3904298 TUBE AS Caterpillar parts
312D, 312D L, 312D2, 312D2 GC, 312D2 L, 312E, 312E L, 313D, 313D2, 313D2 LGP
Rating:
Alternative (cross code) number:
CA3904298
390-4298
3904298
CA3904298
390-4298
3904298
Weight: 15 pounds 6 kg.
EXCAVATOR,
Compatible equipment models: 3904298:
Information:
Initial Start-Up
Preparing a generator for parallel operation requires special attention. Before attempting to parallel units for the first time, all units must be checked to be sure the following three conditions are met:1. Same phase rotation2. Same alternating current frequency.3. Same voltage adjustmentPhase Rotation
The phase rotation must be the same. A set of three light bulbs is used to determine whether the phase rotation of the incoming unit and the phase rotation of the line are the same.1. Connect the light bulbs between the generator leads and the corresponding line phase, i.e., terminal 1 to line 1 across the open circuit breaker.2. Start the units to be paralleled and bring them up to speed. As they approach the same speed the lights will start to blink. a. If the lights blink in sequence one of the units is connected backward. To correct this remove generator leads 1 and 3 at the circuit breaker and exchange them. This reverses the direction of phase rotation. Line 2 should always be connected to line 2.
Never attempt to work on electrically hot wiring. Stop the electric set before rewiring generator leads. Open circuit breakers before working on the equipment which they control.
b. If lights blink in unison the phase rotation of both engines is the same, and condition 1 has been met.Frequency Adjustment
The speed of units to be paralleled must be the same. Speed refers to the alternating current frequency.1. Allow each electric set to run under load long enough for the internal temperatures to stabilize (about one hour).2. Adjust the governor control to give rated frequency at full load.3. Remove the load and check the high idle speed; it should be approximately 3% above full load speed. If these speeds can not be obtained, contact your Caterpillar dealer.4. For the most consistent results, repeat steps 2 and 3 until condition 2 has been met.Voltage Adjustment
The voltage level and voltage droop adjustments determine the amount of circulating currents between generators. Carefully matched voltage regulator adjustments will reduce the circulating currents. Loads of .8 power factor (primarily motors) require a generator voltage droop of about 5%. Voltage droop is expressed as the percentage of voltage change from no load to full load. Use the same voltmeter to make adjustments on each unit to be paralleled.1. Adjust voltage as described for Single Unit Operation, Initial Start-Up.2. With the engine running at high idle, turn the voltage droop clockwise about 1/2 of full range.If driven load is to be unity power factor, set the voltage droop control on all generators at 1/2 of full range and proceed to Step 7. If driven load is to be normal (0.8 power factor) proceed to Step 3.3. Readjust the voltage level control until the voltage is about 5% above desired voltage.4. Apply full load at .8 power factor. If a generator is to be paralleled with other generators, the voltage droop of each generator must be the same to satisfactorily divide reactive load.5. Readjust the voltage droop control
Preparing a generator for parallel operation requires special attention. Before attempting to parallel units for the first time, all units must be checked to be sure the following three conditions are met:1. Same phase rotation2. Same alternating current frequency.3. Same voltage adjustmentPhase Rotation
The phase rotation must be the same. A set of three light bulbs is used to determine whether the phase rotation of the incoming unit and the phase rotation of the line are the same.1. Connect the light bulbs between the generator leads and the corresponding line phase, i.e., terminal 1 to line 1 across the open circuit breaker.2. Start the units to be paralleled and bring them up to speed. As they approach the same speed the lights will start to blink. a. If the lights blink in sequence one of the units is connected backward. To correct this remove generator leads 1 and 3 at the circuit breaker and exchange them. This reverses the direction of phase rotation. Line 2 should always be connected to line 2.
Never attempt to work on electrically hot wiring. Stop the electric set before rewiring generator leads. Open circuit breakers before working on the equipment which they control.
b. If lights blink in unison the phase rotation of both engines is the same, and condition 1 has been met.Frequency Adjustment
The speed of units to be paralleled must be the same. Speed refers to the alternating current frequency.1. Allow each electric set to run under load long enough for the internal temperatures to stabilize (about one hour).2. Adjust the governor control to give rated frequency at full load.3. Remove the load and check the high idle speed; it should be approximately 3% above full load speed. If these speeds can not be obtained, contact your Caterpillar dealer.4. For the most consistent results, repeat steps 2 and 3 until condition 2 has been met.Voltage Adjustment
The voltage level and voltage droop adjustments determine the amount of circulating currents between generators. Carefully matched voltage regulator adjustments will reduce the circulating currents. Loads of .8 power factor (primarily motors) require a generator voltage droop of about 5%. Voltage droop is expressed as the percentage of voltage change from no load to full load. Use the same voltmeter to make adjustments on each unit to be paralleled.1. Adjust voltage as described for Single Unit Operation, Initial Start-Up.2. With the engine running at high idle, turn the voltage droop clockwise about 1/2 of full range.If driven load is to be unity power factor, set the voltage droop control on all generators at 1/2 of full range and proceed to Step 7. If driven load is to be normal (0.8 power factor) proceed to Step 3.3. Readjust the voltage level control until the voltage is about 5% above desired voltage.4. Apply full load at .8 power factor. If a generator is to be paralleled with other generators, the voltage droop of each generator must be the same to satisfactorily divide reactive load.5. Readjust the voltage droop control
Caterpillar parts catalog:
Parts tube Caterpillar catalog:
4341098
TUBE AS
312D, 312D L, 312D2, 312E, 312E L
312D, 312D L, 312D2, 312E, 312E L
4341099
TUBE AS
312D, 312D L, 312D2, 312E, 312E L
312D, 312D L, 312D2, 312E, 312E L
3729700
TUBE AS
312D, 312D L, 312D2, 312E, 312E L
312D, 312D L, 312D2, 312E, 312E L
3914241
TUBE GP-HYDRAULIC
312D, 312D L, 312D2, 312D2 GC, 312E, 312E L, 313D2
312D, 312D L, 312D2, 312D2 GC, 312E, 312E L, 313D2
3914237
TUBE GP-HYDRAULIC
312D, 312D L, 312D2, 312D2 GC, 312E, 312E L, 313D2
312D, 312D L, 312D2, 312D2 GC, 312E, 312E L, 313D2
3163874
TUBE AS
312D, 312D L, 314D CR, 314D LCR
312D, 312D L, 314D CR, 314D LCR
3904248
TUBE AS
312D, 312D L, 312D2, 312D2 GC, 312D2 L, 312E, 312E L, 313D2, 313D2 LGP
312D, 312D L, 312D2, 312D2 GC, 312D2 L, 312E, 312E L, 313D2, 313D2 LGP
3904233
TUBE AS
312D, 312D L, 312D2, 312D2 GC, 312D2 L, 312E, 312E L, 313D2, 313D2 LGP
312D, 312D L, 312D2, 312D2 GC, 312D2 L, 312E, 312E L, 313D2, 313D2 LGP
3904232
TUBE AS
312D, 312D L, 312D2, 312D2 GC, 312D2 L, 312E, 312E L, 313D2, 313D2 LGP
312D, 312D L, 312D2, 312D2 GC, 312D2 L, 312E, 312E L, 313D2, 313D2 LGP
2967041
TUBE AS
312D, 312D L
312D, 312D L
2967040
TUBE AS
312D, 312D L, 312E
312D, 312D L, 312E
3904299
TUBE AS
312D, 312D L, 312D2, 312D2 GC, 312D2 L, 312E, 312E L, 313D, 313D2, 313D2 LGP
312D, 312D L, 312D2, 312D2 GC, 312D2 L, 312E, 312E L, 313D, 313D2, 313D2 LGP