3601228 TURBOCHARGER GP Caterpillar parts
C18
Rating:
Alternative (cross code) number:
CA3601228
360-1228
3601228
CA3601228
360-1228
3601228
Weight: 66 pounds 29 kg.
INDUSTRIAL ENGINE,
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
Compatible equipment models: 3601228:
Information:
Introduction
The 374D and 390D Excavators are shipped with the stick and boom detached. It will be necessary to calibrate the Boom Regeneration Valve and Stick Regeneration Valve on the effected machines. Refer to Table 1.
Table 1
Calibration Effectivity - Calibrate These Machines Upon Delivery    
Model    Effectivity    
374D     S/N:PAP206-UP    
S/N:PAS561-UP
S/N:PAX352-UP
390D     S/N:WAG183-UP    
S/N:WAP334-UP
S/N:WBT204-UP
S/N:KCZ158-UP If the machine is equipped with BLCV with Smartboom, it will be necessary to calibrate the Boom Lowering Check Valve. If the SLCV attachment is installed, it will be necessary to calibrate the Stick Lowering Check Valve. Both check valves must be calibrated to ensure proper performance.Hydraulic Cylinder Purge Procedure
After installing the boom and/or stick, the air must be purged from the cylinders.
Set the engine speed indicator in position 1. Keep the setting throughout the procedure.
Slowly extend and retract the cylinder through approximately 75% of full cylinder travel. Repeat the sequence of cylinder extension and cylinder retraction two times. The cylinders must not be allowed to bottom out in either direction. Delay at least 4 seconds before the direction of the cylinder travel is reversed.
Slowly extend and retract the cylinder through approximately 90% of full cylinder travel. Repeat the sequence of cylinder extension and cylinder retraction six times. The cylinders must not be allowed to bottom out in either direction. Delay at least 4 seconds before the direction of the cylinder travel is reversed.
Slowly extend and retract the cylinder through full cylinder travel. Repeat the sequence of full cylinder travel two times. Do not allow hydraulic pressure to increase at the end of travel. Delay at least 4 seconds before the direction of the cylinder travel is reversed.
Check and maintain the level of the hydraulic fluid in the hydraulic tank. After the completion of the procedure, no additional special handling is necessary.Calibration
Note: Make sure all of the hydraulic lines are properly attached.Perform the required calibration using the machine monitor. Refer to Calibration, KENR8955, "374D and 390D Machine Electronic Control System".
The 374D and 390D Excavators are shipped with the stick and boom detached. It will be necessary to calibrate the Boom Regeneration Valve and Stick Regeneration Valve on the effected machines. Refer to Table 1.
Table 1
Calibration Effectivity - Calibrate These Machines Upon Delivery    
Model    Effectivity    
374D     S/N:PAP206-UP    
S/N:PAS561-UP
S/N:PAX352-UP
390D     S/N:WAG183-UP    
S/N:WAP334-UP
S/N:WBT204-UP
S/N:KCZ158-UP If the machine is equipped with BLCV with Smartboom, it will be necessary to calibrate the Boom Lowering Check Valve. If the SLCV attachment is installed, it will be necessary to calibrate the Stick Lowering Check Valve. Both check valves must be calibrated to ensure proper performance.Hydraulic Cylinder Purge Procedure
After installing the boom and/or stick, the air must be purged from the cylinders.
Set the engine speed indicator in position 1. Keep the setting throughout the procedure.
Slowly extend and retract the cylinder through approximately 75% of full cylinder travel. Repeat the sequence of cylinder extension and cylinder retraction two times. The cylinders must not be allowed to bottom out in either direction. Delay at least 4 seconds before the direction of the cylinder travel is reversed.
Slowly extend and retract the cylinder through approximately 90% of full cylinder travel. Repeat the sequence of cylinder extension and cylinder retraction six times. The cylinders must not be allowed to bottom out in either direction. Delay at least 4 seconds before the direction of the cylinder travel is reversed.
Slowly extend and retract the cylinder through full cylinder travel. Repeat the sequence of full cylinder travel two times. Do not allow hydraulic pressure to increase at the end of travel. Delay at least 4 seconds before the direction of the cylinder travel is reversed.
Check and maintain the level of the hydraulic fluid in the hydraulic tank. After the completion of the procedure, no additional special handling is necessary.Calibration
Note: Make sure all of the hydraulic lines are properly attached.Perform the required calibration using the machine monitor. Refer to Calibration, KENR8955, "374D and 390D Machine Electronic Control System".
Caterpillar SIS machinery equipment:
Caterpillar SIS
CX38-P892-C18I Petroleum Power Train Package A3X00001-UP POWERED BY C18 Industrial Engine »
360-1228
TURBOCHARGER GP
CX35-P800_C18I Petroleum Power Train Package BDN00001-UP »
360-1228
TURBOCHARGER GP
C18 Industrial Engine BDN00001-UP »
360-1228
TURBOCHARGER GP
CX31-P600-C18I Petroleum Power Train Package BDN00001-UP »
360-1228
TURBOCHARGER GP
Caterpillar parts catalog:
Parts turbocharger Caterpillar catalog:
2411703
TURBOCHARGER GP
C18, CX35-P800
C18, CX35-P800
2413005
TURBOCHARGER GP
C18, CX35-P800
C18, CX35-P800
3976200
TURBOCHARGER GP
735B, 740B, C15