to the bottom of the integral seal in order to fill the space at the cylinder block, the front housing, and the engine oil pan.
Install plate (16) on the dowel pins on the cylinder block. Install new locking bolts (17) (Marked "X") in order to fasten the front plate to the cylinder block. Tighten the locking bolts to a torque of 55 N m (41 lb ft). Note: Apply Tooling (B) to the bolts.
Illustration 2 g01056102
Install stub shaft (15). Apply Tooling (B) to the studs and the bolt for stub shaft (15). Tighten nuts (14) and the bolt to a torque of 55 10 N m (41 7 lb ft).
Install shaft assembly (13). Do not tighten nuts (12) and the bolt for the shaft assembly at this time. The nuts and the bolt for shaft assembly (13) will need to be tightened when the backlash is adjusted.
Adjust the backlash between the camshaft gear and the adjustable idler gear assembly. The backlash should be 0.356 0.254 mm (0.014 0.010 inch). Refer to Testing and Adjusting, "Gear Group (Front) - Time" for the backlash adjustment procedure. Tighten nuts (12) and the bolt to a torque of 55 10 N m (41 7 lb ft).
Install stub shaft (10). Apply Tooling (B) to bolts (11). Install bolts (11) and tighten to a torque of 55 10 N m (41 7 lb ft) in sequence. (1, 3, 4, 5, 2, 1, 2, 3, 4, 5, 1). Note: Mark bolts (11) in clockwise order from one to five. These will be the numbers for the torque sequence in step 6.
Illustration 3 g01047231
Position cluster gear assembly (1) on the stub shaft. Ensure that the timing marks are aligned on the cluster gear assembly and the crankshaft gear.
Apply Tooling (B) to bolts (3). Position plate (2) with the
Table 1
Required Tools
Tool Part Number Part Description Qty
A - Loctite 5900 -
B - Loctite 243 -
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Do not turn the crankshaft or the camshaft while the camshaft gear is removed. If the front gear group is not correctly timed during installation, interference can occur between the pistons and the valves, resulting in damage to the engine.
Illustration 1 g01047263
Apply Tooling (B) to the serrations of studs (18). Install the studs in plate (16).
Install the integral seal on the dowel pins on the cylinder block. Note: Apply Tooling (A) to the bottom of the integral seal in order to fill the space at the cylinder block, the front housing, and the engine oil pan.
Install plate (16) on the dowel pins on the cylinder block. Install new locking bolts (17) (Marked "X") in order to fasten the front plate to the cylinder block. Tighten the locking bolts to a torque of 55 N m (41 lb ft). Note: Apply Tooling (B) to the bolts.
Illustration 2 g01056102
Install stub shaft (15). Apply Tooling (B) to the studs and the bolt for stub shaft (15). Tighten nuts (14) and the bolt to a torque of 55 10 N m (41 7 lb ft).
Install shaft assembly (13). Do not tighten nuts (12) and the bolt for the shaft assembly at this time. The nuts and the bolt for shaft assembly (13) will need to be tightened when the backlash is adjusted.
Adjust the backlash between the camshaft gear and the adjustable idler gear assembly. The backlash should be 0.356 0.254 mm (0.014 0.010 inch). Refer to Testing and Adjusting, "Gear Group (Front) - Time" for the backlash adjustment procedure. Tighten nuts (12) and the bolt to a torque of 55 10 N m (41 7 lb ft).
Install stub shaft (10). Apply Tooling (B) to bolts (11). Install bolts (11) and tighten to a torque of 55 10 N m (41 7 lb ft) in sequence. (1, 3, 4, 5, 2, 1, 2, 3, 4, 5, 1). Note: Mark bolts (11) in clockwise order from one to five. These will be the numbers for the torque sequence in step 6.
Illustration 3 g01047231
Position cluster gear assembly (1) on the stub shaft. Ensure that the timing marks are aligned on the cluster gear assembly and the crankshaft gear.
Apply Tooling (B) to bolts (3). Position plate (2) with the
Caterpillar SIS machinery equipment:
Caterpillar SIS
RR-250 Road Reclaimer 6ED00363-00440 (MACHINE) POWERED BY 3054 Engine »
124-7240
SPRAY GP-WATER
SS-250 Soil Stabilizer 6DD00324-00389 (MACHINE) POWERED BY 3406 Engine »
124-7240
SPRAY GP-WATER
SS-250B Soil Stabilizer RR-250B Road Reclaimer 3RR00001-UP (MACHINE) POWERED BY 3406C Engine »
124-7240
SPRAY GP-WATER
RM-250C Reclaimer Mixer AWG00001-UP (MACHINE) POWERED BY 3406C Engine »
124-7240
SPRAY GP-WATER
Caterpillar parts catalog:
Parts spray Caterpillar catalog:
3676511
SPRAY GP-WATER
CB34B, CB34B XW, CC34B
CB34B, CB34B XW, CC34B
1367939
SPRAY GP-WATER
PS-150B, PS-200B
PS-150B, PS-200B
2982485
SPRAY GP-WATER
CB-54
CB-54
1229389
SPRAY GP-WATER
RM-250C, RR-250, RR-250B, SS-250
RM-250C, RR-250, RR-250B, SS-250
1207062
SPRAY GP-WATER
CB-414, CW-14, PS-150B, PS-150C, PS-200B
CB-414, CW-14, PS-150B, PS-150C, PS-200B
2562424
SPRAY GP-WATER
PS-360C
PS-360C
1465178
SPRAY AR-WATER
CB-334E, CB-335D
CB-334E, CB-335D
1312338
SPRAY GP-WATER
PF-290B
PF-290B
1663956
SPRAY GP-WATER
924H, BP22
924H, BP22
3642306
SPRAY AR-WATER
CB22B, CB24B, CB32B
CB22B, CB24B, CB32B
2982484
SPRAY GP-WATER
CB-54
CB-54
1173539
SPRAY AR-WATER
RR-250, SS-250
RR-250, SS-250