8P2184 TRANSMISSION AR Caterpillar parts
814B, 816B
Rating:
Alternative (cross code) number:
CA8P2184
8P-2184
8P2184
CA8P2184
8P-2184
8P2184
Weight: 2190 pounds 993 kg.
LANDFILL COMPACTOR, WHEEL DOZER,
Information:
Assembly And Installation Of The 6V2023 Flow Check Adapter Group
First, assemble the 6V2023 Flow Check Adapter Group as per the illustration.
Components of the 6V2023 Flow Check Adapter Group.For use on precombustion and direct injection engines without reverse flow check valves, remove the 6V2018 Pin. Next, put the 6F0612 Nut (jam nut) at the top of the threads and push the 6L3921 Washer against it. Tighten, by hand, the 6V2020 Adapter against the 6F0612 Nut and 6L3921 Washer. Install the flow check group on the desired pump bonnet and tighten the 6V2019 Nut to a maximum of 30 lb. ft. (40 N m). Begin the flow timing check.
For direct injection engines with reverse flow check valves, loosen the 6V2020 Adapter so .2" (0.5 mm) or less of the 6V2018 Pin is out of the adapter. Then, remove the 5P580 Tube. Install the flow check adapter group to the desired pump bonnet and tighten the 6V2019 Nut to 30 lb. ft. (40 N m). Turn the 6V2021 Fitting until the 6V2018 Pin starts to push on the reverse flow check valve. Some resistance will be felt when the pin pushes on the valve. Turn the fitting another one-fourth (1/4) turn and move the 6L3921 Washer against the 6V2020 Adapter and tighten, by hand, the 6F0612 Nut. Connect the 5P580 Tube and begin the flow timing check.
First, assemble the 6V2023 Flow Check Adapter Group as per the illustration.
Components of the 6V2023 Flow Check Adapter Group.For use on precombustion and direct injection engines without reverse flow check valves, remove the 6V2018 Pin. Next, put the 6F0612 Nut (jam nut) at the top of the threads and push the 6L3921 Washer against it. Tighten, by hand, the 6V2020 Adapter against the 6F0612 Nut and 6L3921 Washer. Install the flow check group on the desired pump bonnet and tighten the 6V2019 Nut to a maximum of 30 lb. ft. (40 N m). Begin the flow timing check.
For direct injection engines with reverse flow check valves, loosen the 6V2020 Adapter so .2" (0.5 mm) or less of the 6V2018 Pin is out of the adapter. Then, remove the 5P580 Tube. Install the flow check adapter group to the desired pump bonnet and tighten the 6V2019 Nut to 30 lb. ft. (40 N m). Turn the 6V2021 Fitting until the 6V2018 Pin starts to push on the reverse flow check valve. Some resistance will be felt when the pin pushes on the valve. Turn the fitting another one-fourth (1/4) turn and move the 6L3921 Washer against the 6V2020 Adapter and tighten, by hand, the 6F0612 Nut. Connect the 5P580 Tube and begin the flow timing check.
Caterpillar SIS machinery equipment:
Parts transmission Caterpillar catalog:
2781320
TRANSMISSION AR-COMPLETE
TH35-E81
TH35-E81
7G7600
TRANSMISSION AR
931C II, 933, 935B, 935C, D3B, D3C, D3C II
931C II, 933, 935B, 935C, D3B, D3C, D3C II
3926388
TRANSMISSION AR
CX31-C13I, CX31-C15I, CX31-C18I, CX31-P600
CX31-C13I, CX31-C15I, CX31-C18I, CX31-P600
3693603
TRANSMISSION AR
535D, 545D, 555D
535D, 545D, 555D
3459199
TRANSMISSION AR-CORE
CX31-C13I, CX31-C15I, CX31-C18I, CX31-C9I, CX31-P600
CX31-C13I, CX31-C15I, CX31-C18I, CX31-C9I, CX31-P600
3352599
TRANSMISSION AR-COMPLETE
CX31-C13I, CX31-C15I, CX31-C18I, CX31-C9I, CX31-P600
CX31-C13I, CX31-C15I, CX31-C18I, CX31-C9I, CX31-P600