2228219 TURBOCHARGER GP Caterpillar parts
320C
Rating:
Alternative (cross code) number:
CA2228219
222-8219
2228219
CA2228219
222-8219
2228219
Weight: 15 pounds 6 kg.
EXCAVATOR,
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
Turbocharger 49179-02390 Compatible With Hyundai R160LC-7 R160LC-9S R170W-7 R170W-9S 49179-02370 49179-02390 205-6741 2056741 222-8219 49179
HENGCHUG Turbocharger || Provides smooth and strong || Boosts engine power Compatible With faster acceleration. || Reduces turbo lag Compatible With smoother power delivery. || Delivers high power output from a small engine. || Compatible With a wide range of vehicles with easy installation.
HENGCHUG Turbocharger || Provides smooth and strong || Boosts engine power Compatible With faster acceleration. || Reduces turbo lag Compatible With smoother power delivery. || Delivers high power output from a small engine. || Compatible With a wide range of vehicles with easy installation.
CTP 2228219 Basic Turbocharger Group for Model 320C
CTP For model 320C || Better performance and higher durability || Ready to ship
CTP For model 320C || Better performance and higher durability || Ready to ship
High quelity turbo Compatible With E320C,3066T 205-6741, 2056741, 222-8219, 2228219, 227-1027, 2271027, 5I-8018, 5I8018, 10R7610, ME2056741
DWQPRXNYJ Improve turbine lag, and power is on call. || Great modification potential, satisfying performance pursuit. || Sufficient air intake, full fuel combustion, more fuel efficient. || Small displacement to achieve great power, comparable to large displacement self-priming engine, push back enough || It is beneficial to the small size and light weight of the engine, saves the space in the car and improves the handling of the car.
DWQPRXNYJ Improve turbine lag, and power is on call. || Great modification potential, satisfying performance pursuit. || Sufficient air intake, full fuel combustion, more fuel efficient. || Small displacement to achieve great power, comparable to large displacement self-priming engine, push back enough || It is beneficial to the small size and light weight of the engine, saves the space in the car and improves the handling of the car.
Compatible equipment models: 2228219:
Information:
Alignment Of Single Bearing Generators - (Typical)
For information or alignment of two bearing generators make reference to Form No. SEHS7073.Do not start the alignment procedure until the electric set is permanently installed. If the electric set is moved to a different location, check the alignment and make any corrections necessary. The alignment between the generator and the engine must be correct to get maximum performance and long life from the electric set.Installation Of The Generator
REAR OF ENGINE
A. Pilot bore. B. Surface.1. Remove all dirt, burrs and paint from the contact surfaces of the generator supports and the base.
FRONT OF ENGINE
1. Indicator group. 2. Crankshaft pulley.Remove the protection material (compound) from the flywheel pilot bore (A) and from the surface (B) that makes contact with the coupling. All contact surfaces of the engine, coupling and generator must be completely clean.2. Remove the timing pointer cover from the flywheel housing. Install indicator group (1) as shown on the front of the engine with the tip of the indicator on the face of crankshaft pulley (2). Use a bar between the flywheel and flywheel housing to push the crankshaft toward the flywheel to remove all end play. Put the dial indicator in the "zero" position. Move the crankshaft to its most forward position, and make a record of the Total Indicator Reading (TIR). The TIR is the end play of the crankshaft.
FRONT OF GENERATOR
3. Plate assembly. 4. Shim pack.3. Put plate assembly (3) in position in the bore of the flywheel to check for clearance. There must be clearance between the outside diameter of the plate assembly (3) and the inside diameter of the bore in the flywheel.
Damage to the engine and/or generator can be the result if the electric set is run with a plate assembly that does not have this clearance.
4. Install a full shim pack (4) and plate assembly (3) on the generator with bolts (5). On D379, G379, D398, G398, D399 and G399 engines, tighten bolts (5) to a torque of 370 35 lb. ft. (505 45 N m). On all other engines, tighten bolts (5) to the standard torque.
INSTALL PLATE ASSEMBLY
5. Bolt.
ENGINE FLYWHEEL
6. Guide bolt.
PUT GENERATOR IN POSITION
INSTALL BOLTS
7. Bolt. 8. Bolt.5. Install guide bolt (6) in the flywheel. Put the generator in position on the engine, and install bolts (7) and (8). Tighten bolts (7) and (8) but do not bend the locks under bolts (8) at this time.6. Use dial indicator (1) to check crankshaft end play (do not use force to hold the crankshaft in position). Remove the generator. Remove only enough shims (4) to get the original amount of end play as shown in Step 2.
PUT BOLTS IN POSITION
9. Bolt. 10. Generator support.7. Install the generator and again check the crankshaft end play. After the correct amount of shims has been installed, bend the locks under bolts (8).8. Install but do not tighten all bolts (9) that fasten generator supports (10) to the base. To align the generator to the
For information or alignment of two bearing generators make reference to Form No. SEHS7073.Do not start the alignment procedure until the electric set is permanently installed. If the electric set is moved to a different location, check the alignment and make any corrections necessary. The alignment between the generator and the engine must be correct to get maximum performance and long life from the electric set.Installation Of The Generator
REAR OF ENGINE
A. Pilot bore. B. Surface.1. Remove all dirt, burrs and paint from the contact surfaces of the generator supports and the base.
FRONT OF ENGINE
1. Indicator group. 2. Crankshaft pulley.Remove the protection material (compound) from the flywheel pilot bore (A) and from the surface (B) that makes contact with the coupling. All contact surfaces of the engine, coupling and generator must be completely clean.2. Remove the timing pointer cover from the flywheel housing. Install indicator group (1) as shown on the front of the engine with the tip of the indicator on the face of crankshaft pulley (2). Use a bar between the flywheel and flywheel housing to push the crankshaft toward the flywheel to remove all end play. Put the dial indicator in the "zero" position. Move the crankshaft to its most forward position, and make a record of the Total Indicator Reading (TIR). The TIR is the end play of the crankshaft.
FRONT OF GENERATOR
3. Plate assembly. 4. Shim pack.3. Put plate assembly (3) in position in the bore of the flywheel to check for clearance. There must be clearance between the outside diameter of the plate assembly (3) and the inside diameter of the bore in the flywheel.
Damage to the engine and/or generator can be the result if the electric set is run with a plate assembly that does not have this clearance.
4. Install a full shim pack (4) and plate assembly (3) on the generator with bolts (5). On D379, G379, D398, G398, D399 and G399 engines, tighten bolts (5) to a torque of 370 35 lb. ft. (505 45 N m). On all other engines, tighten bolts (5) to the standard torque.
INSTALL PLATE ASSEMBLY
5. Bolt.
ENGINE FLYWHEEL
6. Guide bolt.
PUT GENERATOR IN POSITION
INSTALL BOLTS
7. Bolt. 8. Bolt.5. Install guide bolt (6) in the flywheel. Put the generator in position on the engine, and install bolts (7) and (8). Tighten bolts (7) and (8) but do not bend the locks under bolts (8) at this time.6. Use dial indicator (1) to check crankshaft end play (do not use force to hold the crankshaft in position). Remove the generator. Remove only enough shims (4) to get the original amount of end play as shown in Step 2.
PUT BOLTS IN POSITION
9. Bolt. 10. Generator support.7. Install the generator and again check the crankshaft end play. After the correct amount of shims has been installed, bend the locks under bolts (8).8. Install but do not tighten all bolts (9) that fasten generator supports (10) to the base. To align the generator to the
Caterpillar SIS machinery equipment:
Caterpillar SIS
320C S Hydraulic Excavator EGL00001-UP (MACHINE) POWERED BY 3066 Engine »
222-8219
TURBOCHARGER GP
320C, 320C L, 320C LN Excavators DBG00001-UP (MACHINE) POWERED BY 3066 Engine »
222-8219
TURBOCHARGER GP
320C Hydraulic Material Handler EGA00001-UP (MACHINE) POWERED BY 3066 Engine »
222-8219
TURBOCHARGER GP
320C LN Excavator AXK00001-UP (MACHINE) POWERED BY 3066 Engine »
222-8219
TURBOCHARGER GP
320C S Hydraulic Excavator BMZ00001-UP (MACHINE) POWERED BY 3066 Engine »
222-8219
TURBOCHARGER GP
Caterpillar parts catalog:
Parts turbocharger Caterpillar catalog:
1954441
TURBOCHARGER GP
D7R II
D7R II
7W5465
TURBOCHARGER GP
784B, 785, 785B
784B, 785, 785B
7N9850
TURBOCHARGER GP
950B, 950B/950E
950B, 950B/950E
6N0577
TURBOCHARGER GP
3406, 3406B, 3406C
3406, 3406B, 3406C
2195833
TURBOCHARGER GP
966F, 966F II, 972G
966F, 966F II, 972G
2611035
TURBOCHARGER GP
345D L, 972H, 980C, D8N
345D L, 972H, 980C, D8N
2W0461
TURBOCHARGER GP
572G, D7G
572G, D7G
2062642
TURBOCHARGER GP
966F, 966F II, 972G
966F, 966F II, 972G
8S6472
TURBOCHARGER ASSEMBLY
768B, 769, 824B, 825B, 826B, 834, 988
768B, 769, 824B, 825B, 826B, 834, 988
1091680
TURBOCHARGER GP
16H NA, 583R, 824G, 825G, 826G, 980G, D8R, D8R II
16H NA, 583R, 824G, 825G, 826G, 980G, D8R, D8R II